No preview available
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out Acreage -) Commercial: Residential: Street: 78 6 )) 4fe --- Village: Floor Plan: # Bedrooms: ,.. 2__ Owner: Installer: Address: ec, -� Phone: Phone: Builder: Engineer: Kse i f1-\, --re 1 N 6..Pc-71:c_& Address: Phone: Phone: N/A YES NO 1. Required#of copies received R/ 2.Date of soils exam and percolation test not older than 2 years �/� 3.4-5 ft of naturally occurring pervious material, above water table a ----- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: Q/ 5. Water line 10 ft from septic components Var.: I d� 6. Benchmark indicated and shown-NGVD if near wetlands �/ 7. Septic tank minimum 10 ft from foundation, deck Var.: 9 ,, />' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v �; 9. Leaching minimum 100 ft from wetlands Var.: 7 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setbackrequirements Var.: 1�� 13. Uses adjustment for maximum high groundwater Var.: , ' 5"y' 14. Leaching set 4-5 ft above adj. water or bottom of test hole • c/ 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: e/ 19. Specified tee sizes are proper, gas baffle on outlet tee ,/ 20. Sewage is under 10,000 gpd for parcel - 21.No garbage disposal I 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade t/ 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes L./ 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size t 28. Septic tank/pump chamber to be factory waterproofed l� 29. Vent provided if leaching below 3 feet,under driveway/parking 1� 30. Buoyancy calculations for tank/pump chamber C.---- 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater _/ 34.Title V Application and permit fee,installer signature / „____„--" 35. Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by o:o: c_.3 / -3'a3