HomeMy WebLinkAboutEngineer PlanCONSTRUCTION NOTES 1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000): STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS. 2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20 LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE. 3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE. 4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING 48.0t FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE. 5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT_ PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LESS THAN 1% OTHERWISE. 6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40 PVC (OR EQUIVALENT) LAID AT 0,005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED AT END OR AS NOTED. 7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN DISTRIBUTION. 8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL. 9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM. 10.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE. 11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM. 12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM. 13.) THE DESIGNER WALL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER. 14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED. 15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. 16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS. 17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY SEPTIC SYSTEM COMPONENTS. 18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS. EXCAVATION NOTES 1) EXCAVATE ALL UNSUITABLE MATERIAL FOR A LATERAL DISTANCE OF 5' ABOVE LAYER C IN ALL DIRECTIONS BEYOND THE OUTER PERMTTER OF THE LEACHING 2) ENGINEER AND HEALTH INSPECTOR TO INSPECT EXCAVATION OF ALL UNSUITABLE MATERIAL PRIOR TO TITLE 5 COMPLIANT FILL PLACEMENT. 3) FILL MATERIAL SHALL CONSIST OF CLEAN GRANULAR SAND, FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES, WHICH MEETS THE TEXTURAL CRITERIA PUT FORTH IN SECTION 15.255(3) OF TITLE 5. 4) SCARIFY THE BOTTOM SURFACE OF THE EXCAVATION PRIOR TO PLACEMENT OF FILL INTO THE RETAINING STRUCTURE. 5) PLACE FILL ONLY WHEN BOTTOM SURFACE IS DRY, EL=51.5t 50.7f RAISE MIN. 20" DIAMETER COVER TO WITHIN 6" OF FINISH GRADE 49.5t 1 5 47.5 i] 46.35 r' 17't - GAS BAFFLE 1,500 GALLON SEPTIC TANK T r- r, T 1 1 /l I r- I n/� r_ Test Hole 1 (EL=46.6t) I L J I 1 1 V Li- LV lJ J Depth Elev. Layer Soil Class Soil Color Other 0"-6" 46.1 A Loamy Sand 10YR3/2 6"-23" 44.7 B Loamy Sand 10YR5/4 23"-123" 36.4 C Med Sand 10YR6/6 Test Hole 2 (EL=46.3t Depth Elev. Layer Soil Class Soil Color Other 0"-5" 45.9 A Loamy Sand IOYR3/2 56"-20" 44.6 B Loamy Sand t0YR5/4 20"_120" 36.3 C Med Sand 10YR6/6 Test Hole 3 (EL=48.2t Elev. Layer Soil Class Soil Color Other ff30" 47.8 A Loamy Sand 1OYR3/2 45.7 B Loamy Sand t0YR5/4 30-120 38.2 C Med Sand 10YR6/6 Test Hole 4 (EL=48.3t Elev. Layer Soil Class Soil Color Other ff 47.8 A Loamy Sand 10YR3/2 46.0 B LoamySand 10YR5/4 27"-128° 37.6 C Med Sand 10YR6/6 DATE OF TESTING: 09/21/22 SOIL EVALUATOR: MARK POSELLI WITNESS: JAY GARDINER YARMOUTH HEALTH AGENT PERCOLATION RATE HOLE: LESS THAN < 2 MIN/INCH (@ 47") NO GROUNDWATER ENCOUNTERED NO MOTTLING ENCOUNTERED u 6" Crush / Stone RAISE MIN. 20" DIAMETER COVER TO WITHIN 6" OF FINISH GRADE =48.0t -H 0 o GEOTEXTILE 45.3t FABRIC 1 - n 45.0 3/4" to N: '• 44.5 N� 1-1/2 STONE DB-3 H-20 {Double wash) m."T D-BOX TWO (5) 500 GALLON PRECAST 42.5 CONCRETE LEACH CHAMBERS WITH 4' OF 1 STONE ON ENDS AND 4' ON SIDES ' 12'f - t--12't -1 r LEACH CHAMBERS 6.2 (END VIEW) FLOW PROFILE NOT TO SCALE EL= 36.3 Bottom Test Hole SYSTEM DESIGN CALCULATIONS SEWAGE DESIGN FLOW: THREE BEDROOM DWELLING 0 110 GPD/BEDROOM = 330 GPD (MINIMUM DESIGN REQUIR 330 GPD SEWAGE DESIGN FLOW PROVIDED: TWO (2) 500 GALLON CHAMBERS WITH 4' STONE ON THE ENDS AND 4' STONE ON THE SIDES Vt = [(25 x 12.83) + 2(25 + 12.83) (2) x .74 = 349 GPD PROVIDED 349 GPD PROVIDED > 330 GPD REQUIRED SEPTIC TANK CAPACITY REQUIRED: 330 GPD X 200 = 660 (MINIMUM) SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN F�PW� OF &,,A TEPHE B. d A`O S }R 1s L ,> Site and Septic Plan 135 Highbank Road South Yarmouth, MA Prepared for: REpurpose Properties, LLC 618 Route 28 Buzzards Bay, MA Prepared by: All Cape Septic and Survey 618 Route 28 West Yarmouth, MA 02673 (508) 771-4200 alicapeseptic@gmail.com Date: 11/08/22 Sheet 2 of 2 Revised Date: 1/05/23 project No. AC-504-2 ---7 (50 46) Map 80 / Parcel 106 �� c16 {, >� Zone: R-40 0 0 / N 43.0510 E 106.35 / 40,000 Sq. Ft. / (50.0) To 150' Frontage F 1 TBM EL = 50.0 w F ��' / Top of IP — — — i Setbacks o� acCT (49, TBM EL = 50.3 Ln Front 30' / N Side 20' o / Sono Tubes TP � Rear 20' Sheer, � (Typical#4 Max. Coverage 25% Rood o� 50 (48.3) Proposed Coverage 10.3% a LOCUS t �5'• ° *Perc a0\\ Bass River J G / NO�e ( I Test nor Golf Course ,p\` /� \ o a armouth Health Departme t j4<.0) \ \\ <0-A/" N `,� I 4) I a South Yarmouth, MA \ o, I L I PROVED (49.1) I jr --I> SITE LOCUS / \ D /W 3.7' -- Proposed I i e Hate NOT TO SCALE �\ \\ 3 Bedroom — — -I / 6\ 2.0 House / S•\ `� TOF El = 51. See Excavation 1.) Assessor's Map 80 Parcel 105 / / •h��� \ \ ��O � h� Notes D1236996 ma`s , DB / / / \ 4 3 ) 3.j 2_ LC Plan 28477-D Sht 1 Lot 100 S4'19) O 'o- o +++++ \ ( w 4.) This properry is not in the Zone II / Slab / ++ + + + + \ TP 28,t o 48 Protection Water District O +` ++++ #3 �- 5.) This property is in Flood Zone X / 50 �, �� ST ++ +++++ (48 2) Firm map 25001CO591J Dated: 7/16/14 O + / �a (46.3) (48.5) i \?+++ / to Lot 100 / i Sono Tubes 19,697± Sq. Ft. (Typical) TP SAS Paracel8 P��H 06 OFP,VgSS L = 48.14' (48.2) / �, #2 )R _H *Perc (46.6) ) STEPHENq°s Test TP j B, n R = 20.0 / Cl48 (46.3) o #1 46 S 43'05'10" W �- 185.0' rsTE� �48 ------ (47.3) — ^--------------747.8T---------- 1/ J' (48.0) Site and/ SJeptic Plan Hlghbank Road G]z:; 7 135 Highbank Road South Yarmouth, MA u 40' Public Way Prepared for: Prepared by: JAN O b 2023 REpurpose Properties, LLC All Cape Septic LLC GRAB-HIC SCALE HEALTH DEPT. PO Box 334 West 618 Route 28 Yarmouth, MA 02673 LOCAT10N OF UTILITIES IS APPROXIMATE AND ALL 20 0 10 20 40 so Buzzards Bay, MA (508) 771-4200 UNDERGROUND AND OVERHEAD UTILITIES MUST BE DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT ailcopeseptic@gmail.com OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO, REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES AND THE LOCAL WATER DEPARTMENT. ( IN FEET ) 1 inch = 20 ft. Date: 11/08/22 Revised Date: 1 /05/23 Sheet 1 of 2 By: MA Check: SMJ Project No. AC-50