HomeMy WebLinkAboutEngineer PlanT.O.F. EL.= 31.6't
EL. = FINISHED GRADE
29.61 f @ FOUNDATION = 30.8't
PROP. SCH. 40
PVC SEWER-1
FINISH GRADE OVER TANK EL.=
30.9't
9" MIN.
36 MAX.
PROP. SCH. 40
PVC SEWER
�20 t 2" DROP MIN.
6" 3" 3" 9�
w. MIN SLOPE 3 DROP MAX. MIN. sioPe �,
13"
141
kk,v"r �ctiOr 27.90'
*2$.5'�` INLET TEE11\28.15' 48" OUTLET TEE
TEES TO BE CENTERED GAS BAFFLE
DIRECTLY UNDER RISERS
0.6' OFFSET TO FND
6" CRUSHED STONE
OVER MECHANICALLY
COMPACTED BASE C C C
PROPOSED 1,500 GALLON CONCRETE SEPTIC TANK
*CONTRACTOR I O VERIFY xlt.l LENGTH 10'-6" WIDTH 5�-8�� DEPTH 5_-8r� (Dimensions per
NO ACME/Shore
ELEVATION PRIOR TO ANY WORK,, L_ i i Y)
NOTIFY ENGINEER IF DIFFERENT. NOT TO SCALE
SWING -TIES
PROVIDE EXTENSION RISER
WITH COVER OVER INLET &
OUTLET TO WITHIN 6" OF F.G.
21" MIN. ACCESS
COVER (3 TYP.)--\
DESCRIPTION
HC-1
HC-2
HC-3
TANK COVER IN (1)
41.2'
16.4'
-
TANK COVER OUT (2)
48.9'
13.5'
-
CORNER OF STONE (3)
60.7'
18.6'
41.7'
CORNER OF STONE (4)
-
18.2'
15.9'
CORNER OF STONE (5)
-
25.4'
24.2'
CORNER OF STONE (6)
-
25.8'
t:45.6'
a
PROPOSED THREE (3)
500-GALLON LEACHING
CHAMBERS
PROPOSED
DISTRIBUTION BOX -�
MAP 59
LOT 139 Zo„�
a
FINISH GRADE OVER D-BOX = 31.0'±
REMOVABLE WATER -TIGHT COVER OVER
RISER TO WITHIN 6" OF FINISHED GRADE
(-5" DIA. OUTLET(S)
t
9" MIN.
36" MAX.
L=11 t PROVIDE WATERTIGHT
4" PVC IN FROM JOINTS (TYP.)
SEPTIC TANK 4" PVC OUT TO
0-
:;:nHING FACILITY
27.77' 27.60CRUSHED STONE
ER MECHANICALLY
COMPACTED BASE
5 OUTLET DISTRIBUTION BOX
TO BE INSTALLED ON A LEVEL STABLE
BASE. FIRST TWO FEET OF OUTLET
PIPES TO BE LAID LEVEL,
CROSS SECTION VIEW
NOT TO SCALE
MAP 59
LOT 147
- 4" SCHEDULE 40 PVC
MIN SLOPE 1%
II
9" MIN.
27.40' 36" MAX.
FINISH GRADE OVER CHAMBERS = 30.8' - 31.1'
SLOPE @ 2% MIN. OVER SYSTEM
BOTTOM FLOOR OF HOUSE EL = 29.70'
z
TOP OF SAS = 28.23'
BREAKOUT EL = 27.90'
L. 1.
_ R%,-1
0 0 =
0�
"
T
0
0
0
0
0
2.0' 8.5' (TYP)
29 5'
25.40'
,�- PROPOSED 1,500
GALLON SEPTIC TANK
- EXISTING CESSPOOL TO BE
PUMPED, FILLED WITH
CLEAN SANDL & ABANDONED
(TYP. OF 2 )
1
MAP 59
LOT 141
GR(
500 GALLON CHAMBI
LICAL CHAMBER PRO?
MAP 59
LOT 146
NOTES:
1.) MAGNETIC MARKING TAPE SHALL BE PLACED ALONG THE TOP EDGE OF
EACH SEPTIC SYSTEM COMPONENT.
2.) CONTRACTOR SHALL VERIFY SOIL CONDITIONS IN THE LOCATION OF THE
PROPOSED LEACHING FACILITY TO ENSURE CONSISTENCY WITH TEST PIT
DATA SHOWN ON THIS PLAN. REPORT TO ENGINEER AND LOCAL BOARD OF
HEALTH IF SOILS ARE NOT CONSISTENT WITH TEST PIT DATA.
3.) PROPERTY IS LOCATED WITHIN A DEP APPROVED ZONE I1. R
4.) SWING TIES SHOWN ON THIS PLAN ARE PROVIDED ONLY AS A COURTESY
SITE PLAN FOR THE INSTALLER. INSTALLER SHALL VERIFY SWING TIE MEASUREMENTS
IN THE FIELD PRIOR TO INSTALLING THE SYSTEM. CONTRACTOR SHALL
SCALE: 1" = 10' NOTIFY ENGINEER IF MEASUREMENTS APPEAR TO BE INCORRECT.
0
r
coCD
o
GENERAL NOTE"'
1•
UNLESS OTHERWISE NOTED, ALL SYSTEM COMPONENTS AND CONSTRUCTION
3/4" TO 1-1/2" DOUBLE WASHED
METHODS SHALL BE IN ACCORDANCE WITH TITLE 5 OF THE STATE ENVIRONMENTAL
STONE TO CROWN OF PIPE
CODE AND ANY APPLICABLE LOCAL RULES.
2" OF 1/8" TO 1/2" DOUBLE WASHED
2.
ANY CHANGES TO THIS PLAN MUST BE APPROVED BY THE BOARD OF HEALTH AND THE
STONE OR GEOTEXTILE FILTER FABRIC
DESIGN ENGINEER,
PLACE RISER ON ALL
3.
4" SCHEDULE 40 PVC PIPE WITH WATER TIGHT JOINTS SHALL BE USED IN DISPOSAL
CHAMBERS w/ PIPED
SYSTEM UNLESS OTHERWISE NOTED.
INLETS TO WITHIN 6"
OF FINISHED GRADE -f
4.
TO PREVENT BREAKOUT, THE PROPOSED FINISHED GRADE SHALL NOT BE LESS THAN
ELEVATION = 27.90' FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE SAS. UNLESS A
40 MIL GEOMEMBRANE LINER IS PLACE AT LEAST FIVE FEET FROM S.A.S. AND THE TOP OF
Cb.
THE LINER IS NOT LESS THAN THE BREAKOUT ELEVATION.
0
5.
SLOPE ALL SOLID PIPE AT 1.0 /o MINIMUM.
o
6.
THIS SYSTEM IS NOT DESIGNED FOR A GARBAGE DISPOSAL.
o
00
Q o 0
�'
7.
LOCAL BOARD OF HEALTH AND DESIGN ENGINEER TO BE NOTIFIED PRIOR TO BACK
FILLING WHEN SYSTEM IS NEARLY COMPLETE AND READY FOR INSPECTION. SYSTEM IS
oo
NOT TO BE BACK FILLED WITHOUT FIRST OBTAINING APPROVAL FROM BOARD OF HEALTH
AND DESIGN ENGINEER.
2.5'
8.
ELEVATIONS BASED ON APPROXIMATE M.S.L. DATUM. SEE BENCHMARK LOCATION AND
25
4.83'
ELEVATION SHOWN ON PLAN.
(TYP.)
9.
CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION
9.83'
THROUGH DIG -SAFE AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE AT
\-5'
1-888-DIG-SAFE AND ANY OTHER APPLICABLE AGENCIES. REPORT ANY DISCREPANCIES
MIN. (HAMB END VIEW
TO THE DESIGN ENGINEER.
r
LOCUS PLAN r
SCALE: 1" = 1000,
DESIGN DATA
NUMBER OF BEDROOMS (EXISTING) 3
NUMBER OF BEDROOMS (DESIGN) 3
DESIGN FLOW 110 GAUDAY/BEDROOM
TOTAL DESIGN FLOW 330 GAUDAY
DESIGN FLOW x 200 = 660 GAL/DAY
USE PROPOSED 1,500 GALLON SEPTIC TANK
INSTALL 3 - 500 GAL. CHAMBERS w/ AGGREGATE
SIDEWALL CAPACITY
(LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.) = GAUDAY
(29.5' + 9.83') (2) (2') (0.74 GPD/ S.F.) = 116.4 GAUDAY
BOTTOM CAPACITY
(LENGTH x WIDTH) (0.74 GPD/S.F.) = GAUDAY
(29.5' x 9.83') (0.74 GPD/S.F.) = 214.6 GAUDAY
TOTALS:
TOTAL NUMBER OF CHAMBERS 3
TOTAL LEACHING AREA 447.3 SQYT.
TOTAL LEACHING CAPACITY 331.0 GAL./DAY
RESERVED FOR BOARD OF HEALTH USE
10. ALL JOINTS WHERE PIPE ENTERS AND EXITS CONC, STRUCTURES SHALL BE MADE WATERTIGHT.
11. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING
REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM
APPROPRIATE AUTHORITY.
12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS LOCATED
UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, DRIVES, OR
TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING.
13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES.
14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE
MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY.
REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY,
FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3).
15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN
SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK.
16, PROPOSED PROJECT IS LOCATED WITHIN:
ASSESSOR'S MAP 59 LOT 140
OWNER OF RECORD: ROBERT E. & PAULA P. PHILLIPS
ADDRESS: 102A WILFIN ROAD
SOUTH YARMOUTH, MA 02664
FEMA FLOOD ZONE X
COMMUNITY PANEL # 25001CO587J
17. DEED REFERENCE: BOOK 4047, PAGE 73
18, PLAN REFERENCES: 1.) PLAN BOOK 127, PAGE 67 2.) PLAN BOOK 118, PAGE 141
19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION.
20. PROPERTY LINE INFORMATION IS ONLY APPROXIMATE. THIS PLAN IS TO BE USED ONLY
FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY
FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE.
21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL
REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT.
130" 20.07'
No Mottling, Standing or Weeping Observed
JAN 17 2023
HEAL H DEPT.
Yarmouth Health Department
APPROVED
ame Date
50x0
EXISTING SPOT GRADE
50 __. ___ __
EXISTING CONTOUR
50 -
PROPOSED CONTOUR
50
PROPOSED SPOT GRADE
GAS -
EXISTING GAS LINE
O/Hfr vw --- -
EXISTING OVER HEAD WIRES
W W -
EXISTING WATER LINE
TEST PIT LOCATION
Opp
PROPOSED 1,500 GALLON SEPTIC TANK
PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE
0
PROPOSED DISTRIBUTION BOX
�p
PROPOSED 500 GALLON LEACHING CHAMBER
REV. I DATE
PytN, OF M4STIC,
JOHN L.
o CHURCFLL Ju C. 11LNO As
v'
K�k OF M4s��
JOHN L.
a CHURCH!' :1R.
CIVI v,
NO
BY I APP'D. I UtZjUK r i 1VN
PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
ROBERT B. OUR CO., INC.
LOCATED AT
32 ICE HOUSE ROAD
YARMOUTH, MA 02664
SCALE: 1 INCH = 10 FT. DATE: JANUARY 10, 2023
0 5 10 20 40 FEET
PREPARED BY
JC ENGINEERING, INC.
2854 CRANBERRY HIGHWAY
EAST WAREHAM, MA 02538
508.273.0377
Drawn By: MKV Designed By: MKV Checked By: MCP JOB No. 6737