HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST / J Location: A.M. �Lot 0 Zone of Contribution: In Out(_ Acreage/ < 3
Commercial: Residential: L--Street: Gj pc �
Village: Floor Plan: ' le,„..------ # Bedrooms: y
Owner: InstallerSp .`t /
Address: Phone: if,/�/
Phone:
Builder: Engineer: NiNi-\_ r S yU
c
Address: Phone:
Phone:
N/A YES / NO
1. Required#of copies received
2.Date of soils exam and percolation test not older than 2 years I.
3. 4-5 ft of naturally occurring pervious material,above water table v
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: . -
5. Water line 10 ft from septic components Var.: 1
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L �--
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,/-
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ,------�
13. Uses adjustment for maximum high groundwater -Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: J
15. System not in top or subsoil(A,B horizons)or 5' removal ..----- "
16.Proposed contours are suitable ./--
17. System meets slope requirements-min. 1/8", ''4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal f
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox -_
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: _wall:..__ commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house .---'''
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map -'
Plan reviewed by: t _