HomeMy WebLinkAbout23-E012 19 Cranberry Lane ApprovedREEc
FEB 14 207?
TOWN OF YARMOUTH
1146 ROUTE 28, SOUTH YARMOUTH, MA 02664-4451
Telephone (508) 398-2231 Ext. 1292-Fax (508) 398-0836
3 %hFE 41
KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
APPLICATION FOR
CERTIFICATE OF EXEMPTION
Application is hereby made for the issuance of a Certificate of Exemption under Sections 6 and 7 of Chapter 470 of
Acts of 1973, as amended, for the proposed work as described below and on plans, drawings, or photographs
accompanying this application.
Type or print legibly: /�
/ y ,s-! o v
Address of proposed work: /I Y 4► e � Map/Lot # - Qq
Owner � -ti e Phone #:
All applications must be submitted by owner or accompanied by letter from own pproving submittal of application.
Mailing address: C!'n1h �YA"X 1a17c �? r /�O U � Year built:
Email: �n� If ��Y YW� f7 10VI a) IbU^ Preferred notification method: Phone Email
AaentlContractor:
Mailing Address:
Email:
Phone #:
Preferred notification method: Phone Email
Description of Proposed Work (Additional pares may be attached if necessary):
� (/yj 6FtW':'+ �Cd X 01 6h-e'A ' V^ r-e"Ir
,..,YO Signed (Owner or agent): Y [.,i 1.]) ✓ ^ 1 rjrYL Date:
➢ Owner/contractor/agent is aware that a permit may be required from the Buitding Department. (Check other departments, also.)
This certificate is good for one year from approval date or Upon date of expiration of Building Permit, whichever date shalt be later.
For Committee use only:
Date: ; h 3
Amounty ��
CashlCK
Rcvd by.
Approved
Reason for denial:
Date Signed: 2111 P 3 Signed:
V5.2047
Approved with changes Denied
ri
APPLICATION #: g3
Sherman, Lisa
From: Richard Ventrone <rav9463@gmail.com>
Sent: Tuesday, February 14, 2023 9:48 AM
To: Sherman, Lisa
Subject: Re: 23-EO12 19 Cranberry Lane
Attachments: 23-EO12 19 Cranberry Lane.pdf
Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are
sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure.
Otherwise delete this email.
Approved. Thank you.
Richard A. Ventrone, Jr.
Yarmouth Port, Massachusetts
.2 3FE6.J-4F-H 7 pr
On Feb 14, 2023, at 9.01 AM, Sherman, Lisa <LSherman@yarmouth.ma.us> wrote:
Hi Rick,
Resident would like to construct a shed in the backyard of 19 Cranberry Lane.
Please let me know if you need any additional information.
Thanks Rick,
Lisa
Lisa Sherman
Town of Yarmouth
Administrator, Old King's Highway Historic District and Yarmouth Historical Commission
508-398-2231, ext. 1292
Isherman@yarmouth.ma.us
APPROV
FEB 14 2023
1 0 J ,roja
Sherman, Lisa
From: Danielle Marinho <dmarinho1982@icloud.com>
Sent: Monday, February 13, 2023 3:15 PM
To: Sherman, Lisa
Subject: Ezio Marinho Shed permit
Attention!: This email originates outside of the organization. Do not open attachments or click
links unless you are sure this email is from a known sender and you know the content is safe.
Call the sender to verify if unsure. Otherwise delete this email.
Hi Lisa
Thank you for your help this morning with the shed application. The dimensions are 8' x 12'.
Please let me know if you need anything else.
Danielle and Ezio Marinho
Sent from my iPhone
E 1VED
FEB 14 2023
YANVIUUTh
I
APPRNED
FEB 14 2023
YAHM'Uu-I r,
�a a TOWN OF YARMOUTH
1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-4451
In Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836
OLD ICING'S HIGHWAY HISTORIC DISTRICT COABHTTEE
WAIVER OF 45-DAY DETERMINATION
The applicant/applicant's agent understands and agrees that due to the current declared National
and State public health emergencies the determination of our Application for a Certificate of
Appropriateness/Demolition/Exemption may not be made within 45 days of the filing of such
application.
The applicant agrees to extend the time frame within which a determination is to be made as
required by the Old King's Highway Regional Historic District Act.
SECTION 9 -Meetings, Hearings, Tine for Making Determinations
"As soon as convenient after such public hearing; but in any event ~Within forty-five (45) days
after the.filing of application, or within such filrther time as the applicant shall allow in writing,
the Committee shall make a determination on the application. "
Applicant understands that the review of this application will be scheduled as soon as the
situation allows.
Applicant/Agent Name (please prin��'i►y 71.; Y�
X Applicant/Agent signature: _ Date:
R E M ED
FEB 14 2023
YAHIVIOU i r,
312020
i 0 s
r
FEB 14 2023
`(ARM0U-ri-i
Application #:` — C-003
n
cV
CV
NEW CABANA
r
8,3, 32
1 S� 8s-
Lfr32' INGROUND POOLTUB .91
N
u7
ECEIVED
FEB 14 2023
YAYINIUU r r,
202.62'
134. 0Q
APPROVED
FEB 14 2023
fAHMOUTH
OLD KING'S HIGHWAY
Z
POOL
A SB UIL T PLAN
IW6LU 109-37.1
of xA
19 CRANBERRY LANE
I CER7IFY THAT THE IMPROVEMENTS SHOWN
? °yo
YARMOUTK MA
HAVE BEEN LOCATED BY A FIELD SURVEY.
ROBB `"�
o SYKES
DACE: 10-z6—z02z
BRAWN: ROS
J. S962
No. 3541a c—n
SCALE: 1"=50'
DWG. Cpp
0 PF �0 Sao
� sT�
EASTBOUND
LAND SURVEYING, INC.
-26-2�22
�0N1r LAP s�
P.O. 80X 442
FORESTDALE, MA 02644
ROBE SYKES P.LS. DA TE
508-477-4511
g3._Eap-
ij
...... . . . . . . . .
K6K
jo
M.
ol