Loading...
HomeMy WebLinkAboutEngineer PlanFINISH FLOOR ELEV=52.0 RAISE 2 COVERS TO FIN. GRADE AS SHOWN WITH WATER TIGHT RISERS & COVERS FINISHED GRADE ELEV=51.51 FINISH D �G D E OVER TANK = 51.0t - 50.2f 6" CAST IRON 70 LL H4"" PVCAT1.1% FROM TANK 6` MIN 40 INV IN=47.37 10" MIN. PVC INV OUT=47.12 PVC PIPE. HYDRAULIC CEME "' 34 LF 6" C.I. AT 2% SANITARY SEWER & SEAL AROUND PIPE I I PVC TEE TO SEPTIC TANK, INV OUT=48.05 WATERTIGHT-TYP. FOR ALL 4-6" HOLES a - PENETRATIONS TYPICAL SYSTEM PROFILE NOTE: ALL MATERIALS SHALL MEET H-20 LOADING REQUIREMENTS. GARBAGE GRINDERS NOT ALLOWED WITH THIS DESIGN. SET CAST IRON FRAME AND COVER AT FINISH GRADE RISER AND COVER TO BE WATERTIGHT FINISH GRADE=49.2t FIRST 2' (TO BE LEVEL) 2- 20 LF 4` PVC AT 1 % FROM D-BOX GAS BAFFLE - SET ONE COVER TO FINISH GRADE PER CHAMBER ROW OVER INLET PIPE WITH WATERTIGHT CAST IRON FRAMES AND COVERS -7 FINISHED GRADE OVER LEACHING CHAMBERS = 48.0 - 50.0 2" OF % % "DOUBLE 9" Cover WASHED PEASTONE 36" (max) Cover OR FILTER FABRIC CONCRETE LEACHING CHAMBER TOP OF BAFFLE ° �- 4" DIA. PVC " INV IN=46.37 6" SUMP . INV OUT=46.20 3,500 GALLON TWO-COMPARIMENT ° 6" CRUSHED , •° SEEM TANK (H20 LOADING STONE BASE` '• SHOREY ST3500 H-20 OR EQUAL DON BOX TO BE INSTALLED ON A LEVEL STABLE BASE SHOREY DB-9 H-20 OR EQUAL SEPTIC TANK TO BE INSPECTED & CLEANED ANNUALLY (6) 57'L x 9,W ^ TO BE INSTALLED ON A LEVEL STABLE BASE LIQUID DEPTH IN SEPTIC TANK DEPTH OF OUTLET TEE BELOW FLOW LINE 4 FEET 14 INCHES 5 FEET 19 INCHES 6 FEET 24 INCHES 7 FEET 29 INCHES 8 FEET 34 INCHES ..i-a .. .. a•. e. . •.n .a. t: `.1': ADJUST COVER TO a FINISH GRADE 4'-10" •..: : , RISER AND COVER 9 O O O O O O TO BE WATERTIGHT ~A e 1' 9" MIN.-36` MAX. COVER �.. .' 2' PEASTONE OR _ - ;.. • .. .,.a': ; �.,�' . .: , GEOTEXTILE FABRIC EFFECTIVE DEPTH 24" , ' o o :, '* -0" .' `. •~° • - DOUBLE WASHED STONE 51' 8 _1 . 57' 9.0' LEACHNC3 8Y VEW NOT M 5SCALEAN CON(AM L EAC-HM CHA W DETAL TO PL (HNO SCALE 4" SC� 40 PVC VENT NTH 'ANIMAL SCREEN � I i \ 4" SOLID SCH 40 i o oG PVC VENT PIPE % 1 i I �,P#3 I O S ` o. e 14" SCH 40 PVC DISTRIBUTION (LATERAL, TYP. (SEE PROFILE S H-20 i \\ DBOX \ O ioo O 10, \ \� ool --'-5\ 0 \---- I \ I `9 �\ H2 D- � oX \ \ 0 \ \ I � 1 4" SCH 40 PVC SEWEg I AT 1% TO DBOX \\ I , \ O \ ii 3500 GALLON TWO i COMPARTMENT �20 \ \ SEPTIC TANK I i � \ � 6" CAST IRON EWER �� I AT 2% TO SEPT�C TANKi I -5 0, v l i o I SOIL ABSORPTION SYSTEM PLAN SCALE: 1 INCH = 10 FEET INV. IN=46.00 24 0 0 0 0 0 I EFFECTIVE DEPTH `-t UNSUITABLE SOILS, BELOW THE PEASTONE ELEV (TOP DOUBLE WASHED STONE 5' MIN OF SAS), SHALL BE REMOVED TO THE TOP OF THE "C1 HORIZON" (ELEVATION 45.3 AT TEST HOLE 4) - SEE CONSTRUCTION NOTE #5 HEREON. me 21 " D I A �-- 3" 102"- 500 GALLON PRECAST CHAP (CHAMBER WIDTH=4'-10') NOT TO SCALE I 4" SCH 40 PVC VENT WITH ANIMAL SCREEN SEPTIC CONSTRUCTION NOTES: ENSURE PROPER PIPE CONNECTION BETWEEN ALL CHAMBERS (4" SCH 40 PVC) 7.0 0 ELEV-44.00 NO GROUNDWATER FOUND TO ELEV-37.8t LEACHM CHAMBS (500 QAL LCO SHOREY 500 GALLON H-20 CHAMBER OR EQUAL SEPTIC SYSTEM DESIGN REQUIREMENTS NITROGEN LOADING LIMITATION: 440 GPD/40,000 SF x 193.9 ACRES = 92,909 GPD, MAX. GARBAGE GRINDER (NOT INCLUDED) = N/A DAY CAMP W/WASHROOM AND TOILETS: 114 SEATS x 10 GPD/SEAT = 1,140 GPD TOTAL DESIGN FLOW = 1,140 GPD PERC RATE = <5 MIN. INCH (CLASS 1) LTAR = 0.74 GPD/SF MIN. LEACHING AREA OF S.A.S. REQUIRED' 1,140 GPD / 0.74 GPD/SF = 1,541 SF, MIN. PROPOSED SYSTEM: (2) 571 x 9'W LEACHING CHAMBERS; WITH 3'-0" OF STONE ON ENDS OF CHAMBERS AND 2'-1 " ON SIDES OF CHAMBERS SIDEWALL AREA: (57' + 9') x 2' x (2) = 264 SF BOTTOM AREA: (57' x 9') = 513 SF TOTAL EFFECTIVE LEACHING AREA: 777 SF x 2 CHAMBERS = 1,554 SF SYSTEM DESIGN CAPACITY = 1,554 SF x 0.74 GPD/SF = 1,554 GPD > 1,541 GPD - OK. SEPTIC TANK SIZING: FIRST COMPARTMENT - 1,140 GALLONS PER DAY x 200% = 2,280 GALLONS SECOND COMPARTMENT - 1,140 GALLONS PER DAY x 100% = 1,140 GALLONS TOTAL = 3,420 GALLONS USE 3,500 GALLON, MINIMUM TWO -COMPARTMENT SEPTIC TANK PER TITLE 5 1. ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE WITH TITLE V OF THE STATE SANITARY CODE DATED SEPTEMBER 9, 2016, AS AMENDED THROUGH THE DATE OF THIS PLAN, & ANY LOCAL RULES & REGULATIONS 24" APPLICABLE. 2. ANY CHANGE TO THIS PLAN MUST BE APPROVED IN WRITING BY THE ENGINEER. ELEVATION INFORMATION MUST NOT BE CHANGED WITHOUT WRITTEN PRIOR APPROVAL BY THE ENGINEER. 3. WHEN CONSTRUCTION IS COMPLETED, PRIOR TO BACKFILLING, NOTIFY THE BOARD OF HEALTH AGENT AND ENGINEER FOR INSPECTION. 4. ALL SANITARY DISPOSAL SYSTEM PIPING TO BE 4" SCHEDULE 40 PVC, UNLESS OTHERWISE NOTED HEREIN. 5. IF THE SOILS ARE FOUND TO NOT BE CONSISTENT WITH THE TEST HOLE DATA, EXCAVATE UNSUITABLE MATERIAL TO THE "Cl HORIZON" IF REQUIRED, FOR A HORIZONTAL DISTANCE OF 5' SURROUNDING THE LEACHING FIELD, AND REPLACE WITH CLEAN SAND PER 310 CMR 15.255 TO THE TOP ELEVATION OF THE SAS. 6. INSULATE ALL PIPES AGAINST FREEZING AS REQUIRED WHEN LESS THAN 3' OF COVER. 7. THE SEPTIC SYSTEM DESIGN DOES NOT INCLUDE GARBAGE GRINDER DISPOSALS. 8. CAUTION: THE CONTRACTOR SHALL CONTACT DIG SAFE (AT 1-888-DIG-SAFE) AND UTILITY COMPANIES TO LOCATE ALL EXISTING UTILITIES, AT LEAST 72 HOURS BEFORE THE START OF CONSTRUCTION. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION, BOTH HORIZONTALLY AND VERTICALLY, OF ALL EXISTING UTILITIES BEFORE THE START OF ANY WORK. THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY, MAY NOT BE LIMITED TO THOSE SHOWN HEREON AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR AGREES TO BE FULLY RE SPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO LOCATE THE UTILITIES EXACTLY. IF ELEVATION INFORMATION DIFFERS FROM PLAN INFORMATION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR POSSIBLE REDESIGN. AT UTILITY CROSSINGS, VERIFY IN FIELD THE LOCATION / INVERTS OF ELECTRIC, GAS, TELEPHONE & DATA/COMM AND RELOCATE IF CONFLICTING WITH PROPOSED INVERTS PER THE ENGINEERS DIRECTION. THE CONTRACTOR SHALL PRESERVE ALL UNDERGROUND UTILITIES AS REQUIRED. 9. THE PROPOSED UTILITY CONNECTIONS SHOWN HEREON ARE SCHEMATIC. FINAL LAYOUT SHALL BE AS DETERMINED BY THE APPROPRIATE UTILITY COMPANY. yarmouth Health Department PROVED �, ame Date SOIL LOGS YARMOUTH SOIL EVALUATOR: DATE. MARCH It 2020 BOARD OF HEALTH AGENT: STEPHEN MATSON, P.E. PHIL RENAUD TEST PIT 1 TEST PIT 2 TEST PIT 3 TEST PIT 4 0" G.S.E.=51.3f 0" G.S.E.=50.4t 0" G.S.E.=47.8f 0" G.S.E.=48.8f 0; ORGANIC 0; ORGANIC A; 10 YR 3/2 SANDY LOAM A; 10 YR 3/2 SANDY LOAM 10" ELEV=50.5f 3" ELEV=50.1 f 13" ELEV=46.7f 18" ELEV=47.3t A; 10 YR 3/2 SANDY LOAM A; 10 YR 3/2 SANDY LOAM B; 10 YR 5/6 LOAMY SAND B; 10 YR 5/6 LOAMY SAND 20" ELEV=49.6f 10" ELEV=49.6f 29" ELEV=45.4t 42" ELEV=45.3f B; 10 YR 5/6; LOAMY SAND B; 10 YR 5/6; LOAMY SAND Cl; 10 YR6/8; FINE-MED SAND Cl; 10 YR6/8; FINE-MED SAND 40" ELEV=48.0f 32" ELEV=47.7f 58" ELEV=43.0f 70" ELEV=43.0t Cl; 10 YR 6/8; MEDIUM SAND C1; 10 YR 6/8; MED-FN SAND C2; 10 YR7/6; FINE-MED SAND C2; 10 YR7/6; FINE-MED SAND 70" ELEV=45.5f 84" ELEV=43.4f 120" ELEV=37.8f 120" ELEV=38.8t C2; 10 YR 7/6; MEDIUM SAND C2; 10 YR 7/6; MED-FN SAND 120" ELEV=41.3f 120" ELEV=40.4f NO WATER OBSERVED AT 120' < PERKY RATE: 2R MIN./INCH. 13AXTER F,NGINEF-RINCT& SURVEYING BAXTE R NYE ENGINEERING & SURVEYING Registered Professional Engineers and Land Surveyors 78 North Street - 3rd Floor Hyannis, Massachusetts 02601 Phone - (508) 771-7502 Fax - (508) 771- 7622 www.baxter-nye.com STAMP MATTHEN W, EWV CIM No. 43183 CONSULTANT CONSULTANT PREPARED FOR: Cape Cod & Islands Council Boy Scouts of America 247 Willow Street Yarmouthport, MA 02675 PROJECT TITLE Boy Scouts of America Welcome & Education Center 227 Pine Street Yarmouthport, MA 02675 DEC 15 2022 A DEPT /4� JKL 1912612022 RELOCATE ENTRANCE DRIVEWAY JKL 8/06/2022 RELOCATE TRANSFORMER 0 JKL 6/13/2022 RELOCATE PRIMARY ELECTRIC LAYOUT 01 JKL 1011112021 PER SITE PLAN REVIEW COMMENTS DATE DESCRIPTION SHEET TITLE Septic Profile and Details Plan SHEET NO C5s 1 DATE: SEPTEMBER 17, 2021 20 0 20 40 SCALE IN FEET SCALE:1"=20' DRAWN BY: JKL CHECKED BY: MWE J O B N 0: 2020-004 F I L E: 9n10-nnaIITt4Wn