Loading...
HomeMy WebLinkAboutReview Checklist _ TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM / S / LOT A Date of Subdivision Approval Street / ��� �' Zone of Contribution: In Out Village /50-1; Commercial Residential Owner: ppy1/l .ilA (_ Installer_______22 /3sf D/I ,G1 ,. !V S• ZCttGec2 �1r�a z Builder: ? Engineer ) 7 � ) --r /9/ N/A YES NO 1. Required number of copies received. . 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. , 1/ 5. Water availability letter from Water Department for new construction. v" 6. Benchmark indicated and shown-NGVD if near wetlands, ,/ 7. Building sewer does not exit center of house. %,- 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. ../ 11 Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells 12, System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater, 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit, 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 17. System meets slope requirements - init. 1/8", 1/4" preferred, 1----`-- 18. System meets breakout requirements-peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10,000 apd for parcel. j 21. No garbage disposal. 22. System adequately sized for its intended use, 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 1 t 24. Manhole covers within 6" of grade - septic tank and pump chamber. / t/ 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. L 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under dri way or parking. tY 29. Engineer to inspect and certify ; a. clay removal 7 b. wall construction schedule c. commercial system _� ..e____ 30. Engineer and Land Surveyor stamp and signature. ;/ 31. H2O loading when system subject to vehicular traffic, 32, Title V application and fee signed by a licensed installer, 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: A