Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. a7 7 Lot// V Zone of Contribution: In Out_ Acreage //� [)9O Commercial: Residential:__�_ . 2 Street: �7 H� S � a Village: Floor Plan: l/ #Bedrooms: -3 Owner: Installer: (j f- Address: Phone: Phone: Builder: Engineer: L. . C_ , � c -,--., r I G'._ Address: Phone: ,3 Phone: N/A YES NO 1. Required#of copies received k 2. Date of soils exam and percolation test not older than 2 years /7 3. 4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 47 5.Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 1. 7. Septic tank minimum 10 ft from foundation, deck Var.: 1 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �I 9. Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: \� L. 13. Uses adjustment for maximum high groundwater Var.: . / 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: l' }�st 15. Stem not in top or subsoil(A,B horizons)or 5' removal `.- 16. Proposed contours are suitable l . 17. System meets slope requirements-min. 1/8", '/<"preferred [./ 18. System meets breakout requirements PVC liner: Wall: c/- 19. Specified tee sizes are proper, gas baffle on outlet tee (� 20. Sewage is under 10,000 gpd for parcel C. 21.No garbage disposal 22. System adequately sized for its intended use ,/ 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade .. 1 25. Inspection port on plastic chambers/leach field fi 26. Electrical permit for pump chamber/Separate meter for duplexes ---- I . 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size i ' 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber31. Engineer to inspect and certify soils: wall: commercial: 2./.7, / 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min.2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd C/ 37. Check area lots for groundwater/Label groundwater in Assessor's Map c Plan reviewed by: c o:o: / -016"at 3