HomeMy WebLinkAbout83 Old Hyannis Rd 5iE''INERAL STRUCTURAL NOTESI
1. ALL' WORK SHALL CONFORM TO THE REQUIREMENTS OF 2015 INTERNATIONAL
RESIDENTIAL CODE AND CURRENT MA 780 CMR NINTH EDITION STATE BUILDING CODE
SUPPLEMENTS
2. THE CONTRACTOR SHALL COORDINATE ALL DIMENSIONS AND ELEVATIONS WITH THE
DESIGNER DRAWINGS PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT
TO THE IMMEDIATE ATTENTION OF THE DESIGN TEAM.
3. THE CONTRACTOR SHALL COORDINATE THE SIZE AND LOCATION OF ALL SLEEVES,
OPENINGS AND ANCHORAGES (INCLUDING ANCHOR BOLTS) AS REQUIRED BY ALL TRADES.
OPENINGS NOT SPECIFICALLY SHOWN SHALL BE APPROVED BY THE DESIGNER.
4 FOUNDATION WALLS SHALL BE TEMPORARILY BRACED UNTIL FRAMED SLABS AND SLABS
ON GRADE BRACING THESE WALLS AGAINST EARTH PRESSURE, WIND AND OTHER LATERAL
FORCES ARE IN PLACE.
I
5. ALL NEW WORK SHOULD BE REVIEWED FOR COMPLIANCE WITH PLANS PREPARED BY THE
DESIGNER. THE DESIGNER CANNOT BE HELD RESPONSIBLE FOR ANY FRAMING I ISSUES THAT
MAY ARISE IF NOT CONTACTED BY G.C. FOR SITE OBSERVATIONS DURING CONSTRUCTION.
WOOD FRAMING CONNECTION
SCHEDULE U. 0. L%4.
WOOD FRAMING MEMBER HANGER SERIES
2x JOIST U2 "DEPTH
(2) 2x HEADER / BEAM U2 "DEPTH" -2
i
(3) 2x HEADER /BEAM U2 .DEPTH; 3
LSSU2x"DEPTH"
2x RAFTER TO RIDGE BEAM / VALLEY
OR LS ANGLES
I
i
WOOD POST MEMBER BASF/CAP
(3) 2X4 POSTS A AC4CAPSE
(3) 2X6 POSTS ABU66 BASE
AC6` CAP
NOTES: I. HANGER DEPTH SHA WIDTH O
F FRAMING MEMBER.
LL MATCH DEPTH AND
2. HANGERS SHALL BE INSTALLED CONCURRENTLY WITH FRAMING AND
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
3. THE CONTRACTOR SHALL COORDINATE ALL SLOPES, ANGLES AND
OFFSETS FOR ALL FLOOR AND ROOF CONNECTORS.
4. HANGER DESIGNATIONS ARE BASED UPON SIMPSON STRONG (TIE LOAD
TABLES. SUBSTITUTIONS SHALL NOT BE PERMITTED UNLESS
AUTHORIZED IN WRITING BY THE DESIGNER.
5. POST CONNECTORS ARE REQUIRED FOR ALL POST LOCATED IN EXTERIOR
SPACE OR SUPPORTING ROOF MEMBERS
ATE TO
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318 AND 301 REQUIREMENTS. THIS SHALL INCLUDE PROPORTIONINGOF
CONCRETE MIX, CONCRETE TESTING, PLACEMENT OF CONCRETE, AND CURING PROCEDURES.
2. ALL COLD WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 306. THE G.C. SHALL BE
RESPONSIBLE FOR SUBMITTING A COLD WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO CONSTRUCTION.
3. ALL HOT WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 305. THE G.C. SHALL BE RESPONSIBLE
FOR SUBMITTING A HOT WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO CONSTRUCTION.
4. ALL CONCRETE CURING SHALL CONFORM TO THE REQUIREMENTS SET FORTH IN ACI 308.
5. CONCRETE SHALL HAVE THE FOLLOWING 28 DAY COMPRESSIVE STRENGTH
a. FOOTINGS, FOUNDATIONS ................. : .................. .............
'II 3,500 PSI
o I _
6. 1 PROVIDE TOTAL AIR ENTRAINMENT OF 6% (f) FOR ALL CONCRETE EXPOSED TO WEATHER.
7. j MAX. WATER/CEMENT RATIO FOR 4000 PSI CONCRETE = 0.45. PROVIDE A HIGH -RANGE WATER REDUCING ADMIXTURE IF
REQUIRED TO INCREASE WORKABILITY OF THE CONCRETE.
� I,I
I
1
s '
TOP OR BOTTOM PL
2-16d
OF
NUMBER OF
NAIL SPACING
JOINT. DESCRIPTION
2-10d
COMMON NAILS
BOX NAILS
3-8d
BOTTOM PLATE TO FLOOR JOIST,
i;z
2-16d
ROOF FRAMING
P ER F OOTI
5d COILERS
RAFTER TO TOP PLATE
BANDJOIST, ENDJOIST, OR
3-16d
3-16d
1.9x 10'psi
PER RAFTER
(TOE -NAILED)
10d
285 psi
(SEE TABLE
3.11)*
1
FLOOR FRAMING
CEILING JOIST TO TOP
I
3-8d
3-8d
4-8d
PER JOIST
7/16"
PLATE (TOE -NAILED)
-
-
GIRDER (TOE NAILED)
6" FIELD
DOUGLAS FIR LARCH
1.4 x lObpsi
25/32"
CEILING JOIST TO
4-lOd
4-10d
2-8d
EACH LAP
PARALLEL RAFTER (TOE -NAILED
EACH END
5d COOLERS
(TOE -NAILED)
HARDBOARD
CEILING JOIST LAPS OVER
8d
4-10d
4-10d
8d
EACH LAP
li
PARTITIONS (TOE -NAILED)
I "x6" OR 1 "x8" 2-8d 2-10d PER
EACH END
FLOOR SHEATHING
' (TOE -NAILED)
.COLLAR TIE TO RAFTER
4-10d
4-10d
BLOCKING TO SILL OR TOP
PER TIE
3-16d
(FACE -NAILED)
GREATER THAN`1" :
EACH BLACK
16d
PLATE (TOE -NAILED)
6"EDGE/
BLOCKING TO RAFTER
1500 psi
2-$d
2-10d
6" FIELD
EACH END,
-
( TOE NAILED
3- 16d
-
4 16d
EACH JOIST
AC
2-8d
RIM BOARD TO RAFTER
2-16d
3-16d
3-8d
EACHEND
(END -NAILED)
JOIST ON LEDGER TO BEAM
3-8d
3-10d
o.c. AT THE PANEL EDGE. IF WALL SHEATHING IS NAILED 3" o.c. AT THE
PER JOIST
REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR
WALL FRAMING
TO MAINTAIN THE LOAD PATH
2. WHEN WALL SHEATHING IS CONTINUOUS OVER CONNECTED
TOP PLATE TO TOP PLATE
NAIL PER FOOT
1
2-16d
i
2-16d
PER FOOT
(FACE -NAILED)
PER JOIST
(END -NAILED)
TOP PLATES AT INTERSECTIONS
4-16d
5-16d
JOINTS -
(FACE -NAILED)
3-16d
PER FOOT
EACH SIDE
STUD TO STUD
2-16d
2-16d
24 o.c.
(FACE -NAILED)
HEADER TO HEADER
16d
16d
16" o.c.
(FACE -NAILED)
ALONG EDGES
ATE TO
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318 AND 301 REQUIREMENTS. THIS SHALL INCLUDE PROPORTIONINGOF
CONCRETE MIX, CONCRETE TESTING, PLACEMENT OF CONCRETE, AND CURING PROCEDURES.
2. ALL COLD WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 306. THE G.C. SHALL BE
RESPONSIBLE FOR SUBMITTING A COLD WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO CONSTRUCTION.
3. ALL HOT WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 305. THE G.C. SHALL BE RESPONSIBLE
FOR SUBMITTING A HOT WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO CONSTRUCTION.
4. ALL CONCRETE CURING SHALL CONFORM TO THE REQUIREMENTS SET FORTH IN ACI 308.
5. CONCRETE SHALL HAVE THE FOLLOWING 28 DAY COMPRESSIVE STRENGTH
a. FOOTINGS, FOUNDATIONS ................. : .................. .............
'II 3,500 PSI
o I _
6. 1 PROVIDE TOTAL AIR ENTRAINMENT OF 6% (f) FOR ALL CONCRETE EXPOSED TO WEATHER.
7. j MAX. WATER/CEMENT RATIO FOR 4000 PSI CONCRETE = 0.45. PROVIDE A HIGH -RANGE WATER REDUCING ADMIXTURE IF
REQUIRED TO INCREASE WORKABILITY OF THE CONCRETE.
� I,I
I
1
s '
TOP OR BOTTOM PL
2-16d
2-16d
PER STUD',
1 "x6" OR 1 "x8"
STUD (END -NAILED)
2-10d
SUPPORT
i' VxI0" OR WIDER
3-8d
BOTTOM PLATE TO FLOOR JOIST,
i;z
2-16d
1,2�
2- 16d
P ER F OOTI
5d COILERS
Sd COILERS
BANDJOIST, ENDJOIST, OR
190 psi
WALL SHEATHING
1.9x 10'psi
STRUCTURAL PANELS
BLOCKING(FACE-NAILED)
10d
285 psi
(SEE TABLE
3.11)*
1
FLOOR FRAMING
625 psi
I
' 1400 psi
JOIST TO SILL, TOP PLATE OR
4-8d
4-I0d
7/16"
PER JOIST ;
-
-
GIRDER (TOE NAILED)
6" FIELD
DOUGLAS FIR LARCH
1.4 x lObpsi
25/32"
625 psi
BRIDGING TO JOIST
900 psi
2-8d
2-10d '
GYPSUM WALLBOARD
EACH END
5d COOLERS
(TOE -NAILED)
HARDBOARD
8d
8d
(SEE TABLE
3.11)*
PARTICLEBOARD PANELS
8d
BLOCKING TO JOIST
��
2-8d
2-10d
I "x6" OR 1 "x8" 2-8d 2-10d PER
EACH END
FLOOR SHEATHING
' (TOE -NAILED)
HEADER
i
1" OR LESS
BLOCKING TO SILL OR TOP
10d
3-16d
4-16d
GREATER THAN`1" :
EACH BLACK
16d
PLATE (TOE -NAILED)
6"EDGE/
SCALE: 3/4" = 1'-0" 51.0
1500 psi
175 psi
I
6" FIELD
LEDGER STRIP TO BEAM
'
3- 16d
-
4 16d
EACH JOIST
AC
2-8d
(FACE -NAILED)
PER
1"x10" OR WIDER
3-8d
3-10d
JOIST ON LEDGER TO BEAM
3-8d
3-10d
o.c. AT THE PANEL EDGE. IF WALL SHEATHING IS NAILED 3" o.c. AT THE
PER JOIST
REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR
(TOE -NAILED)
TO MAINTAIN THE LOAD PATH
2. WHEN WALL SHEATHING IS CONTINUOUS OVER CONNECTED
MEMBERS, THE TABULATED NUMBER OF NAILS SHALL BE PERMITTED
NAIL PER FOOT
BAND JOIST TO JOIST
3-16d
4-16d
PER JOIST
(END -NAILED)
BAND JOIST TO SILL OR TOP
2-16d1
3-16d
PER FOOT
PLATE (TOE -NAILED)
ROOF SHEATHING
FOUNDATION NOTES
1. ALL FOUNDATIONS, FOOTINGS AND SLABS (SHALL BEAR ON UNDISTURBED, NON-ORGANIC MATERIAL, COMPACTED
STRUCTURAL FILL OR CRUSHED STONE' NI ITH A MINIMUME
PRESUMPTIVE BE CAPACITY OF 2.0 TONS PER
SQUARE FOOT.
2! BOTTOM OF FOOTING ELEVATIONS ARE SHbm,IN ON THE PLANTS. IF ANY ORGANIC MATERIALS, SILTS, CLAYS OR FILL
MATERIAL ARE ENCOUNTERED DURING EXCAVATION AT THE SPECIFIED BEARING ELEVATION OR SLAB ON GRADE
LOCATIONS, THE GENERAL CONTRACTOR': SHALL HALT ALL EXCAVATION AND CONTACT THE DESIGNER
FOR SITE OBSERVATION AND DETE JNIL`�,T.'ATION OF REMEDIAL PROCEDURES.'THE GENERAL
CONTRACTOR SHALL THEN SUBMIT A SCHEDULE OF COSTS FOR POSSIBLE REMOVAL OF UNSUITABLE MATERIALS
AND REPLACEMENT WITH CONTROLLED STLJCTL.RAL FILL PRIOR TO PROCEEDING WITH CONTRUCTION.
S
3. THE GENERAL CONTRACTOR SHALL CO 'FORM TO THE REQUIREMENTS OF OSHA REGARDING OPEN HOLES,
SLOPE STABILITY AND EXCAVATION PROCEDURES.
4 ALL FOUNDATIONS FOOTINGS SMALL BE 4'-0" OR MORE BELOW FINISHED GRADE.
5! BACKFILLING OF FOUNDATIONS SHALL NOT' EXCEED MORE THAN T-0" UNBALANCED FILL CONDITIONS WITHOUT
TEMPORARY SHORING OF FOUNDATION ((FALLS, L-N]LESS FLOOR SYSTEM 14AS BEEN FRAMED AND DECKED.
6 WHEREVER BEDROCK IS ENCOUNTERED, THE ROCK SHALL BE REMOVED TO T-0" BELOW BOTTOM OF FOOTINGS
OR P-0" BELOW BOTTOM OF SLAB AND RESTORED IN 8" LIFTS OF COMPACTED CRUSHED STONE.
7 A RIGOROUS GEOTECHNICAL EXPLORATION PROGRAM HAS NOT BEEN UNDERTAKEN FOR THIS SITE. IT IS THE
RESPONSIBILITY OF THE G.C. TO L'tiDEP.TAXE ANN' ADDITIONAL TEST PITS, BORINGS OR INVESTIGATIONS AS
NECESSARY TO ASSURE THE MINI''�'IU"�'I BEARING CAPACITY'.
8 CONTROLLED STRUCTURAL FILL / SLAB O`er GRADE BACKFILLING SHALL CONFORM TO THE FOLLOWING GRADATION.
US SIEVE °% PASSING BY AVEIGHT
4'1 100
1„ 60-100
#4 25.55
#20 1 C 55
#40
#200 less than
5%
an ' 55
9� CRUSHED STONE SHALL BE CLEAN CRUSHED STONE CONFORMING TO ASTI l C33,3/4" NOMINAL SIZE.
STRUCTURAL PANELS 8d 10d 3s aj>TABLE F STRUCTURAL LUMBER /ROUGH CARPENTRY
DIAGONAL BOARD SHEATHING
TO 16d
MODULUS OF I
FLL-X. ST 1?.E:SS F �
PER
1 "x6" OR 1 "x8"
2-8d
2-10d
SUPPORT
i' VxI0" OR WIDER
3-8d
3-10d
F,
CEILING SHEATHING
WALLBOARD
i GYPSUM W
5d COILERS
Sd COILERS
10 EDGE/
10 FIELD '
190 psi
WALL SHEATHING
1.9x 10'psi
STRUCTURAL PANELS
8d .
10d
285 psi
(SEE TABLE
3.11)*
1
FIBERBOARD PANELS
625 psi
' 1400 psi
3" EDGE/
IPI
7/16"
6d
8d
-
-
6" FIELD
DOUGLAS FIR LARCH
1.4 x lObpsi
25/32"
625 psi
900 psi
180 psi
NORTH,. (STUDS)
GYPSUM WALLBOARD
5d COOLERS
5d COOLERS
7 7 " EDGE/ FIELD
HARDBOARD
8d
8d
(SEE TABLE
3.11)*
PARTICLEBOARD PANELS
8d
8d
PER MANUFAC
TURER
DIAGONAL BOARD SHEATHING
I "x6" OR 1 "x8" 2-8d 2-10d PER
1"x10" OR WIDER 3-8d 3-10d SUPPORT
FLOOR SHEATHING
STRUCTURAL PANELS
HEADER
6" EDGE/
1" OR LESS
8d
10d
12" FIELD
GREATER THAN`1" :
10d
16d
11.5:1 psi
6"EDGE/
SCALE: 3/4" = 1'-0" 51.0
1500 psi
175 psi
(PRESSURE TREATED
6" FIELD
DIAGONAL BOARD SHEATHING
'
1 "x6" OR 1 "x8"
2-8d
2-I0d
PER
1"x10" OR WIDER
3-8d
3-10d
SUPPORT
NOTES:
1 NAILING REQUIREMENTS ARE BASED ON WALL SHEATHING NAILED 6"
o.c. AT THE PANEL EDGE. IF WALL SHEATHING IS NAILED 3" o.c. AT THE
PANEL EDGE TO OBTAIN HIGHER SHEAR CAPACITIES, NAILING
REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR
ALTERNATE CONNECTORS, SUCH AS SHEAR PLATES, SHALL BE USED
TO MAINTAIN THE LOAD PATH
2. WHEN WALL SHEATHING IS CONTINUOUS OVER CONNECTED
MEMBERS, THE TABULATED NUMBER OF NAILS SHALL BE PERMITTED
NAIL PER FOOT
1. ALL WORK SHALL BE IN CONFORMANCE 1�`ITIl THE A14IERICAN FOREST AND PAPER ASSOCIATION STANDARDS AND
SPECIFICATIONS.
2. ALL DIMENSIONAL LUMBER SHALL BE DOUGLAS FIR -LARCH NORTH NO.2 OR SETTER (19%% MOISTURE CONTENT OR
LESS.) ALL LUMBER EXPOSED TO WEATHER. SHALL BE SOUTHERN YELLOW PINE NO. 2 OR BETTER WITH ACQ PRESSURE
TREATMENT PRESERVATIVE AND A MOISTURE CONTE. rT OF 19%%% OR LOWER.
3. ALL EXTERIOR BEARING WALLS SHALL BE 2x6 AT 16" ON -CENTER DOUGLAS FIR• -LARCH NORTH NO.2 OR BETTER,
UNLESS NOTED OTHERWISE.
4. PROVIDE METAL HANGERS AT ALL FLUSH FRA<:%IED CON NvFECTIONS.
5. ALL FASTENERS SHALL BE IN CONFORMANCE'N"TTH THE FASTENING SCHEDULE IN THE CURRENT INTERNATIONAL
RESIDENTIAL CODE, UNLESS NOTED OTHERWISE. FASTE'. TERS EXPOSED TO THE'kNT-ATHER SHALL BE HOT -DIP
GALVANIZED OR STAINLESS STEEL.
6 i PLYWOOD - APA RATED SHEATHING WITH EXTERIOR GLUE'
a. ALL WALL SHEATHING SHALL BE 1/2" GRADE C -D EXPOSURE 1 PLYWOOD, 32/16 SPAN RATING.
b. ALL ROOF DECK SHALL BE 5/8" GRADE C -D EXPOSURE 1 PLYWOOD, 40/20 SPAN RATING, SUPPORTED BY METAL
CLIPS.
C. ALL FLOOR DECK SHALL BE 3/4" GRADE C -D 'EXTOSURE 1, TONGUE AND GROOVE PLYWOOD, 48/24 SPAN RATING.
n
?�+ �.I LES SHALL NOT BE
INSTALLED WITH ANGULAR RTVG NAILS (STAPLES 7. ALL FLOOR AND ROOF DECKING SHALL BE i"s.,
PERMITTED) WITH INSTALLATION PROCEDT_7`R.ES CONFOP-MING TO THE GOVERNi[NG AGENCY STAMPED ON THE SHEETS.
8. ALL ROOF AREAS THAT ARE OVER -FRAMED SHALL CONTAIN` ROOF' DECKING ON THE UNDER -FRAMED MATERIAL,
UNLESS NOTED OTHERWISE.
9. WHERE INDICATED, ALL LUMBER NOTED AS "LN, L" SHALL BE IMICT OLAM LAMINATED VENEER LUMBER, AS
MANUFACTURED BY WEYERHAEUSER.
I
10. WHERE INDICATED, ALL MEMBERS NOTED AS "'TE" K ALL BE TRUSS JOIST ENGINEERED WOOD I JOISTS, AS
MANUFACTURED BY WEYERHAEUSER. FLOOR iBR',IDCING AN`D,'OR. BLOCKING SHALL BE INSTALLED PER JOIST
MANUFACTURER'S RECOMMENDATIONS.
1 . ALL PLYWOOD AND STRUCTURAL USE PANELS' SILALI- CON'FORM TO THE REQUIREMENTS OF THE APA - THE
12ENGINEERED WOOD ASSOCIATION.
. ALL WALL STUDS CUT FOR OTHER TRADES OVER 1/4 OF' THE STUD DEPTH SHALL BE DOUBLED.
13. WHERE STUD WALLS ARE GREATER THAN 8`4)"111 PROWDE A ROW OF 2X SOLID HORIZONTAL BLOCKING.
14. ALL OPENINGS SHALL BE FRAMED BY DOUBLE ME'VMERS UN'LE'SS NOTED OTHERWISE.
15. PROVIDE 1"x4" CROSS -BRIDGING OR SOLID li. BLOCKI"NG FOR ALL SOLID SAWN WOOD JOISTS AT 8'-0" ON -CENTER
MAXIMUM SPACING AND 2x SOLID BLOCKI'N6 BETNEEN JOISTS AT ALL SUPPORTS AND PARTITIONS.
16. MINIMUM LUMBER ALLOWABLE DESIGN STRESSES SHALL BE A'S FOLLOWS:
i
FLOOR DIAPHRAGM NOTES AND DETAILS
TAIL FLOOR SHEATHING
'O FLOOR JOIST W/ FLOOR NAIL FLOOR SHEATHING TO
Dd @ 6" O.C. ALONG SHEATHING BLOCKING W/ lOd @ 6" O.C.
,DGES ALONG EDGES
FLOOR JOIST FLOOR SHEATHING
RIM JOIST
RIM JOIST
NAIL WALL SHEATHING
TO RIM JOIST W/ (3)
I Od NAILS @ 6" O.C. NAIL WALL SHEATHING TO RIM
JOIST W/ (3)-10d @ 6" O.C.
DBL. TOP: PLATE _
LOOR JOISTS 2x BLOCKING
WALL SHEATHING WALL SHEATHING
ALONG PANEL
WALL STUDS EDGES IN 1ST WALL STUDS
2 BAYS ONLY
TYPICAL .FLOOR DIAPHRAGM DETAIL TYPICAL FLOOR DIAPHRAGM D ETAIL
.JOISTS PERPENDICULAR TO WALL A JOISTS PARALLEL TO WALL B
SCALE: 3/4 - 1-0" SCALE: 3/4" =1'-0" "'I'S LO
- FLOOR DIAPHRAGM NOTES
FLOOR DECK SHALL BE 3/4 GRADE C -D EXPOSURE 1 TONGUE AND GROOVE PLYWOOD,
48/24 SPAN RATING. NAIL FLOOR DECK AT THE NG SPACING:
lOd @ 6" oc ALONG PANEL EDGES. '
I
FOLLOWIWL
MEMBER
MODULUS OF I
FLL-X. ST 1?.E:SS F �
COMP. PERP.
COMP. PARALLEL
HORIZ.
ELASTICITY, E
TO GRAIN Fel
TO GRAIN F� i `SHEAR
F,
PSL COLUMNS
1.8 x l Ob psi
2.„ 1^0 psi
425 psi
2500 psi
190 psi
LVL
1.9x 10'psi
2�p0:1 psi
750 psi
2510 psi
285 psi
DOUGLAS FIR LARCH
1.6 x 106 psi
°� �J psi
625 psi
' 1400 psi
180 psi
NORTH, NO.2 '
9-11 psi,(RI`T'. UST')
DOUGLAS FIR LARCH
1.4 x lObpsi
6�0 psi
625 psi
900 psi
180 psi
NORTH,. (STUDS)
S -Y -P, NO.2
1.4 x 106 psi
1.. iia psi
480 psi
I
1600 psi
175 psi.
(PRESSURE TREATED
1. 20 psi (REP-, tiE'ET
Od @ 12" oc FIELD NAILING
HEADER
2X'S)
USE)
HDR. SCHEDULE) HDR. SCHEDULE)
S -Y -P, N0.2
1.4 x 106 psi
11.5:1 psi
480 psi.
SCALE: 3/4" = 1'-0" 51.0
1500 psi
175 psi
(PRESSURE TREATED
TYPICAL HIGH WIND CONNE CTI ON DETAILS
'
POSTS)
I
BE REDUCED TO 1 -
WOOD' POST SCI-IEDLTLE
GALVANIZED TSTENER� NOTE
P# POST TYPE
P2 WOLMANIZED PSL 5-1/4" x 5 1/4" POST
P2 16x6 P.T. WOOD POST POST
P3
P4
P6
P7
P8
ZMAX CONNECTORS AND G90 GALVANIZED:FASTENERS ERS SHALL BE USED FOR ALL SIMPSON
(.
CONNECTORS IN CONTACT WITH PRESSURF TR.EATI:D WOOD (T'iTICAL). NAILS EXPOSED TO
INCLEMENT CONDITIONS AND USED TO ASS 5.NIIISLE I'R:ESSURE TREATED MATERIALS SHALL NOT BE
INCOMPATIBLE WITH THE METAL IN TIDE H-!%`� C�ERS(I.E. COVNION WIRE NAILS AND/OR ROOFING
NAILS.) USE OF THESE FASTENERS IN TP E A i T^ D IVODD� MATERIALS AND SUBJECT TO "BIMETALLIC
GALVANIC CORROSION" ACCELERATES THE �CORRO KION PROCESS IN SAID,FASTENTERS. THE DESIGNER
INDEMNIFIES HIMSELF FROM ALL DAMAGES . ' .SOC14-" TED'S' ITH THE USE OF INCOMPATIBLE
FASTENERS AND RECOMMENDS COORDINATING ATFROPRIATE FASTENERS WITH METAL CONNECTOR
SUPPLIER.
Od @ 12" oc FIELD NAILING
HEADER
'
JACK STUD SEE KING STUD SEE
HDR. SCHEDULE) HDR. SCHEDULE)
TYPICAL HEADER BEARING DETAIL C
SCALE: 3/4" = 1'-0" 51.0
TYPICAL HIGH WIND CONNE CTI ON DETAILS