Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Pfiy Lot 3 9 Zone of Contribution: In_ Out Acreage _41__ ��w Commercial: Residential: ' Street: // % k ; j -c Village: Floor Plan: # Bedrooms: 3 Owner: Installer: Address: -SC i ivrAv .K/7e,T -'/S C S Phone: Phone: Builder: Engineer: 1>ku r-. C f� F - Address: Phone: Phone: N/A YES NO 1. Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material,above water table si/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: (V 5. Water line 10 ft from septic components Var.: 1 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: `/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking`,ve11/25 ft irrigation well Var.: L.--7 11.Tank/leaching minimum 10 ft from property line Var.: 1 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 1 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` I v 15. System not in top or subsoil (A,B horizons)or 5' removal I 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred / _ 18. System meets breakout requirements PVC liner: Wall: / 19. Specified tee sizes are proper, gas baffle on outlet tee L 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox I / 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field I 26. Electrical permit for pump chamber/Separate meter for duplexes iosr 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 1/ 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber I l/ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature . 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: /; ! - ' 6 01 01