HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. e D Lot ig Zone of Contribution: In Out Acreage S a Z
Commercial: Residential: ''
Street: e s Y.„..i�� --
Village: Floor Plan: 7. # Bedrooms: 3
Owner: Installer: C R? C`,,e,( �e pl e c
Address: Phone:
Phone:
Builder: Engineer: l aj e',e- 4)0 i--GC I
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received �;//
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table --
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: , '
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v -
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: 1 .�,
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` i .
15. System not in top or subsoil (A,B horizons)or 5'removal t '
16. Proposed contours are suitable /
17. System meets slope requirements-min. 1/8", %"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal 441
- /
22. System adequately sized for its intended use f
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade I T /
25. Inspection port on plastic chambers/leach field f
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size fj'
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking .
30. Buoyancy calculations for tank/pump chamber \ / - '
31. Engineer to inspect and certify V
P fy soils: wall: commercial: eG/
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature L/
33.H-20 loading is subject to vehicular traffic,groundwater `�
34.Title V Application and permit fee, installer signature V
35. Foundation footing min.2 feet above adjusted ground water for new house ;/
36.Deed Restriction required max. #bedrooms: max. flow: gpd I
37. Check area lots for groundwater/Label groundwater in Assessor's Map I v I
Plan reviewed by: J
cool