Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. e D Lot ig Zone of Contribution: In Out Acreage S a Z Commercial: Residential: '' Street: e s Y.„..i�� -- Village: Floor Plan: 7. # Bedrooms: 3 Owner: Installer: C R? C`,,e,( �e pl e c Address: Phone: Phone: Builder: Engineer: l aj e',e- 4)0 i--GC I Address: Phone: Phone: N/A YES NO 1. Required#of copies received �;// 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table -- 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.:6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: , ' 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v - 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: 1 .�, 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` i . 15. System not in top or subsoil (A,B horizons)or 5'removal t ' 16. Proposed contours are suitable / 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 441 - / 22. System adequately sized for its intended use f 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade I T / 25. Inspection port on plastic chambers/leach field f 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size fj' 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking . 30. Buoyancy calculations for tank/pump chamber \ / - ' 31. Engineer to inspect and certify V P fy soils: wall: commercial: eG/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature L/ 33.H-20 loading is subject to vehicular traffic,groundwater `� 34.Title V Application and permit fee, installer signature V 35. Foundation footing min.2 feet above adjusted ground water for new house ;/ 36.Deed Restriction required max. #bedrooms: max. flow: gpd I 37. Check area lots for groundwater/Label groundwater in Assessor's Map I v I Plan reviewed by: J cool