Loading...
HomeMy WebLinkAbout2023 Jan 19 Brown & Caldwell December Quarterly Report 200 Brickstone Square,Suite 403 Andover, MA 01810 T:978.794.0336 January 16, 2023 Brown AND Caldwell • Mr. Mark Dakers, Section Chief Solid Waste Management Section Department of Environmental Protection Southeast Regional Office 20 Riverside Drive Lakeville, Massachusetts 02347 Subject: Quarterly Third-Party Inspection Reports Yarmouth-Barnstable Regional Transfer Station Dear Mr. Dakers: On behalf of Covanta as it relates to the Yarmouth-Barnstable Regional Transfer Station, South Yarmouth, MA, enclosed are the Third-Party Operation and Maintenance and Waste Ban Inspection Reports for December 2022. If there are any questions, please contact me at(508) 819-1437 or via email at jkotowski@brwncald.com. Very truly yours, Brown and Caldwell G3CMObED .eus JAN 1 Y 2023, HEALTH DEPT. Julie Kotowski Senior Associate cc: Yarmouth Board of Health Roby Whitehouse, Town of Yarmouth/Barnstable via email Thomas Stanwood, Covanta via email Daniel Peters, Covanta via email Attachments (2) 1. Operation and Maintenance Inspection Report 2. Waste Ban Inspection Report • MassDEP Massachusetts Department of Environmental Protection Important:When completing this formonacomputer,use Bureau of Waste Prevention / Solid Waste Management only the Tab key to move your Third-Party Inspection Report— 310 CMR 19.018(8) cursor-not theRetumkey. Operation & Maintenance s P I Instructions Use this form to record and report the results of a Third-Party Operation and Maintenance MassDEP Use Only Inspection conducted pursuant to 310 CMR 19.018. Be sure to obtain the most recent version Rec'd Date: of this form. All applicable sections of the submitted form must be completed to be accepted by MassDEP. Pursuant to 310 CMR 19.018(8)(a), the third-party inspector and facility owner/operator must sign FMF#: this Third-Party Inspection Report form and submit the completed report to the appropriate RO#: MassDEP regional office and one copy of each completed report to the board of health of the municipality in which the facility is located. Reviewer: In the event that this inspection report contains a recommendation for corrective action(s),the Comments: owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2. Forms and instructions are available online: http://www.mass.qov/eea/agencies/massdep/recycle/approvals/solid-waste-applications-and-forms.html#8 Note: This form does not identify all of the requirements applicable to each solid waste management facility;other requirements and/or policies may apply to the operation, maintenance and monitoring for each facility. I. Facility Information Facility Type (check one): ® Transfer Station/Handling Facility ❑ C&D Waste Processor or C&D Waste Transfer Station ❑ Municipal Waste Combustor ❑ Active Landfill ❑ Closed Landfill ❑ Other: Specify Facility: Yarmouth-Barnstable Regional Transfer Station Facility Name South Yarmouth MA 02664 City/Town State ZIP Code 508-394-1501 329275 329274 Telephone Number Regulated Object Account Number FMF Number Operator: Covanta Company of SEMASS, L.P. Operator Name(Doing Business As/Company Name) 781-843-6209 tstanwood@covanta.com Telephone Number Email Address 141 Cranberry Highway Mailing Address West Wareham MA 02576 City/Town State ZIP Code Permittee: Town of Yarmouth — Department of Public Works Permittee Name(Entity Identified on Facility Permit) 50 Workshop Road Mailing Address South Yarmouth MA 02664 City/Town State ZIP Code Responsible Official for the Facility: Thomas Stanwood tstanwood@covanta.com Responsible Official Name(Individual) Responsible Official Email Address Covanta 781-843-6209 Responsible Official Company Name Responsible Official Telephone Number Third-Party Inspection Report(O&M)-Rev.12/4/14 Page 1 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance II. Third-Party Inspector Andrew Bushman Brown and Caldwell Third-Party Inspector Name Company Name SW48-0000140 07/09/2023 MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date(MM/DD/YYYY) 508-819-1437 abushman@brwncald.com Telephone Number Email Address 200 Brickstone Square, Suite 403 Mailing Address Andover MA 01810 City/Town State ZIP Code Construction and Demolition Waste(C&D Waste)Processing Facility or C&D Waste Transfer Station Only: Identify the qualified individual that conducted the observation of incoming waste loads and collection of samples of suspect asbestos- containing materials during the inspection [pursuant to 310 CMR 19.018(6)(f)]. If the entire inspection was conducted by the third-party inspector listed above,then check the box and enter only the Asbestos Inspector Certification Number. ❑ Same as above. Provide Asbestos Certification Number ► MA Dept.of Labor Standards Asbestos Inspector Certification Number Asbestos Inspector Name Company Name Telephone Number Email Address Mailing Address City/Town State ZIP Code Ill. Inspection Details A. FREQUENCY Indicate the scheduled inspection frequency for this facility as required by 310 CMR 19.018(6)(b), or a more frequent schedule set forth in the Facility Permit/Other Approval: ❑ Bi-Monthly ® Quarterly ❑ Semi-Annual ❑ Annual ❑ Biennial ❑ Other(include permit/approval type and date of issuance): B. DATE,TIME&PERSONNEL Inspection Date (MM/DD/YYYY): 12/19/2022 Inspection Start Time: 11:45 ®AM ❑ PM Facility Representatives in Attendance During Inspection: Janet Baierlein, Scale Operator for Lawrence Waste Services C. CONDITIONS Air Temperature: Approximately 40 degrees F. Wind Direction (direction from which the wind is blowing): Weather: ® Clear ❑ Partly Cloudy ❑ Cloudy ❑ NW ❑ N ❑ NE ® Dry ❑ Rain ❑ Snow ®w Wind ❑E Wind Speed: ❑ Calm ❑ Breeze ® Moderate ❑ Strong ❑SW ❑S ❑SE Third-Party Inspection Report(O&M) Page 2 of 13 MassOEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance IV. Pre-Inspection Preparation A. FACILITY-SPECIFIC O&M REQUIREMENTS During each third-party inspection,the third-party inspector shall examine and evaluate the facility's solid waste activities, equipment, operations, practices, procedures, and records relevant to the type of third-party inspection being conducted in order to determine the facility's compliance with all applicable requirements as set forth in 310 CMR 19.018(6)(a)1. Therefore, pursuant to 310 CMR 19.018(6)(a)1, prior to conducting a third-party facility operation and maintenance inspection, the third-party inspector shall,without limitation, complete all of the following: ® Review and become familiar with the regulations set forth at 310 CMR 19.000—Massachusetts Solid Waste Regulations. ® Identify, review and become familiar with all solid waste permits plans, approvals, and orders (or other enforcement documents issued to the facility by the Department), and the solid waste requirements applicable to the operation and maintenance of the facility. Relevant requirements may include, without limitation, specific practices and procedures for the operation, maintenance and monitoring of the facility,waste acceptance/storage limits, and other requirements related to the facility's solid waste activities. Without limitation, these facility-specific requirements may be contained in the Facility Permit, Authorization to Construct, Authorization to Operate, Operation and Maintenance Plan, Closure/Post-Closure Plans and Approvals, Facility Modification Approvals, Beneficial Use Determinations,Administrative Consent Orders, and other determinations, authorizations or enforcement actions issued by the Department. I,Andrew Bushman, have identified, reviewed and understand all of the aforementioned requirements that ► ACB are applicable to this facility and the following are my observations and recommendations related to the Inspector Initials facility-specific requirements. B. SOLID WASTE PERMITS, PLANS,APPROVALS&ORDERS List all relevant solid waste permits, plans, approvals, orders or other enforcement actions issued to the facility by the Department that contain specific practices, procedures and other requirements still in effect for the operation, maintenance and monitoring or closure/post-closure of the facility. Where applicable, provide the plan or issue date for each item. For enforcement actions, include the document number, effective date, and status of implementation by the facility. Discussion: Listed below are relevant solid waste permits and approvals, only applicable permit conditions are listed. 1. Waste Ban Compliance Plan, dated 08/01/2022. 2. Operation and Maintenance Plan, dated June 2010. 3. Permit Clarification Notice, BWP SW 07, Trans No. X233508, dated 09/22/2010. • Tonnage rate clarification: 38 TPD of SSR as an average rate. • Max.tonnage rate: 530 TPD of MSW and SSR combined. • Third Party inspections: inspections done on a quarterly basis. 4. Provisional Approval BWP SW 07 Modification of Large Handling Facility, Trans No. X233508, 08/06/2010. 5. Site Assignment, Yarmouth Board of Health, 11/10/1987. 6. Certification for Operation and Transfer Station pursuant 310 CMR 19.035(2)(f), dated 02/13/2020. Third-Party Inspection Report(0&M) Page 3 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance V. Performance Standards Examine and evaluate the facility's solid waste activities, equipment, operations, practices, procedures and records relevant to the type of solid waste facility. Using the tables below, identify all areas evaluated by the inspector during the inspection by checking the box in the first column. Describe all deviations noted during the inspection in the third column. Provide recommendations for corrective action to return to compliance with the applicable performance standard in the fourth column. Facility Type Performance Standards Transfer Station/Handling Facility Complete Section A. (Including C&D Facility) If C&D Handling/Processing Facility, then also complete Section B. Municipal Waste Combustor Complete Section A. Active Landfill Complete Sections C. and F. If active ash landfill, then also complete Section D. Closed Landfill Complete Sections E. and F. A. TRANSFER STATION, HANDLING FACILITY, OR MUNICIPAL WASTE COMBUSTOR(INCLUDING C&D FACILITY) Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) 19.205(1) ® Storm Water Controls. Good 19.205(2) Good Equipment. 19.205(3) Weighing Facilities. Good 19.207(1) General. Discuss in Section VI. Discuss in Section VI. 19.207(2) Supervision of Operation. Good 19.207(3) Access to Facilities. Good 19.207(4) Good Security. 19.207(5) Posting of Handling Facility. Good 19.207(6) Unloading of Refuse. Managed effectively 19.207(7) None observed Special Wastes. 19.207(8) Banned/Restricted Wastes. Managed effectively 19.207(9) Hazardous Waste. None observed 19.207(10) 171 Household Hazardous Waste Not applicable and Waste Oil Collections. 19.207(11) Bulky Waste. None observed 19.207(12) Liquid Wastes. None observed Third-Party Inspection Report(0&M) Page 4 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation & Maintenance Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) 19.207(13) Bird Hazards. No bird hazards observed 19.207(14) Dust Control. No dust conditions observed outside of tipping floors 19.207(15) Vector Control. No vector conditions observed 19.207(16) Control of Wind-blown Litter. Managed effectively—see discussion in Section VI 19.207(17) Staffing. Adequate 19.207(18) Employee Facilities. Good 19.207(19) Good Accident Prevention/Safety. 19.207(20) Fire Protection. Good 19.207(21) Recycling Operations. Managed effectively 19.207(22) Records for Operational and Good Plan Execution. 19.207(23) Screening and/or Fencing. Good 19.207(24) Open Burning. None observed 19.207(25) Inspections. Quarterly 19.207(26) End-of-Life Mercury-added None observed Products. B. CONSTRUCTION AND DEMOLITION (C&D)WASTE PROCESSING FACILITY OR C&D WASTE TRANSFER STATION Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) 19.206(1) Enclosed Operations. 19.206(2) Storage. 19.206(3) El Contact Water. Suspect Asbestos-Containing El Material (ACM) Inspection and Magna ement Protocol. Sample collection of suspect ACM from incoming loads. Discuss sample results: ► ❑Attach analytical reports. Third-Party Inspection Report(O&M) Page 5 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance C. ACTIVE LANDFILL Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.130(1) General. Discuss in Section VI. Discuss in Section VI. 19.130(2) Operator Supervision. 19.130(3) Special Wastes. 19.130(4) Banned/Restricted Wastes. 19.130(5) Hazardous Waste. 19.130(6) Bulky Wastes. 19.130(7) Liquid Wastes. 19.130(8) Solid Waste Handling. 19.130(9) Bird Hazards. 19.130(10) Equipment and Shelter. 19.130(11) Staffing. 19.130(12) Employee Facilities. 19.130(13) Accident Prevention/Safety. 19.130(14) Spreading and Compacting of Solid Waste. 19.130(15) Cover Material. 19.130(16) Vector, Dust and Odor Control. 19.130(17) Litter Control. 19.130(18) Top Slope and Side Slopes. 19.130(19) Storm Water Drainage. 19.130(20) Erosion Control. 19.130(21) 111 Boundary/Elevation Markers. 19.130(22) Access Roads. 19.130(23) Security. 19.130(24) Posting of the Landfill. Third-Party Inspection Report(O&M) Page 6 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report— 310 CMR 19.018(8) Operation & Maintenance Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.130(25) Open Burning. 19.130(26) Fire Protection and Control. 19.130(27) Convenience and Recycling Drop-off Areas at Landfills. 19.130(28) Waste Oil Collections at Landfills. 19.130(29) Household Hazardous Waste Collections at Landfills. 19.130(30) Leachate Collection, Treatment and Disposal. 19.130(31) Phase Completion of the Landfill. 19.130(32) Disruption of Landfilled Areas. 19.130(33) Construction of Buildings. 19.130(34) Records for Operational and Plan Execution. 19.130(35) Inspections. 19.130(36) Re-circulation of Leachate. 19.130(37) End-of-Life Mercury-added Products. D. ASH LANDFILL Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.131(1) General. Discuss in Section VI. Discuss in Section VI. 19.131(2) Fugitive Emissions. 19.131(3) Ash Moisture Content. 19.131(4) Spreading/Compacting of Ash. 19.131(5) Vehicle Washdown/ Wheelwash/Other Measures. Third-Party Inspection Report(O&M) Page 7 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance E. CLOSED LANDFILL Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) 19.016 Post-closure Use. 19.142(1) CIGeneral. Discuss in Section VI. Discuss in Section VI. 19.142(2) Post-closure Period. 19.142(3) Post-closure Period Waiver. 19.142(4) Post-closure Period Extension. 19.142(5) Post-closure Requirements. 19.142(6) Inspection Requirements. 19.142(7) Additional Measures. 19.142(8) - Termination of the Post- Closure Period. 19.143(1) Applicability. 19.143(2) Submission of Post-closure Use Plans. 19.143(3) Criteria for Approval of Post- closure Use. 19.143(4) Post-closure Construction. Third-Party Inspection Report(O&M) Page 8 of 13 • MassOEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report- 310 CMR 19.018(8) Operation & Maintenance F. ADDITIONAL LANDFILL REQUIREMENTS Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) ❑ 19.132 Environmental Monitoring Requirements. Is the monitoring of surface water, ground water, landfill gas and any other media as determined by the Department, including without limitation, soil and sediment, being conducted on the schedule established in the permit or as otherwise required by the Department? ❑ YES ❑ NO Are the analytical results of the environmental monitoring submitted to the Department within 60 days after the date of sample collection or as otherwise specified by the Department? ❑ YES ❑ NO ❑ 19.133 Maintenance of Environmental Control and Monitoring Systems. Are the facility operations conducted in a manner which protects all environmental control systems as approved in the Operation and Maintenance plan and monitoring systems as approved in the Operation and Maintenance plan or permit? ❑ YES ❑ NO Is regular maintenance of all landfill environmental control systems performed as approved in the Operation and Maintenance plan or permit? ❑ YES ❑ NO Has the Department been notified of the existence and extent of damaged or destroyed environmental control systems, monitoring devices, or surface water sampling location markers in accordance with 310 CMR 19.133(1)(c)and/or 19.133(1)(e)? ❑ N/A(if no damage to report) ❑ YES ❑ NO Continue to Next Page 0- Third-Party Inspection Report(O&M) Page 9 of 13 MassOEP Massachusetts Department of Environmental Protection IL Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance F. ADDITIONAL LANDFILL REQUIREMENTS—Continued Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) El19.121(4) Landfill Gas Recovery Operation and Maintenance Requirements. Is condensate generation kept to a minimum and condensate recirculation, if proposed, performed in accordance with the permit? ❑ YES ❑ NO Are the sampling and analysis of condensate conducted on the schedule established in the permit or as otherwise required by the Department? ❑ YES ❑ NO Are the analytical results of condensate monitoring reported to the Department as established in the permit or as otherwise required by the Department? ❑YES ❑ NO Is an annual report on the operation of the landfill gas recovery facility submitted to the Department as specified in the permit? ❑ YES ❑ NO Third-Party Inspection Report(O&M) Page 10 of 13 MassOEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance VI. Inspection Observations A. FACILITY CONDITION AND OPERATIONS Examine and evaluate the facility condition and operations as observed during the inspection, including the following: E Describe any evidence of the following conditions observed at the time of the inspection: • Unpermitted discharges to air,water, land or other natural resources of the Commonwealth; and • Dust, odors, litter, and/or other nuisance conditions. E Document and discuss all deviations from any specific requirements for the facility that are not addressed in the previous section (Section V.—Performance Standards), including without limitation,the requirements set forth in the facility's operation and maintenance plan,orders or other enforcement documents,and other solid waste permits,approvals,and authorizations issued to the facility by MassDEP. E List the types and estimated quantities of all waste and materials stored at the facility at the time of the inspection. E Provide a narrative that describes the overall status of the general condition, operation and performance of the facility as observed at the time of the inspection. 'Attach photographs taken during the inspection that depict the general condition and operation of the facility. At a minimum, include photographs, as applicable, of the waste unloading (tipping)area,waste storage areas, recyclable material storage and,for transfer stations,the waste reloading activity. Discussion:At the time of the inspection, the Facility appeared to be operating within the conditions of permits, approvals, and Operation &Maintenance Plan. There was no evidence of unpermitted discharges to air,water, land or other natural resources. Some litter was observed along the northwestern portion of the rail line. According to the facility representative, routine litter pickup is conducted. No dust,odors, or other nuisance conditions were identified. B. RECORD REVIEW Examine and evaluate the facility's record-keeping. Without limitation, document the status of the facility's compliance with, and any deviations from,the record-keeping required by 310 MCR 19.000;the facility's operation and maintenance plan; orders or other enforcement documents issued to the facility;and other solid waste permits, approvals, determinations and authorizations issued to the facility by the Department, including the following: E Discuss the evaluation of the Facility's"daily log"such as,daily tonnage records. E List and discuss any special incidents that have occurred since the previous inspection such as exceedances of the facility's permitted waste acceptance limits, nature and outcome of complaints reported to the facility operator(including the identity of the complainant, if known),fires,emergencies,or other disruptions to the routine operation of the facility. Discussion: Based on the tonnage records reviewed and provided by Covanta,the Facility appears to be within the permitted tonnage limits in the time since the last inspection. Third-Party Inspection Report(O&M) Page 11 of 13 MassOEP Massachusetts Department of Environmental Protection Iiii.v Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation & Maintenance VII. Summary and Recommendations Pursuant to 310 CMR 19.018(6)(a)4., where a third-party inspector observes that the operation or maintenance of the facility deviates from the aforementioned applicable requirements, he or she shall document all such deviations and recommend corrective actions for the facility to take to return to compliance. A. INSPECTION RESULTS Based on the examinations and evaluations conducted in Sections V. and VI., please summarize the inspection results by checking one of the following determinations: ® No deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6) were identified during this inspection. If no deviations were identified during the inspection, check this box and proceed to Section VII.B. ❑ Deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6)were identified during this inspection and are discussed further in this report. If deviations were identified during the inspection, check this box and ensure that each deviation and the recommended corrective actions are discussed in the applicable section(s)below. B. STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION If a previous inspection report identified deviations with recommendations for corrective action, please describe the action(s)taken since the last inspection to return the facility to compliance with the applicable requirements. Discussion: N/A C. RECOMMENDATIONS FOR CORRECTIVE ACTION Based on the results of this inspection, please list all deviations noted during the inspection and provide recommendations for corrective action to return to compliance with the applicable requirement. Recommendations: None. D. ADDITIONAL COMMENTS Comments: VIII. Additional Information Checklist Attach the following additional information, as applicable, to complete the inspection report.* ® Attach photographs taken during the inspection that depict the general condition and operation of the facility, as required in Section VI.A. ❑ For C&D Waste facilities only, attach the analytical results, as required in Section V.B. *Note:Pursuant to 310 CMR 19.018(8), MassDEP may request additional information. Continue to Certification Statement on Next Page P. Third-Party Inspection Report(O&M) Page 12 of 13 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation & Maintenance IX. Certification —THIRD-PARTY INSPECTOR "I attest under the pains and penalty of perjury that: 1444004/44,___ 1. I have personally examined and am familiar with the information contained in this submittal,including any and all documents Signature of Third-Party Inspector accompanying this certification statement; Andrew Bushman 2. Based on my inquiry of those persons responsible for obtaining the information,the information contained in this submittal is,to the best of Print Full Name my knowledge,true,accurate and complete; 3. I have been able to conduct the third-party inspection and prepare the Brown and Caldwell third-party inspection report without being influenced by the facility Company Name owner or operator and, (if I am a municipal employee)without being influenced by my municipal employer,by any coworker or by any 01/16/2023 elected or appointed official of the municipality;and 4. I am aware that there are significant penalties,including,but not limited Date(MM/DD/YYYY) to,possible administrative and civil penalties for submitting false, inaccurate,or incomplete information and possible fines and imprisonment for knowingly submitting false,inaccurate,or incomplete information." X. Certification — FACILITY OWNER/OPERATOR Does the facility maintain a Financial Assurance Mechanism (FAM)pursuant to 310 CMR 19.051? ❑ YES El NO If yes: • Enter the amount of the current FAM: $ • Enter the date of the last revision of the FAM amount, pursuant to 310 CMR 19.051(6): As a reminder,pursuant to 310 CMR 19.051(6), the estimate of the cost of closure and post-closure maintenance must be revised every year,and every second year shall be submitted to the Department. "I certify under the penalty of law: 1. That I have personally examined and am familiar with the information submitted in this third-party inspection report,including but not limited to Signature of Responsible Official the statements above concerning the financial assurance mechanism in place in accordance with any facility permit and 310 CMR 19.051, and all attachments and that,based on my inquiry of those individuals Thomas Stanwood immediately responsible for obtaining the information, I believe that the Print Full Name information is true,accurate and complete. I am aware that there are significant penalties both civil and criminal for submitting false Facility Manager information including possible fines and imprisonment. Title 2. That,in the event that this inspection report contains a recommendation for corrective action(s), I have completed and attached to this report a 01/16/2023 Corrective Action Plan and Schedule*,pursuant to 310 CMR Date(MM/DD/YYYY) 19.018(8)(c)2." "Note:The owner or operator may elect to correct deviations identified in the Third- ► Pursuant to 310 CMR 19.018(8)(c),a copy of each third- Party Inspection Report in a manner that is different than that recommended by the party inspection report shall be maintained at the facility in Third-Party Inspector,so long as the facility is brought back into compliance with accordance with the requirements of 310 CMR 19.000. The applicable requirements. owner and operator shall make third-party inspection reports available to personnel or authorized representatives of the Department for review at the facility upon request. Within 30 days of the • Mail this completed form to the MassDEP Regional A list of municipalities and MassDEP Regional inspection date: Office that serves the municipality in which the facility Offices is available online at: is located.(Attention:Solid Waste Management) http://www.mass.qov/eea/agencies/massdep/about/ contacts/find-the-massdep-reqional-office-for-you r- • Send one copy to the local board of health for the city-or-town.html municipality in which the facility is located. Third-Party Inspection Report(O&M) Page 13 of 13 Covanta Yarmouth-Barnstable Regional Transfer Station December 2022 Quarterly Inspection - • 1 it . . _, ..„ . ,, Cik u''': yamYy,,` s�.y}�� m �.. Photograph 1 - Scale s. VIVA 1M R lot tr S Ye*srrrsenppq Rr. n.m s� 'rIt cr lR41�c Photograph 2 - Receiving building Brown AND Caldwell i Covanta Yarmouth-Barnstable Regional Transfer Station December 2022 Quarterly Inspection y e - s•- �. , ,z Photograph 3 - Access road along rail container loading area facing east r.► Y E� sue• C —' '_, b Y ` xs„' 4AE �. `mow. r` , : �, n :: : - " awl All k.,Ii.. .:-////, it, , . , i r _ f f Y i iv •.,,. ._i. . �.�:* �^c ,... ..e _f.r .. .r . fir.,.. Photograph 4 - Tipping Floor Brown AND • Caldwell i MassDEP Massachusetts Department of Environmental Protection Important:When completing Bureau of Waste Prevention / Solid Waste Management this form on a computer,use only the Tab key to move your Third-Party Inspection Report—310 CMR 19.018(8) cursor-notthe Return key. Waste Ban Compliance �4 1 X. Instructions Use this form to record and report the results of a Third-Party Waste Ban Compliance Inspection MassDEP Use Only conducted pursuant to 310 CMR 19.018. Be sure to obtain the most recent version of this form. All applicable sections of the submitted form must be completed to be accepted by MassDEP. Rec'd Date: Pursuant to 310 CMR 19.018(8)(a),the third-party inspector and facility owner/operator must sign this Third-Party Inspection Report form and submit the completed report to the appropriate MassDEP regional FMF#: office and one copy of each completed report to the board of health of the municipality in which the facility is located. RO#: In the event that this inspection report contains a recommendation for corrective action(s),the Reviewer: owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2. Comments: Forms and instructions are available online: http://www.mass.gov/eea/agencies/massdep/recycle/approvals/solid-waste-applications-and-forms.html#8 Pursuant to 310 CMR 19.018(7)(b),facilities that do not accept loads greater than five cubic yards,and facilities that participate in the Class II Recycling Program in accordance with 310 CMR 19.300,are exempt from the requirements of 310 CMR 19.018(7). Note:This form does not identify all of the requirements applicable to each solid waste management facility;other requirements and/or policies may apply to the operation,maintenance and monitoring of each facility. I. Facility Information Facility Type(check one): ®Transfer Station/Handling Facility 0 C&D Waste Processor or C&D Waste Transfer Station 0 Municipal Waste Combustor ❑Active Landfill ❑ Other CO(@01/�pp Specify Facility: JAN 1 9 2023 Yarmouth-Barnstable Regional Transfer Station Facility Name South Yarmouth MA 026Rd HEALTH DEPT, City/Town State ZIP Code 508-394-1501 329275 329274 Telephone Number Regulated Object Account Number FMF Number Operator: Covanta Company of SEMASS, L.P. Operator Name(Doing Business As/Company Name) 781-843-6209 tstanwood@covanta.com Telephone Number Email Address 141 Cranberry Highway Mailing Address West Wareham MA 02576 City/Town State ZIP Code Permittee: Town of Yarmouth— Department of Public Works Permittee Name(Entity Identified on Facility Permit) 50 Workshop Road Mailing Address South Yarmouth MA 02664 City/Town State ZIP Code Responsible Official: Thomas Stanwood tstanwood@covanta.com Responsible Official Name(Individual) Responsible Official Email Address Covanta 781-843-6209 Responsible Official Company Name Responsible Official Telephone Number Page 1 of 7 Third-Party Inspection Report(Waste Ban)-Rev.12/4/14 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report— 310 CMR 19.018(8) Waste Ban Compliance II. Third-Party Inspector Andrew Bushman Brown and Caldwell Third-Party Inspector Name Company Name 5W48-0000140 07/09/2023 MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date(MM/DD/YYYY) (508) 819-1426 abushman@brwncald.com Telephone Number Email Address 200 Brickstone Square, Suite 403 Mailing Address Andover MA 01810 City/Town State ZIP Code III. Inspection Details A. FREQUENCY Indicate the scheduled inspection frequency for this facility (as required by 310 CMR 19.018(7)(d), or a more frequent schedule set forth in the Facility Permit/Other Approval): ❑ Bi-Monthly ❑ Quarterly ® Semi-Annual ❑ Annual ❑ Other(include permit/approval type and date of issuance): See general comments below. B. DATE, TIME& PERSONNEL Inspection Date (MM/DD/YYYY): 12/19/2022 Inspection Start Time: 11:50 ®AM ❑ PM Facility Representatives in Attendance During Inspection: Janet Baierlein, Scale Operator for Lawrence Waste Services C. GENERAL COMMENTS Eight qualifying loads were visually inspected during this inspection. Third-Party Inspection Report(Waste Ban) Page 2 of 7 MassOEP Massachusetts Department of Environmental Protection ILL_ Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Waste Ban Compliance IV. Pre-Inspection Preparation A. FACILITY-SPECIFIC WASTE BAN COMPLIANCE REQUIREMENTS During each third-party inspection, the third-party inspector shall assess compliance with the waste bans by the facility and by the haulers and generators delivering waste to the facility, in order to determine the facility's compliance with all applicable waste ban requirements as set forth in 310 CMR 19.018(7)(c)1. Therefore, pursuant to 310 CMR 19.018(7)(c)1, prior to conducting a third-party waste ban inspection,the third-party inspector shall,without limitation, complete all of the following: ® Identify, review and become familiar with all solid waste requirements applicable to waste ban compliance at the facility including the facility's waste ban compliance plan, as approved by the Department. ® Review and become familiar with the regulations set forth at 310 CMR 19.017— Waste Bans. ® Review and become familiar with MassDEP's Guidance for Sold Waste Handling and Disposal Facilities on Compliance with MassDEP's Waste Bans. I,Andrew Bushman, have identified, reviewed and understand all of the aforementioned requirements that N. ACB are applicable to this facility and the following are my observations and recommendations related to the Inspector Initials facility-specific requirements. B. CURRENT WASTE BAN COMPLIANCE PLAN 08/01/2022 Certification Form 19.035 Plan Date(MM/DD/YYYY) Approval Date, if applicable Identify the number of comprehensive load inspections the facility is required to conduct each month*: 16 (see Waste Ban Compliance Plan, Part D) Number of Loads *Note: This is independent from and maybe different than the required number of loads observed during a Third-Party Waste Ban Inspection. C. MINIMUM NUMBER OF LOADS FOR OBSERVATION Identify the number of incoming waste loads that will be observed by the third-party inspector during the inspection: ❑ Standard: Pursuant to 310 CMR 19.018(7)(e)1,the minimum number of loads observed during the inspection will be: ❑ For a facility permitted to accept from 1 to 99 tons of waste per day,four(4)vehicle loads. ❑ For a facility permitted to accept greater than 99 but less than 299 tons of waste per day, eight(8)vehicle loads. ❑ For a facility permitted to accept greater than 299 but less than 499 tons of waste per day, twelve(12)vehicle loads. ❑ For a facility permitted to accept greater than 499 but less than 999 tons of waste per day, sixteen (16)vehicle loads. ❑ For a facility permitted to accept more than 999 tons of waste per day, twenty(20)vehicle loads. ® Alternative: Pursuant to 310 CMR 19.018(7)(e)2, an alternative number of loads* will be observed during 8 the inspection. Identify the number of loads and provide the basis for using this alternative: Number of Loads *Note:As an alternative to the minimum number of loads set forth at 310 CMR 19.018(7)(e)1, fora facility that has operated below the facility's permitted capacity for the previous year,the third-party inspector may apply the average actual daily receipt of waste(in tons)over the preceding year(instead of the permitted tonnage amount)to the minimum load criteria set forth at 310 CMR 19.018(7)(e)1. Explanation: Based on the current average tonnage from 2021 records (approx. 217 TPD). Third-Party Inspection Report(Waste Ban) Page 3 of 7 MassOEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report —310 CMR 19.018(8) Waste Ban Compliance D. OTHER PLANS,APPROVALS&ORDERS List all other relevant permits, plans, approvals, orders or other enforcement actions issued to the facility by the Department that contain specific practices, procedures, and other requirements still in effect for waste ban compliance at the facility. Where applicable, provide the plan or issue date for each item. For enforcement actions, include the document number, effective date and status of implementation by the Facility. Permits/Plans/Approvals: Waste Ban Compliance Plan Update, dated 08/01/2022. V. Inspection Observations During the inspection and for the minimum number of loads as required pursuant to 310 CMR 19.018(7)(e),the third-party inspector shall examine and evaluate waste ban compliance as follows: A. OPERATIONS & RECORD-KEEPING Examine and evaluate the facility's operations and record-keeping related to waste ban compliance. Performance Standard Response Comments/Observations and Recommended Corrective Action(s) Is the ongoing monitoring of incoming waste being conducted in ® YES ❑ NO accordance with the facility's approved waste ban compliance plan and other applicable requirements? Are the comprehensive load inspections of incoming waste ® YES ❑ NO being conducted in accordance with the minimum inspection frequency set forth in the facility's approved waste ban compliance plan? (Refer to Section IV.B. above.) Are the results of the ongoing monitoring and comprehensive ® YES ❑ NO load inspections being properly documented in accordance with the facility's approved waste ban compliance plan and other applicable requirements? Is the failed load communication, including failed load letters as ® YES ❑ NO applicable, being conducted in accordance with the facility's approved waste ban compliance plan and other applicable requirements? B. LOAD OBSERVATION Once the third-party inspector begins the Waste Ban inspection, the third-party inspector shall visually monitor and document all incoming loads received at the facility during the inspection until the applicable minimum number of loads containing at least five cubic yards of material each have been observed. (Refer to Section IV.C. above.) Please retain photographs and a copy of the weigh slip (if applicable)for each failed load identified during the inspection. Do not submit photographs or weigh slips with this inspection report; MassDEP may request such information to be submitted separately. ® Report data for each load observed during the inspection by completing the table provided by the Department online at: http://www.mass.qov/eea/agencies/massdep/recycle/approvals/solid-waste-applications-and-forms.html#8. Note: the completed Load Observation Table will be submitted to the Department electronically. Refer to the instructions in Section VII. General Comments/Observations: Eight qualifying loads were visually observed during this inspection. Third-Party Inspection Report(Waste Ban) Page 4 of 7 MassOEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Waste Ban Compliance C. COMPARATIVE ANALYSIS Pursuant to 310 CMR 19.018(8)(b)2.b., the third-party inspector shall provide a comparative analysis of the percentage of failed loads identified by the third-party inspector during the inspection and the percentage of failed loads documented pursuant to the ongoing load inspections conducted over the immediately preceding inspection period in accordance with the facility's approved waste ban compliance plan. For the purposes of the comparative analysis,the preceding inspection period should consist of the appropriate number of whole months prior to the inspection. For example, if a semi-annual inspection is required (one inspection every six months), then the comparative analysis for an inspection that occurs in November should include waste ban compliance data from May through October(the preceding whole six months). ® Prepare the comparative analysis required by 310 CMR 19.018(8)(b)2.b. by completing the comparative analysis summary provided by the Department online at: http://www.mass.gov/eea/agencies/massdep/recycle/approvals/solid-waste- applications-and-forms.html#8. Note: the completed Comparative Analysis Summary will be submitted to the Department electronically. Refer to the instructions in Section VII. General Comments/Observations: Facility waste ban compliance data is included from the period between May 1, 2022 and November 30, 2022. Third-Party Inspection Report(Waste Ban) Page 5 of 7 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report —310 CMR 19.018(8) Waste Ban Compliance VI. Summary and Recommendations Pursuant to 310 CMR 19.018(7)(c)4. where a third-party inspector observes that waste ban compliance at the facility deviates from the applicable requirements set forth at 310 CMR 19.018(7)(c)1., the third-party inspector shall document all such deviations and recommend corrective actions for the facility to take to return to compliance. A. INSPECTION RESULTS Based on the examinations and evaluations conducted in Section V., please summarize the inspection results by checking one of the following determinations: ® No deviations from the applicable waste ban compliance performance standards or additional requirements listed at 310 CMR 19.018(7)were identified during this inspection. If no deviations were identified during the inspection, check this box and proceed to Section VI.B. Deviations from the applicable waste ban compliance performance standards or additional requirements listed at 310 CMR 19.018(7)were identified during this inspection and are discussed further in this report. If deviations were identified during the inspection, check this box and ensure that each deviation and the recommended corrective actions are discussed in the applicable section(s)below. B. STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION If a previous waste ban compliance inspection report identified deviations with recommendations for corrective action, please describe the action(s)taken since the last inspection to return the facility to compliance with the applicable requirements. Discussion: N/A C. RECOMMENDATIONS FOR CORRECTIVE ACTION Based on the results of this inspection, please provide recommendations for corrective action to return to compliance, if necessary. Recommendations: None VII. Additional Information Checklist Attach the following additional information, as applicable, to complete the inspection report.* Z Complete the Load Observation Table as required in Section V.B. and submit an electronic copy of the completed table to the Department via email at: dep.swmstate.ma.us. Z Retain photographs and weigh slips for all failed loads identified during the inspection, as required in Section V.B. Do not submit photographs or weigh slips with this inspection report; MassDEP may request such information to be submitted separately. ® Complete the Comparative Analysis as required in Section V.C. and submit an electronic copy of the completed analysis to the Department via email at: dep.swm c(r�state.ma.us. *Note:Pursuant to 310 CMR 19.018(8), MassDEP may request additional information. Continue to Certification Statement on Next Page ► Third-Party Inspection Report(Waste Ban) Page 6 of 7 MassDEP Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Waste Ban Compliance VIII. Certification —THIRD-PARTY INSPECTOR "I attest under the pains and penalty of perjury that: 1. I have personally examined and am familiar with the information contained in this submittal,including any and all documents Signature of Third-Party Inspector accompanying this certification statement and any and all electronic Andrew Bushman data required to be submitted to the Department as part of this Print Full Name third-party inspection report; 2.Based on my inquiry of those persons responsible for obtaining the Brown and Caldwell information,the information contained in this submittal and such documents and electronic data is,to the best of my knowledge, Company Name true,accurate and complete; 3. I have provided to the facility owner or operator the electronic data 01/16/2023 (i.e.load observations and quarterly comparative analysis)required Date(MM/DD/YYYY) in section VII; 4. I have been able to conduct the third-party inspection and prepare the third-party inspection report without being influenced by the facility owner or operator and, (if I am a municipal employee) without being influenced by my municipal employer,by any coworker or by any elected or appointed official of the municipality; and 5.I am aware that there are significant penalties,including,but not limited to,possible administrative and civil penalties for submitting false,inaccurate,or incomplete information and possible fines and imprisonment for knowingly submitting false,inaccurate,or incomplete information." IX. Certification —FACILITY OWNER/OPERATOR "I certify under the penalty of law: 1. That I have personally examined and am familiar with the information submitted in this document and all attachments, Signature of Responsible Official including the electronic data(i.e.load observations and quarterly comparative analysis)required in section VII,and that,based on Thomas Stanwood my inquiry of those individuals immediately responsible for Print Full Name obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant Facility Manager penalties both civil and criminal for submitting false information Title including possible fines and imprisonment. 2. That,in the event that this inspection report contains a 01/16/2023 recommendation for corrective action(s), I have completed and Date(MM/DD/YWY) attached to this report a Corrective Action Plan and Schedule*, pursuant to 310 CMR 19.018(8)(c)2." Pursuant to 310 CMR 19.018(8)(c), a copy of each third- *Note:The owner or operator may elect to correct deviations identified in the party inspection report shall be maintained at the facility in Third-Party Inspection Report in a manner that is different than that accordance with the requirements of 310 CMR 19.000. The recommended by the Third-Party Inspector,so long as the facility is owner and operator shall make third-party inspection reports brought back into compliance with applicable requirements. available to personnel or authorized representatives of the Department for review at the facility upon request. Within 30 days of • Mail this completed form to the MassDEP A list of municipalities and MassDEP the inspection Regional Office that serves the municipality in Regional Offices is available online at: date: which the facility is located. http://www.mass.gov/eea/agencies/massdep/ (Attention: Solid Waste Management) about/contacts/find-the-massdep-regional- office-for-your-city-or-town.html • Send one copy to the local board of health for the municipality in which the facility is located. Third-Party Inspection Report(Waste Ban) Page 7 of 7