Loading...
HomeMy WebLinkAbout210060 - Affidavit - ArchitecturalInitial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 10 Project Title: Dennis-Yarmouth Date: 02/09/2023 Permit No. BLD-21-006153 Intermediate/Middle School Property Address: 286 Station Avenue, Yarmouth, MA 02664 Project: Check (x) one or both as applicable: New construction X Existing Construction Project description: Construction of a new Elementary school and associated sitework I, Daniel T. Colli, MA Registration Number: 20764 Expiration date: 8/31/23, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning1: XX Architectural Structural Mechanical Fire Protection Electrical Other: Describe For the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1.Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2.Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3.Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’. Enter in the space to the right a “wet” or electronic signature and seal: Phone number: 617-712-2151 Email: d.colli@perkinseastman.com Version 01_01_2018 Date: Permit No.: Building Official Name: Building Official Use Only