HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Pfiy Lot 3 9 Zone of Contribution: In_ Out Acreage _41__ ��w
Commercial: Residential: '
Street: // % k ; j -c
Village: Floor Plan: # Bedrooms: 3
Owner: Installer:
Address: -SC i ivrAv .K/7e,T -'/S C S
Phone:
Phone:
Builder: Engineer: 1>ku r-. C f� F -
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material,above water table si/
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: (V
5. Water line 10 ft from septic components Var.: 1
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: `/
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking`,ve11/25 ft irrigation well Var.: L.--7
11.Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: 1
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` I v
15. System not in top or subsoil (A,B horizons)or 5' removal I
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred /
_ 18. System meets breakout requirements PVC liner: Wall: /
19. Specified tee sizes are proper, gas baffle on outlet tee L
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use /
23.Minimum 6"stone or compacted below tank and dbox I /
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field I
26. Electrical permit for pump chamber/Separate meter for duplexes iosr
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed 1/
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber I l/
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature .
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: /; ! - ' 6 01 01