HomeMy WebLinkAbout01 Stormwater PlansDrawing Index C.2.8 –Clearing, Demolition & Perimeter Erosion Control Plan -1 C.2.9 –Clearing,Demolition & Perimeter Erosion Control Plan -2 C.7.6 –Site Details –6 C.6.1 –Grading & Drainage –1 C.6.2 –Grading & Drainage –2 C.6.3 –Grading & Drainage Enlargement –1 C.6.4 –Grading & Drainage Enlargement –2 C.6.5 –Grading & Drainage Enlargement –3 C.6.6 –Drainage Details –1 C.6.7 –Drainage Details –2 C.6.8 –Drainage Details –3 APPENDIX A –SITE PLANS LOCATION MAP1" = 250' - 0"TOWN OF YARMOUTH, MASSACHUSETTSYARMOUTH RIVERWALK PARKSTORMWATER MANAGEMENT PERMITAPPLICATION - PLAN SETNOVEMBER 2022ProjectLocationPLAN INDEXDESCRIPTIONSHEET NO.G.1G.2G.3C.1.1 - C.1.2C1.3 - C1.4C.1.3 - C.1.9C.2.1 - C.2.7C.3.1 - C.3.2C.3.3C.3.4C4.3C4.4C.5.1 - C.5.2C.5.3 - C.5.4C.6.1 - C.6.5U.1.1U.2.0U.3.0C.7.1 , C.7.6C.7.7C.7.8 - C.7.10A.1 - A.3P.0.1-P.1.0H.0.1E.0.1-E2.2S.1.1S.1.2-S.1.4S.2.1-S.2.4S.2.5S.2.6S.2.7L1.1 - L1.2L1.3 - L1.13L.2.1U.1.1TOWN OF YARMOUTH1146 ROUTE 28SOUTH YARMOUTH, MA 02664TOWN ADMINISTRATORROBERT L. WHRITENOUR, JR.ROUTE 28PREPARED BY:ISSUE DATE: 11/17/2022PROJECT LOCATIONCOVERGENERAL NOTESLEGEND AND ABBREVIATIONSEXIST CONDITIONS PLAN 1-2EXISTING CONDITIONS & SITE PREPARATION PLAN 1-2EXISTING CONDITIONS PLAN - 1-7 OMITTEDSITE PLAN PREPARATION PLAN - 1-7OMITTEDRIVERFRONT AREA IMPACT PLAN - 1-2 OMITTEDSALT MARSH AREA IMPACT PLAN OMITTEDLAND SUBJECT TO COASTAL STORM FLOWAGE (LSCSF) IMPACT PLAN OMITTEDSITE SECTIONS - 1 OMITTEDSITE SECTIONS - 2 OMITTEDMATERIALS AND LAYOUT PLAN - 1-2ENLARGEMENTS - 1-2 OMITTEDGRADING & DRAINAGE PLANS 1-5SITE UTILITY PLANSITE UTILITY DETAILS OMITTEDRESTROOM PUMP CHAMBER - DETAIL OMITTEDSITE DETAILS - 1 & 6 OMITTEDEROSION CONTROL DETAILSDRAINAGE DETAILS - 1-3ARCHITECTURAL DRAWINGS OMITTEDPLUMBING DRAWINGS OMITTEDHVAC DRAWING OMITTEDELECTRICAL DRAWINGS OMITTEDOVERALL BOARDWALK PLAN OMITTEDBOARDWALK - PROFILE - 1-3 OMITTEDBOARDWALK - DETAILS - 1-4 OMITTEDBOARDWALK DETAILS - 5 - PEDESTRIAN BRIDGE OMITTEDBOARDWALK DETAILS - 6 - KAYAK LAUNCH EXISTING CONDITIONS OMITTEDBOARDWALK DETAILS - 7 - KAYAK LAUNCH OMITTEDPLANTING PLAN OVERALL - 1-2 OMITTEDPLANTING DETAIL AREAS 1-10 OMITTEDPLANTING DETAILS - 1 OMITTEDSITE UTILITY PLAN - 1PARKERS RIVERREGISTERED PROFESSIONALDATE11/17/2022CRITICAL ELEVATIONS HIGH TIDE LINE (HTL) - ELEV. 2.91 MEAN HIGH WATER (MHW) - ELEV. 2.05 MEAN LOW WATER (MLW) - ELEV. -0.7 LOWEST ASTRONOMICAL TIDE (LAT) - ELEV. X.XX*DATA SOURCED FROM NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION(NOAA)LIMIT OF VILLAGECENTER OVERLAY DISTRICTNANTUCKET SOUNDUNDERLYING ZONING MAPSCALE: NOT TO SCALEMA-ROUTE 28ZONE R-25LIMIT OF HOTEL/MOTELOVERLAY DISTRICT (HMOD1)ZONE B2 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP/ALG For Review Only NONE AWG AWG REGISTERED PROFESSIONAL PERMITTING REGISTERED PROFESSIONAL 11/10/2022 GENERAL NOTES G.2 GENERAL NOTES: 1.ALL WORK SHALL CONFORM TO THE MASSACHUSETTS STATE BUILDING CODE AND ITS APPLICABLE REFERENCED STANDARDS. 2.IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS AS THEY RELATE TO NEW CONSTRUCTION. REPORT TO THE OWNER'S REPRESENTATIVE ALL OBSERVATIONS AND ANY DISCREPANCIES BEFORE PROCEEDING WITH WORK. 3.WORK WITHIN THE LOCAL RIGHT-OF-WAY SHALL CONFORM TO LOCAL MUNICIPAL STANDARDS. WORK WITHIN THE STATE RIGHT-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF THE STATE HIGHWAY DEPARTMENTS STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES. 4.CONTRACTOR SHALL NOTIFY "DIG-SAFE"(1-888-344-7233) AT LEAST 72 HOURS BEFORE EXCAVATING. THE CONTRACTOR SHALL RECORD THE LOCATION OF ANY/ALL DIG-SAFE UTILITY MARKINGS ON PROJECT RECORD DOCUMENTS. 5.THE LOCATION, SIZE, AND MATERIAL OF EXISTING UTILITIES ARE SHOWN AS APPROXIMATE REPRESENTATIONS ONLY. THE OWNER OR ITS REPRESENTATIVE HAVE NOT INDEPENDENTLY VERIFIED THIS INFORMATION. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES THAT MAY BE PRESENT. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF THE POINTS OF CONNECTIONS TO EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES WITHIN PROJECT LIMITS AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHT-OF-WAY. 6.THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGE TO ALL UTILITIES (BOTH ABOVE AND BELOW GRADE) WITHIN THE PROJECT AREA. DAMAGE TO ANY UTILITIES AS A RESULT OF ACTIONS BY THE CONTRACTOR SHALL BE RESTORED BY THE CONTRACTOR, AT THE CONTRACTOR'S EXPENSE, TO CONDITIONS EQUAL TO CONDITIONS PRIOR TO THE DAMAGE. 7.UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED ON DRAWINGS, IN THE SPECIFICATIONS, AND IN THE CONTRACT DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT APPROPRIATE PERMITS. 8.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. 9.THE CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE FOR CLEAN-UP, REPAIRS, AND CORRECTIVE ACTION IF SUCH OCCURS. 10.DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 11.ANY DAMAGE TO EXISTING PAVEMENT, BRIDGES, SIDEWALKS, FENCES, ETC. CAUSED BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 12.TOPOGRAPHIC SURVEY IS BASED ON AN ON-THE-GROUND SURVEY PERFORMED BY ALPHA SURVEY GROUP, LLC BETWEEN MARCH 7 & APRIL 3, 2017 AND BETWEEN AUGUST 9 & AUGUST 12, 2021. 13.THE PROJECT IS HORIZONTALLY REFERENCED TO THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), CORS ADJUSTMENT (NA2011/GEOID 12a) AS DETERMINED BY REDUNDANT GPS OBSERVATIONS MADE ON MARCH 7, 2017. 14.THIS PROJECT IS VERTICALLY REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), BASED ON THE FOLLOWING BENCHMARKS: MASSDOT BM#8149 BRASS RIVET IN PARKER RIVER BRIDGE WITH A PUBLISHED ELEVATION OF 6.11 FT.; CB/TOWN OF YARMOUTH DISK STATION NO. 8, ELEV.= 5.20 FT; CHISELED SQUARE ON N.E. CORNER OF PARKER RIVER CONC. BRIDGE WALL ELEV.=6.18 FT. (LOUIS BERGER DRAINAGE & UTILITY PLAN 75% DESIGN SHEET 8 OF 20 YARMOUTH MAIN STREET (RTE. 28) PROJECT). 15.LAND OUTSIDE THE PROPOSED LIMIT OF WORK SHALL NOT BE DISTURBED BY THE CONTRACTOR. 16.ALL WORK AND MATERIALS SHALL COMPLY WITH ALL TOWN OF YARMOUTH REGULATIONS AND CODES AND O.S.H.A. STANDARDS. 17.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING AND MAINTAINING ALL CONTROL POINTS AND BENCH MARKS NECESSARY FOR THE WORK. 18.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND PAYING FOR ANY PERMITS AND/OR CONNECTION FEES REQUIRED TO CARRY OUT THE WORK INCLUDING BUT NOT LIMITED TO DEMOLITION. 19.ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. 20.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OF RELOCATIONS THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE DRAWINGS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETS. AS REQUIRED. ALL COSTS SHALL BE BORNE BY THE CONTRACTOR. CONSTRUCTION NOTES: 1.THE CONTRACTOR SHALL CALL "DIG-SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO EXCAVATION IN ACCORDANCE WITH STATE OF MASSACHUSETTS, GENERAL LAWS. 2.THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE AGENCIES AND UTILITY COMPANIES IN WRITING 48 HOURS PRIOR TO ANY CONSTRUCTION WITHIN 15 FEET OF A UTILITY LINE. 3.THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL SAFETY CODES, REGULATIONS, LEGAL REQUIREMENTS, PERMIT CONDITIONS, ETS. 4.THE CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT ALL WALKS, STREETS, PAVEMENTS, HIGHWAY GUARDS, CURBING, EDGING, TREES AND PLANTINGS ON OR OF THE PREMISES, AND SHALL REPAIR AND REPLACE OR OTHERWISE MAKE GOOD AT HIS/HER OWN EXPENSE AS DIRECTED BY THE ENGINEER ANY ITEMS DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK. 5.THE CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND SHORING OF ALL EXCAVATIONS IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING CODES AND REGULATIONS. 6.ALL SURFACES OUTSIDE THE LIMIT OF WORK THAT ARE DISTURBED SHALL BE RESTORED TO THEIR ORIGINAL CONDITION, AS DETAILED, OR AS SPECIFIED BY THE ENGINEER. 7.ALL EXISTING PIPING AND STRUCTURES EXPOSED DURING EXCAVATION SHALL BE ADEQUATELY SUPPORTED, BRACED, OR OTHERWISE PROTECTED DURING CONSTRUCTION ACTIVITIES. 8.WHERE NEW PAVEMENT MEETS EXISTING PAVEMENT (INCLUDING DRIVEWAYS), SAW CUT EXISTING PAVEMENT SMOOTH AND STRAIGHT. WHERE NEW BITUMINOUS CONCRETE MEETS EXISTING BITUMINOUS CONCRETE SURFACES, SAW CUT EDGES ARE TO BE SEALED WITH BITUMEN AND BACK SANDED. 9.WORK WITHIN PUBLIC WAYS SHALL COMPLY WITH APPLICABLE MUNICIPAL AND STATE REQUIREMENTS. 10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 11.THE CONTRACTOR SHALL RE-USE EXISTING GRANITE CURB IN GOOD CONDITION THAT IS RECOVERED FROM DEMOLITION ACTIVITIES. SITE PREPARATION & DEMOLITION NOTES: 1.ALL ITEMS DESIGNATED TO BE REMOVED AND DISPOSED (R&D) SHALL BE TAKEN FROM THE SITE AND LEGALLY DISPOSED. 2.ALL ITEMS DESIGNATED TO BE REMOVED AND STOCKPILED (R&S) SHALL BE DISASSEMBLED AND STOCKPILED AT A LOCATION DETERMINED BY THE OWNER'S REPRESENTATIVE. 3.DEBRIS OF ANY NATURE SHALL NOT BE ALLOWED TO ACCUMULATE IN THE STREETS, PARKING LOT, SIDEWALK AREAS OR GROUNDS SURROUNDING THE PROJECT AREA. 4.FOR ALL HOLES, PITS OR OTHER HAZARDOUS DEPRESSIONS ADJACENT TO OR WITHIN EIGHT (8) FEET OF ANY SIDEWALK AREA AND ARE UNPROTECTED, A TEMPORARY GUARD FENCE SHALL BE IMMEDIATELY ERECTED FOR THE PROTECTION OF PEDESTRIANS. THE FENCING MATERIAL SHALL BE FREE FROM NAILS, FASTENINGS OR SPLINTERS AND SHALL PRESENT A REASONABLY SMOOTH SURFACE ON THE SIDES OF POSSIBLE CONTACT. SUCH TEMPORARY FENCES SHALL BE LEFT IN PLACE AND SHALL BE PROPERLY MAINTAINED UNTIL THE HOLES, PITS OR DEPRESSIONS HAVE BEEN PROPERLY FILLED. 5.ALL STUMPS AND ROOTS OF TREE AND SHRUBS INDICATED TO BE REMOVED AND DISPOSED SHALL BE LEGALLY DISPOSED OF OFF SITE. IN SPECIFIC LOCATIONS, STUMPS MAY BE GROUND IN PLACE, AS SHOWN. 6.ALL EXISTING VEGETATION (TREES, SHRUBS, GRASSES, ETC.) TO REMAIN SHALL BE PROTECTED FROM INJURY. INDIVIDUAL TREES AND SHRUBS TO BE SAVED WITHIN THE DESIGNATED WORK AREA SHALL BE PROTECTED AS SPECIFIED HEREIN. THE CONTRACTOR SHALL REMOVE ALL PROTECTIVE BARRIERS ONLY AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 7.THE CONTRACTOR SHALL STRIP AND STOCKPILE EXISTING LOAM FROM THOSE AREAS WHICH ARE TO BE EXCAVATED OR FILLED. STOCKPILED LOAM SHALL NOT BE MIXED WITH ANY SUBSOIL OR OTHER UNSUITABLE MATERIAL UNLESS DIRECTED BY THE OWNER'S REPRESENTATIVE. ALL STOCKPILED LOAM REMAINS THE PROPERTY OF THE OWNER. 8.ALL STOCKPILED LOAM OR OTHER SOIL MATERIAL SHALL BE SURROUNDED BY EROSION CONTROL DEVICES. 9.THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE SITE CLEAN OF MISCELLANEOUS DEBRIS THROUGHOUT THE CONSTRUCTION PERIOD. ALL WASTE MATERIALS SHALL BE DISPOSED OF IMMEDIATELY TO A LEGAL, OFF-SITE LOCATION UNLESS OTHERWISE INDICATED ON THE PLAN. 10.DURING THE DEMOLITION PROCESS THE CONTRACTOR SHALL USE SUFFICIENT WATER OR NON-SALVABLE MATERIALS TO PREVENT EXCESSIVE SPREADING OF DUST DURING OPERATIONS. 11.THE REMOVAL AND DISPOSAL OF ALL MATERIALS SHALL BE DONE IN ACCORDANCE WITH THE APPROPRIATE STATE AND TOWN ORDINANCES, RULES AND REGULATIONS. 12.UNVEGETATED SLOPES SHALL NOT BE UNATTENDED OR EXPOSED FOR PERIODS IN EXCESS OF TWO (2) WEEKS OR THROUGH THE INACTIVE WINTER SEASON. 13.ALL SIDEWALK AND DRIVEWAYS DESIGNATED FOR REPLACEMENT SHALL BE CUT AND MATCHED AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 14.PRUNING STANDARDS: 14.A.PRUNE TREE ACCORDING TO ANSI A300. 14.B.EXPERIENCED WORKMEN UNDER THE IMMEDIATE SUPERVISION OF A LICENSED ARBORIST SHALL PERFORM ALL TREE TRIMMING. 14.C.CLIMBING IRONS OR OTHER EQUIPMENT INJURIOUS TO TREES SHALL NOT BE PERMITTED. 14.D.CUT BRANCHES WITH SHARP PRUNING INSTRUMENTS; DO NOT BREAK OR CHOP. 14.E.PRUNE TREES TO REMAIN THAT ARE AFFECTED BY TEMPORARY AND PERMANENT CONSTRUCTION. 14.F.ALL DOWNED AND CUT PLANT MATERIAL TOGETHER WITH MISCELLANEOUS DEBRIS FROM THIS WORK SHALL BE REMOVED BY THE CONTRACTOR FROM THE PROJECT ON A DAILY BASIS. MATERIALS FROM THE WORK WILL NOT BE PERMITTED TO REMAIN ON SITE RESULTING IN DELAYING OR IMPEDING OTHER WORK ON PROJECT SITE. 14.G.NO MATERIAL OR DEBRIS SHALL BE DUMPED WITHIN THE LIMITS OF THE SITE OR ABUTTING PROPERTY. SOIL EROSION AND SEDIMENTATION CONTROL NOTES: 1.ALL REFERENCED SOIL EROSION AND SEDIMENTATION CONTROLS INCLUDING MATERIALS USE, APPLICATION RATES, AND THE INSTALLATION PROCEDURES SHALL BE PERFORMED IN ACCORDANCE WITH THE MASSACHUSETTS DEP SPECIFICATIONS. 2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN ALL SOIL EROSION AND SEDIMENT CONTROLS ON THE PROJECT FOR THE ENTIRE DURATION OF THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL FOLLOW THE DIRECTION OF THE OWNER'S REPRESENTATIVE WITH REGARD TO INSTALLATION, MAINTENANCE, AND REPAIR OF ALL SOIL EROSION AND SEDIMENTATION CONTROLS ON THE PROJECT SITE. TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROLS (HAY BALES, SILT FENCE, ETC.) SHALL BE MAINTAINED UNTIL ALL EXPOSED SOILS ARE SATISFACTORILY STABILIZED. 3.THE HAY BALE / SILT FENCE LINE ILLUSTRATED ON THESE PLANS, IS TO BE STAKED IN THE FIELD PRIOR TO CONSTRUCTION AND SHALL SERVE AS THE STRICT LIMIT OF DISTURBANCE FOR THE PROJECT. NO ALTERATIONS, INCLUDING VEGETATIVE CLEARING OR SURFACE DISTURBANCE, SHALL OCCUR BEYOND THE HAY BALE / SILT FENCE LINE. 4.SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN TWENTY-FOUR (24) HOURS AFTER AN EVENT WHICH GENERATES .25 INCHES OF RAIN IN A TWENTY-FOUR (24) HOUR PERIOD. MAINTENANCE SHALL INCLUDE CLEAN OUT OF ACCUMULATED SEDIMENT BEHIND THE BALES IF 12 THE ORIGINAL HEIGHT OF THE BALES / FENCE BARRIER BECOMES FILLED WITH SEDIMENT. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE HAS BEEN REMOVED SHOULD BE ADDRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED, AND SEEDED. 5.THE TOE OF ANY FILL SLOPE IS TO REMAIN AT LEAST ONE (1) FOOT INSIDE OF ALL EROSION CONTROLS. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR COVER ANY PORTION OF THE EROSION CONTROLS WITH FILL MATERIAL. ANY FILL MATERIAL WHICH IS PLACED ON ANY EROSION CONTROLS BY THE CONTRACTOR, SHALL BE IMMEDIATELY REMOVED BY THE CONTRACTOR, AND ANY NECESSARY REPAIRS TO THE EROSION CONTROLS ACCOMPLISHED, AT NO COST TO THE OWNER. 6.THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL DEVICES FOR OUTLET PROTECTION PRIOR TO CLEANING AND FLUSHING STORM WATER DRAINAGE. EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL ALL FLUSHED SEDIMENTS ARE REMOVED. AT ALL OUTFALL LOCATIONS WHERE PIPES ARE TO BE CLEANED AND FLUSHED, OUTLET PROTECTION SHALL BE INSTALLED TO TRAP SEDIMENTS. THESE SEDIMENTS SHALL THEN BE REMOVED AND DISPOSED OF LEGALLY BEFORE THE OUTLET PROTECTION DEVICES ARE REMOVED. IF OUTLET PROTECTION AT THE OUTFALL IS NOT FEASIBLE, THEN THE OUTLET PIPE OF THE LAST DRAINAGE STRUCTURE TO BE CLEANED SHALL BE PLUGGED TO CAPTURE ALL MATERIALS FLUSHED FROM PIPES. AFTER THE MATERIALS ARE REMOVED FROM THE DRAINAGE STRUCTURES, THE OUTLET SHALL BE UNPLUGGED TO RESUME NORMAL FUNCTIONING. CRITICAL ELEVATIONS HIGH TIDE LINE (HTL) - ELEV. 2.91 MEAN HIGH WATER (MHW) - ELEV. 2.05 MEAN LOW WATER (MLW) - ELEV. -0.7 LOWEST ASTRONOMICAL TIDE (LAT) - ELEV. X.XX *DATA SOURCED FROM NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) 11/17/2022 TP-1 B-1 SCHOOL ZONE - WHITE HANDICAP SYMBOL - WHITE BND CB TMH WMH EMH PROPOSED GG WG CS EXISTING GENERAL SYMBOLS v v v v 2+00 v v v v CURB OR BERM (TYPE AS NOTED) EDGE OF PAVEMENT CATCH BASIN (OR GUTTER INLET, LEACHING BASIN, DROP INLET, CATCH BASIN CURB INLET) ELECTRIC HANDHOLE (NUMBER AS NOTED) ELECTRIC MANHOLE TELEPHONE MANHOLE WATER MANHOLE SEWER MANHOLE DRAINAGE MANHOLE GAS GATE WATER GATE CURB STOP HYDRANT FIRE ALARM BOX PARKING METER STREET LIGHT POLE UTILITY POLE UTILITY POLE w/ LIGHT SIGN GUY POLE DRAIN PIPE (SIZE AS NOTED) SEWER MAIN (SIZE AS NOTED) ELECTRIC DUCT GAS MAIN (SIZE AS NOTED) WATER MAIN (SIZE AS NOTED) TELEPHONE DUCT (SIZE AS NOTED) OVERHEAD WIRE MAIL BOX WOOD GUARD RAIL STEEL BEAM GUARD, WOOD OR STEEL POSTS (TYPE AS NOTED) STEEL GUARD RAIL, STEEL POSTS (TYPE NOTED) STONE WALL RETAINING WALL (TYPE NOTED) HIGHWAY/PROPERTY BOUND (TYPE AS NOTED) STATE HIGHWAY LAYOUT LINE (SHLO) CITY, TOWN OR COUNTY LAYOUT LINE (R.O.W.) CITY, TOWN, COUNTY OR STATE BOUNDARY LINE PROPERTY LINE EASEMENT LINE (TYPE NOTED) CONSTRUCTION BASELINE SURVEY LINE RAILROAD OR STREET RAILWAY TRACKS WITH SIDELINES WHEELCHAIR RAMP TREE (SIZE AND TYPE AS NOTED) HEDGE/SHRUBS FENCE (SIZE AND TYPE AS NOTED) EDGE OF WETLAND W/ FLAGGED NUMBER EDGE OF RIVER/STREAM LINE 100-FT. WETLAND BUFFER LIMIT 100-FT. RIVER FRONT LIMIT 200-FT. RIVER FRONT LIMIT WOODED AREA / LIMIT OF CLEARING SPOT GRADE SAW CUT LINE TEST PIT BORING PROPOSED SIGNING SYMBOLS PAVEMENT MARKINGS AND PAVEMENT ARROW - WHITE LEGEND "ONLY" - WHITE DWLEx SYEL BYCL BWLL SWEL SL CW ABBREVIATIONS TRAFFIC SIGNAL SYMBOLS PROPOSED LEGEND ONLY CONTROL CABINET GROUND MOUNTED WITH FOUNDATION CONTROL CABINET POLE MOUNTED CONTROLLER PHASE MAST ARM, SHAFT & BASE (ARM LENGTH AS NOTED) VEHICULAR SIGNAL HEAD (ALPHA-NUMERIC DESIGNATION AS NOTED) VEHICULAR SIGNAL HEAD, OPTICALLY PROGRAMMED VEHICULAR SIGNAL HEAD (REMOVED & RESET) FLASHING BEACON PEDESTRIAN SIGNAL HEAD PEDESTRIAN SIGNAL HEAD, OPTICALLY PROGRAMMED PULL BOX 12"x12" OR HANDHOLE LOOP DETECTOR PEDESTRIAN PUSH BUTTON, SIGN (DIRECTIONAL ARROW AS SHOWN) AND SADDLE PRE-EMPTION DETECTOR PRE-EMPTION CONFIRMATION STROBE SIGNAL CONDUIT (SINGLE RUN) SIGNAL CONDUIT (DOUBLE RUN) SIGNAL POST & BASE MAGNETIC DETECTOR SCHOOL ZONE SPEED LIMIT SIGN MICROWAVE OR ULTRASONIC DETECTOR VIDEO DETECTION CAMERA VIDEO DETECTION ZONE MA-1 CROSSWALK, 2 - 12" WHITE LINES (8" WIDTH) STOP LINE - 12" WHITE LINE 4' BEHIND CW (TYP.) SOLID WHITE EDGE LINE - 4" SOLID WHITE CHANNELIZING LINES - 12" (SPACING NOTED) SOLID WHITE GORE LINE 12" @ 33°, (SPACING NOTED) SOLID WHITE LANE LINE - 4" SOLID WHITE PARKING LINE - 4" BROKEN WHITE LANE LINE - 4" DOTTED WHITE LANE EXTENSION LINE - 4" (2' LINE & 6' GAP) DOTTED YELLOW LANE EXTENSION LINE - 4" (2' LINE & 6' GAP) BROKEN YELLOW CENTERLINE - 4" DOUBLE YELLOW CENTERLINE - 2 - 4" LINES SOLID YELLOW EDGE LINE - 4" SOLID YELLOW GORE LINE 12" @ 33°, (SPACING NOTED) SOLID YELLOW LANE LINE - 4" SOLID YELLOW CYCLE TRACK EDGE LINE - 4" DOTTED YELLOW CYCLE TRACK CENTERLINE - 4" (3' LINE & 9' GAP) SWLL SWCHL SWGL SWPL DYCL SYGL SYLL EXISTING FAB PM GUY EHH x 00.00 TRAFFIC SIGNAL SYSTEMS STEADY CIRCULAR RED STEADY CIRCULAR AMBER STEADY CIRCULAR GREEN FLASHING CIRCULAR RED FLASHING CIRCULAR AMBER FLASHING YELLOW LEFT ARROW STEADY RED RIGHT ARROW STEADY AMBER RIGHT ARROW STEADY GREEN RIGHT ARROW STEADY RED LEFT ARROW STEADY AMBER LEFT ARROW STEADY GREEN LEFT ARROW STEADY WALK (PERSON WALKING) - LUNAR WHITE STEADY DON'T WALK (HAND) - PORTLAND ORANGE FLASHING DON'T WALK (FLASHING HAND) - PORTLAND ORANGE 10'-12" RCP 10'-8" PVC 10'-4" HP 10'-8" DI R Y G FR FY ¬FY R→ Y→ G→ ¬R ¬Y ¬G W DW FDW UTILITIES ACCMP ASPHALT COATED CORRUGATED METAL PIPE CAP CORRUGATED ALUMINUM PIPE CB CATCH BASIN CBCI CATCH BASIN WITH CURB INLET CI CURB INLET CIP CAST IRON PIPE CIT CHANGE IN TYPE CMP CORRUGATED METAL PIPE C CONDUIT CPP CORRUGATED PLASTIC PIPE CSP CORRUGATED STEEL PIPE DI DROP INLET DIP DUCTILE IRON PIPE F&C FRAME AND COVER F&G FRAME AND GRATE FM FORCE MAIN GI GUTTER INLET GIP GALVANIZED IRON PIPE GG GAS GATE HDW HEADWALL HYD. HYDRANT INV.INVERT ELEVATION LP LIGHT POLE MH MANHOLE PVC POLY-VINYL-CHLORIDE PIPE PWW PAVED WATER WAY RCP REINFORCED CONCRETE PIPE (CLASS III UNLESS NOTED) SD SUBDRAIN SMH SEWER MANHOLE TS TRAFFIC SIGNAL TSV&B TAPPING SLEEVE, VALVE AND BOX UP UTILITY POLE UPL UTILITY POLE w/ LIGHT UPT UTILITY POLE w/ TRANSFORMER VCP VITRIFIED CLAY PIPE WIP WROUGHT IRON PIPE WG WATER GATE WM WATER METER/WATER MAIN ABAN. ABANDON ADJ. ADJUST ALT. ALTERATION APPROX. APPROXIMATE B BASELINE B.B. BITUMINOUS BERM B.C. BITUMINOUS CURB BD OR BND BOUND BLDG. BUILDING B.O. BY OTHERS BOS BOTTOM OF SLOPE BOW BOTTOM OF WALL BSW BACK OF SIDEWALK C.C. CONCRETE CURB CEM. CEMENT CLF CHAIN LINK FENCE CONC. CONCRETE CONST. CONSTRUCTION CONT. CONTINUOUS DWY DRIVEWAY E.P., EOP EDGE OF PAVEMENT EL. ELEVATION ESMT. EASEMENT EXIST. EXISTING FDN. FOUNDATION GC GRANITE CURB HOR. HORIZONTAL IP IRON PIPE JCT JUNCTION LP LOW POINT MB MAIL BOX MHB MASSACHUSETTS HIGHWAY BOUND O.C. ON CENTER PERM. PERMANENT PGL PROFILE GRADE LINE PROP. PROPOSED PVC POINT OF VERTICAL CURVATURE PVMT. PAVEMENT R RADIUS OF CURVATURE R&D REMOVE AND DISCARD R&R REMOVE AND RESET R&S REMOVE AND STACK REM. REMOVE REMOD. REMODEL RET. RETAIN RR RAILROAD RT. RIGHT SB SOUTH BOUND OR STONE BOUND SDWK. SIDEWALK SHT. SHEET SHLD. SHOULDER STA. STATION TEMP. TEMPORARY TOS TOP OF SLOPE TOW TOP OF WALL TYP. TYPICAL VAR. VARIABLE VERT. VERTICAL VGC VERTICAL GRANITE CURB WCR WHEELCHAIR RAMP GENERAL Ø2 HH MM UP HYD DYLEx UPL MB EROSION CONTROL BARRIER/COMPOST FILTER TUBES GRAN. GRANITE L SYCTEL DYCTCL PCC POINT OF COMPOUND CURVATURE PC POINT OF CURVATURE PRC POINT OF REVERSE CURVATURE PI POINT OF INTERSECTION PT POINT OF TANGENCY PVC POINT OF VERTICAL CURVATURE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY OHW SMH DMH 10'-8" PVC 10'-8" PVC UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP/ALG For Review Only NONE AWG AWG REGISTERED PROFESSIONAL PERMITTING REGISTERED PROFESSIONAL 11/10/2022 LEGEND AND ABBREVIATIONS G.3 11/17/2022 NUNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 EXISTING CONDITIONS PLAN - 1 C.1.1 PARKER'S RIVER PARKER'S RIVER MA - ROUTE 2811/17/2022 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 EXISTING CONDITIONS PLAN - 2 C.1.2PARKER'S RIVER MARSH WOODED AREA WOODED AREA WOODED AREA 11/17/2022 NC.1.3 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 C.1.3 PROP. SILT FENCE (TYP.) PROP. EQUIPMENT STORAGE AREA AND EMPLOYEE PARKING, CLEANING & FUELING OF VEHICLES SHALL BE LIMITED TO THIS AREA PROP. TEMP.COMPOST FILTER TUBE CHECK DAMS PHASE I LIMIT LINE PHASE I LIMIT LINE PHASE I LIMIT LINE PROP. STAGING AREA FOR KAYAK LAUNCH PROP. SEDIMENT CONTROL DEVICE - COMPOST FILTER TUBE; SEE DETAIL (TYP.) PROP. SEDIMENT CONTROL DEVICE - COMPOST FILTER TUBE PROP. SEDIMENT CONTROL DEVICE - COMPOST FILTER TUBE; SEE DETAIL (TYP.) PROP. TEMP. SEDIMENT BASIN - PHASE II STORAGE VOLUME - 18,000 CUBIC FEET ACCESS TO EXIST. UPWELLER SITE SHALL BE MAINTAINED R&D EXIST. BIT. PAVEMENT CLEARING IN THIS AREA SHALL OCCUR IN PHASE II OF CONSTRUCTION PROP. LIMIT OF CLEARING (TYP.) PROP. STAGING AREA FOR BOARDWALK MATCHLINEPROP. 20'x50' CONSTRUCTION ENTRANCE TRACKING PAD TRACKING PADS TO REDUCE IMPACT OF CONSTRUCTION AREA PARKER'S RIVER PARKER'S RIVER MA - ROUTE 28PROP. SEDIMENT CONTROL DEVICE SHALL FOLLOW EXIST. VEGETATION LIMITS INITIAL FILL ZONE FOR PROP. RESTROOM FACILITY PROP TEMPORARY ACCESS ROAD TO STAGING AREAS - ELEV. 6.8± N/F TOWN OF YARMOUTH 669 ROUTE 28 ASSESS. MAP 32 PARCEL ID: 32/122 DEED BK 4985 PAGE 181 23.32 ACRES PROP. OVERFLOW FROM SEDIMENT BASIN TRACKING PADS TO REDUCE IMPACT OF CONSTRUCTION IN THIS AREA TEMP. SOILS (A&B) STOCKPILE LOCATION FLOATING SILT FENCE DUMPSTER FOR RESTROOM FACILITY CONSTRUCTION DEBRIS/WASTE EXISTING CONDITIONS & SITE PREPARATION PLAN - 1 11/17/2022 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 C.1.4 EXISTING CONDITIONS & SITE PREPARATION PLAN - 2 GENERAL NOTES: 1.OWNER / APPLICANT: TOWN OF YARMOUTH, 1146 ROUTE 28, YARMOUTH, MASSACHUSETTS 2.PREPARED BY: BETA GROUP, INC. 315 NORWOOD PARK SOUTH, 2ND FLOOR, NORWOOD, MASSACHUSETTS 02062. PHONE: 781-255-1982 SITE PREPARATION NOTES: 1.TOTAL FILL REQUIRED FOR SITE IMPROVEMENTS IS APPROXIMATELY 9,000 CY OF CLEAN SAND FILL. 2.EXISTING SOILS ON SITE ARE CLEAN SAND/LOAMY SAND. 3.ALL EXISTING A & B HORIZON SOILS REMOVED IN CONJUNCTION WITH EXCAVATION SHALL BE STOCKPILED IN STORAGE AREA FOR STORMWATER NOTES: 1.STORMWATER RUNOFF CALCULATIONS IN ACCORDANCE WITH THE REGULATIONS CAN BE FOUND IN THE STORMWATER REPORT, APPENDICES G & H. 2.THE ESTIMATED SEASONAL HIGH GROUNDWATER ELEVATION USING THE CAPE COD COMMISSION ADJUSTMENT METHOD IN AREAS TO BE USED FOR STORMWATER RETENTION, DETENTION AND INFILTRATION IS 2.0 FEET. THUS, ESTIMATED SEASONAL HIGH GROUNDWATER (ESHGW) LEVELS USED IN THE DESIGN OF THE STORMWATER FEATURES WERE 4-7 INCHES HIGHER THAN THE MOTTLING. 3.THE EXISTING AND PROPOSED VEGETATION AND GROUND SURFACES AND THEIR ASSOCIATED RUNOFF CO-EFFICIENT CAN BE FOUND ON PG. 10 OF THE STORMWATER REPORT. CONSTRUCTION SEQUENCING NOTES: 1.THE OVERALL DISTURBANCE AREA EXCLUSIVE OF THE BOARDWALK AND KAYAK LAUNCH PIERS WILL BE APPROXIMATELY 10.8 ACRES. BASED ON THE LINEAR NATURE OF THE PROPOSED DEVELOPMENT, THE PROPOSED EROSION CONTROL AND SEQUENCING WILL BE SPECIFICALLY DESIGNED TO MINIMIZE THE MAXIMUM EXPOSED SURFACE AREA AND PROVIDE AN OPPORTUNITY TO CAPTURE RUNOFF INSIDE THE DEVELOPMENT AREA AND MINIMIZE THE POTENTIAL FOR DISCHARGE TO THE PARKER'S RIVER. THE SEQUENCING WILL BE AS FOLLOWS: a.PHASE I CONSTRUCTION i.SET ALL PERIMETER EROSION CONTROL MEASURES FOR THE SITE. ii.ESTABLISH LAY DOWN AND STAGING AREA FOR EQUIPMENT AND EMPLOYEE PARKING IN THE EXISTING AREA BEING USED BY THE DPW FOR MATERIAL STORAGE AT THE FAR WESTERN EDGE OF THE SITE. iii.SET ALL VEGETATION PROTECTION MEASURES ALONG PERIMETER OF DEVELOPMENT AREA. iv.REMOVE EXISTING PAVEMENT AND SET CONSTRUCTION ENTRANCE PAD. v.PROVIDE AND PLACE FILL NEEDED IN THE PROPOSED ACCESS DRIVEWAY AND PARKING AREA TO BRING SITE GRADES FOR ALL PROPOSED UP TO ELEVATION 6.8+ AND PROVIDE CONSTRUCTION ACCESS TO THE BOARDWALK AND KAYAK LAUNCH. ONCE BOARDWALK HAS BEEN COMPLETED, COMPLETE INSTALLATION OF STABILIZED AGGREGATE WALKWAY, INCLUDING VEGETATIVE STABILIZATION OF SHOULDERS. vi.CLEAR ALL VEGETATION, AS SHOWN ON THE SITE PREPARATION PLAN AND GRUB AREAS WITHIN THE LIMITS OF PHASE I AREA TO BE ALTERED. vii.PLACE FILL FOR RESTROOM FACILITY WHILE MAINTAINING CONSTRUCTION STAGING AND LAYDOWN AREA, INCLUDING TEMPORARY VEHICULAR ACCESS TO STRUCTURE AREA. viii.CONSTRUCT RESTROOM FACILITY COMPLETE, INCLUDING ALL UTILITIES AND INFILTRATION SYSTEM ix.INSTALL WATER, SEWER & ELECTRICAL UTILITIES. x.SHAPE BERM ALONG EAST SIDE OF ACCESS DRIVEWAY COMPLETE, INCLUDING LOAM & SEED. xi.INSTALL INFILTRATION SYSTEM 1 COMPLETE. (DO NOT CONNECT WITH SWALE UNTIL ROADWAY IS PAVED AND WATERSHED AREA HAS BEEN STABILIZED.) xii.SET GRAVEL BASE IN ENTRANCE DRIVEWAY TO THE START OF THE PARKING AREA. xiii.COMPLETE INSTALLATION OF ALL DRAINAGE PIPING IN THE ENTRANCE DRIVEWAY. xiv.PROVIDE BASE COURSE PAVING IN ENTRANCE DRIVEWAY TO STATION 9+50 AT START OF POROUS PAVEMENT PARKING LOT. xv.PROVIDE VEGETATIVE COVER ON ALL EXPOSED SLOPES ALONG THE ENTRANCE DRIVEWAY. xvi.OPEN FLOW INTO INFILTRATION SYSTEM 1. b.INITIATE PHASE II CONSTRUCTION i.FILL & SHAPE INFIELD AREA & PERIMETER PATHWAY AND REINFORCED TURF SHOULDERS. ii.REMOVE BORROW FROM PARKING LOT AREA TO PROVIDE ROOM FOR POROUS EARTH DESIGN SECTION. USE MATERIAL REMOVED TO ROUGH GRADE AREA FOR DEVELOPMENT WEST OF PARKING LOT BETWEEN PAVEMENT AND THE RIVER. iii.SET BASE LAYERS FOR POROUS PAVEMENT iv.INSTALL INFILTRATION BASIN 3 COMPLETE, INCLUDING LOAM & SEED. v.INSTALL INFILTRATION TRENCH IN THE INFIELD AREA COMPLETE, INCLUDING REMOVE & REPLACE. vi.SET GRAVEL BASE FOR PERIMETER PATHWAY ACROSS THE ENTIRE SITE WEST OF THE ACCESS DRIVEWAY. vii.PLACE POROUS PAVEMENT AND PAVE CUL DE SAC INCLUDING VERTICAL GRANITE CURBING. viii.PAVE PERIMETER PATHWAY AND SET REINFORCED TURF AROUND THE INFIELD AREA. ix.FINISH PAVE ENTRANCE DRIVEWAY AND INSTALL BITUMINOUS CURB. x.COMPLETE LANDSCAPE PLANTINGS ALONG THE ENTRANCE DRIVEWAY. xi.LOAM & SEED THE INFIELD AREA. xii.SHAPE WALKWAYS BETWEEN THE PARKING LOT AND THE RIVER. xiii.CONSTRUCT PLAYGROUND AND SET ARTIST SHANTIES. xiv.COMPLETE INSTALLATION OF ALL REMAINING STABILIZED AGGREGATE PATHWAYS. xv.COMPLETE REMAINING LANDSCAPING.MATCHLINEPROP. EROSION CONTROL; SEE DETAIL (TYP.) PROP. LIMIT OF CLEARING (TYP.) PROP. EROSION CONTROL; SEE DETAIL (TYP.) PROP. LIMIT OF CLEARING (TYP.) PROP. LIMIT OF CLEARING (TYP.) PROP. PROTECTIVE FENCING FOR EXIST. VEGETATION (TYP.) N/F TOWN OF YARMOUTH 1146 ROUTE 28 ASSESS. MAP 18 PARCEL ID: 24/92 DEED BK 8979 PAGE 44 122.28 ACRES MARSH PARKER'S RIVER 11/17/2022 N4 * * * * 0+00 1+00 2+003+004+00 5+00 6+00 7+008+009+00 10+0011+0012+0013+0014+00 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 MATERIALS AND LAYOUT PLAN - 1 C.5.1 PARKER'S RIVER PARKER'S RIVER MA - ROUTE 28PROP. CONCRETE PAD FOR ARTIST'S SHANTY (STRUCTURE NIC) PROP. RESTROOM FACILITY PROP. GRANITE CURB - TYPE 1 PROP. KAYAK KIOSK (NIC) PROP. PLANTING BED (TYP.) PROP. HOT MIX ASPHALT BERM PROP. BARRIER GATE PROP. BARRIER GATE PROP. WOOD SPLIT RAIL FENCE PROP. NATURAL PLAY AREA PROP. HMA PATHWAY PROP. HMA PAVEMENT - TYPE 2 (TYP.) PROP. HMA PATHWAY PROP. CONCRETE STAIRS PROP. CONCRETE PAVEMENT PROP. STABILIZED AGGREGATE - VEHICULAR (TYP.) PROP. STABILIZED AGGREGATE - TRAIL, TYPE 2 PROP. HMA PATHWAY PROP. REINFORCED TURF (TYP.) PROP. LOAM & SEED PROP. STABILIZED AGGREGATE - VEHICULAR PROP. REINFORCED TURF (TYP.) PROP. REINFORCED TURF (TYP.) PROP. LIMIT OF DISTURBANCE (TYP.) PROP. HMA PATHWAY PROP. HMA PAVEMENT - TYPE 1 PROP. KAYAK LAUNCH APPROACH PROP. KAYAK LAUNCH GANGWAY PROP. KAYAK LAUNCH FLOAT PROP. GRANITE CURB - TYPE 2 PROP. HOT MIX ASPHALT BERMPROP. GRANITE CURB - TYPE 1 PROP. GRANITE CURB - TYPE 2 PROP. PLANTING BED (TYP.) PROP. REMOVABLE BOLLARD PROP. BIKE RACK - DOUBLE (TYP.) PROP. BENCH WITH COMPANION SEATING (TYP.)PROP. CONCRETE PAVEMENT (TYP.) PROP. INFILTRATION SYSTEM NO. 2 PROP. UTILITY TRANSFORMER PROP. INFILTRATION SYSTEM NO. 1 PROP. REINFORCED TURF (TYP.) PROP. STABILIZED AGGREGATE - PATHWAY PROP. SITE LIGHT - TYPE B PROP. SITE LIGHT - TYPE B PROP. SITE LIGHT - TYPE B PROP. BIKE RACK - DOUBLE (TYP.) PROP. BENCH WITH COMPANION SEATING (TYP.) PROP. BENCH WITH COMPANION SEATING (TYP.) PROP. TRASH RECEPTACLE (TYP.) PROP. STABILIZED AGGREGATE - TRAIL, TYPE 2 PROP. INFILTRATION BASIN NO. 3 IMPROVEMENTS IN THIS AREA FOR YARMOUTH TOWN-WIDE WASTEWATER COLLECTION SYSTEM & WATER RESOURCE RECOVERY FACILITY. WASTEWATER PUMP STATION (PROPOSED) THIS LOCATION CURRENTLY IN FINAL DESIGN. REFER TO THE MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY AND ENVIRONMENTAL AFFAIRS NUMBER (EEA) #14659 AND CORRESPONDING PERMITS RELATED TO THE COMPREHENSIVE WASTEWATER MANAGEMENT PLAN AND SUPPLEMENTAL SINGLE ENVIRONMENTAL IMPACT REPORT. PROPOSED IMPROVEMENTS THIS AREA (PUMP STATION BUILDING, SERVICE DRIVE, WALKWAYS, LANDSCAPING, ETC.) SHOWN TO FACILITATE THE INTERFACE BETWEEN THE TWO TOWN-OWNED PROJECTS. PARK DRAINAGE HAS BEEN DESIGNED TO ACCOMMODATE THE DESIGN OF THE PUMP STATION. FINAL IMPROVEMENTS IN THIS AREA TO BE PERFORMED BY OTHERS UNDER A SEPARATE CONTRACT. PROP. SITE LIGHT - TYPE A PROP. SITE LIGHT - TYPE A PROP. POROUS ASPHALT (TYP.) PROP. EVENT SPACE 11/17/2022 126°UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 MATERIALS AND LAYOUT PLAN - 2 C.5.2 PROP. BOARDWALK PROP. BOARDWALK - APPROACH PATH PROP. BOARDWALK - APPROACH PATH PROP. PEDESTRIAN BRIDGE PROP. BENCH LOCATION (TYP.) PROP. STABILIZED AGGREGATE - TRAIL PROP. STABILIZED AGGREGATE - TRAIL PROP. LIMIT OF CLEARING (TYP.) PARKER'S RIVER MARSH WOODED AREA WOODED AREA PROP. BENCH WITH COMPANION SEATING (TYP.) 11/17/2022 N4 * * * * 0+00 1+002+003+004+00 5+00 6+00 7+008+009+00 10+0011+0012+0013+0014+00 8 7 688 1 0 6 7 6 7 6 99 6 9 6 56756777 6 7 6 6 7 5 76 6 7 7 6 5 6765567 68684 6 7 8 8 1 05 8 77 87 7 5 76 677 778777 5 9 76543 654 7 65 6 5 8 68911 10 9 11109810119 67 1 0 6 6 8 6 109 87 1175 6 5 4 4 5 8 888 87 87 777 7 7 7 8 8 87 8 9 8 7 7 7 76 8 89811 6 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only 20 0 20 SCALE IN FEET: 1"=20' 40 GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 C.6.1 GRADING & DRAINAGE PLAN - 2 PARKER'S RIVER PARKER'S RIVER IMPROVEMENTS IN THIS AREA FOR YARMOUTH TOWN-WIDE WASTEWATER COLLECTION SYSTEM & WATER RESOURCE RECOVERY FACILITY. WASTEWATER PUMP STATION (PROPOSED) THIS LOCATION CURRENTLY IN FINAL DESIGN. REFER TO THE MASSACHUSETTS EXECUTIVE OFFICE OF ENERGY AND ENVIRONMENTAL AFFAIRS NUMBER (EEA) #14659 AND CORRESPONDING PERMITS RELATED TO THE COMPREHENSIVE WASTEWATER MANAGEMENT PLAN AND SUPPLEMENTAL SINGLE ENVIRONMENTAL IMPACT REPORT. PROPOSED IMPROVEMENTS THIS AREA (PUMP STATION BUILDING, SERVICE DRIVE, WALKWAYS, LANDSCAPING, ETC.) SHOWN TO FACILITATE THE INTERFACE BETWEEN THE TWO TOWN-OWNED PROJECTS. PARK DRAINAGE HAS BEEN DESIGNED TO ACCOMMODATE THE DESIGN OF THE PUMP STATION. FINAL IMPROVEMENTS IN THIS AREA TO BE PERFORMED BY OTHERS UNDER A SEPARATE CONTRACT.MA-ROUTE 28LIMIT OF SALT MARSH (TYP.) TO BOARDWALK PROP. INFILTRATION BASIN NO. 3 PROP. KAYAK RENTAL KIOSK EXIST. UPWELLER PROP. INFIELD TRENCH NO. 2 PROP. RESTROOM FACILITY FFE 12.0 PROP. INFILTRATION SYSTEM NO. 1 EXIST. PROPERTY LINE (TYP.) PROP. PUMP STATION EVENT SITE PROP. INFIELD TRENCH NO. 2 WOODED AREA PROP. INFILTRATION SYSTEM NO. 2 1 11/17/2022 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 C.6.1 GRADING & DRAINAGE PLAN - 2 C.6.2 PARKER'S RIVER M.L.W. ELEV. = -0.7" M.H.W. ELEV. = 2.05' WOODED AREA LIMIT OF SALT MARSH WOODED AREA EXIST. TREELINE (TYP.) MARSHZONE AE (EL 12)ZONE A E (EL 13)ZONE AE(EL 12)ZONE AE(EL 13)MARSH C.6.2 11/17/2022 0+00 1+00 2+003+00 4+00 5+00 6+00 8 8.40 8.40 8.40 9.07 9.07 9.07 8.40 TC 8.25 8.40 INSPECTION MANHOLE 1 RIM 8.60 INV IN 5.5 INV OUT 5.5 PROP. OUTLET CONTROL STRUCTURE 1 RIM 6.8 INV. 5.5 PROP. OUTLET W/ TIDE GATE INFILTRATION SYSTEM NO. 1 INV. 5.5 8.08 7.75 7.58 7.85 INV 5.5 5.3 5.3 5.3 INV 5.3 5.5 INSPECTION MANHOLE 2 RIM 8.50 INV IN 5.5 INV OUT 5.5 6 7 99 6 9 6 77 6 7 6 6 7 5 76 6 7 7 6 5 67 6 5567 64 6 7 8 8 7 65 8 12" HDPE 87 8 7 8 8 87 8 9 8 7 7 7 76 8 89811 10 9 8 7 6 7.34 7.56 BC 7.72 TC 7.97 8.00 7.81 7.90 7.83 7.51 7.53 7.79 8.54 8.43 8.55 8.43 8.18 8.06 INV 5.5 BC 8.70 TC 8.95BC 8.70 TC 8.95 BC 8.70 TC 8.95 BC 8.28 TC 8.78 8.83 7.68 7.63 7.56 BC 7.10 TC 7.60 7.59 7.64 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only 20 0 20 SCALE IN FEET: 1"=20' 40 GJ GJ REGISTERED PROFESSIONAL STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 GRADING & DRAINAGE - ENLARGEMENT PLAN - 1 C.6.3MATCHLINE - MATCH TO SHEET C.6.4MA - ROUTE 28IMPROVEMENTS IN THIS AREA FOR YARMOUTH TOWN-WIDE WASTEWATER COLLECTION SYSTEM & WATER RESOURCE RECOVERY FACILITY. WASTEWATER PUMP STATION (PROPOSED) THIS LOCATION CURRENTLY IN FINAL DESIGN. PROPOSED IMPROVEMENTS THIS AREA (PUMP STATION BUILDING, SERVICE DRIVE, WALKWAYS, LANDSCAPING, ETC.( SHOWN TO FACILITATE THE INTERFACE BETWEEN THE TWO TOWN-OWNED PROJECTS. PARK DRAINAGE HAS BEEN DESIGNED TO ACCOMMODATE THE DESIGN OF THE PUMP STATION. FINAL IMPROVEMENTS IN THIS AREA TO BE PERFORMED BY OTHERS UNDER A SEPARATE CONTRACT. 11/17/2022 4 * 5+00 6+00 7+008+009+00 10+0011+00 7 7.10 7.3 7.3 7.3 7.3 7.50 7.50 7.50 7.50 7.1 7.1 7.17.1 7.50 7.50 7.10 7.55 7.50 7.50 7.50 7.50 7.17.10 7.50 7.50 7.10 7.10 7.28 7.50 7.55 7.55 6.15 9.07 TC 8.25 8.40 7.10 7.03 7.43 7.43 7.43 TC 7.50 PROP. CURB INLET BC 7.10 TC 7.50 7.82 7.20 AREA DRAIN 1 RIM 8.75 INV IN 5.75 INV OUT 5.75 7.10 7.10 7.10 7.20 7.90 7.20 6.80 7.25 7.20 6.856.80 6.80 6.15 6.80 6.90 6.88 7.50 7.28 7.55 TC 7.80 TC 7.80 7.89 7.96 7.89 8.30 8.42 8.22 8.10 6.80 6.74 INSPECTION MANHOLE 1 RIM 8.60 INV IN 5.5 INV OUT 5.5 7.55 7.26 7.26 7.26 AREA DRAIN 5 RIM 7.0 INV OUT 6.0 7.55 7.55 7.26 7.55 7.50 7.50 7.50 PROP. OUTLET CONTROL STRUCTURE 1 RIM 6.8 INV. 5.5 PROP. OUTLET W/ TIDE GATE INV. 4.0 INV. 5.5 7.28 7.28 7.28 7.28 INV. 5.0 7.28 7.28 7.28 7.28 7.28 7.28 7.28 7.28 TC 7.80 7.55 TC 7.80 TC 7.80 7.55 INV IN 4.1 INV 5.5 HP 8.25 5.3 INSPECTION MANHOLE 2 RIM 8.50 INV IN 5.5 INV OUT 5.5 6.80 6.65 6.50 6.25 6.35 6.35 10.2 6.72 5.90 8" HDPE2 - 8" DI 12" HDPE91 0 7 6 5567 68684 671 0 6 6 8 4 8 77 887 6 6 67 75 765 6 5 8 68911 10 9 11109810119 6 7 8 9 1 0 6 6 7 8 4 6 4" PERF. 4" PER F . 4" PE R F. 4" PERF.4" PERF.4" PERF.4" PERF.AREA DRAIN 2 RIM 6.75 INV OUT 6.25 AREA DRAIN 3 RIM 6.75 INV IN 6.25 INV OUT 6.25 10 9 8 7 1110987AREA DRAIN 4B RIM 6.75 INV IN 6.25 INV OUT 6.25 7 5 4 PROP. INFIELD TRENCH - 2 6 5 4 4 5 8 888 87 7 7 7 BC 8.70 TC 8.95 PROP. CURB INLET BC 7.10 TC 7.50 AREA DRAIN 4A RIM 6.75 INV IN 6.25 INV OUT 6.25 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only 20 0 20 SCALE IN FEET: 1"=20' 40 GJ GJ REGISTERED PROFESSIONAL STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 GRADING & DRAINAGE - ENLARGEMENT PLAN - 2 C.6.4MATCHLINE - MATCH TO SHEET C.6.3MATCHLINE - MATCH TO SHEET C.6.511/17/2022 * * * * 12+0013+0014+00 6.15 7.10 7.10 7.50 7.50 6.80 6.80 7.20 7.277.35 7.45 7.25 PROP. OUTLET CONTROL STRUCTURE 2 RIM 7.00 INV. EL. 4.65 12" OUT 36" SPILLWAY INLET CREST ELEV - 6.25 PROP INFILTRATION BASIN 3 6.75 7.20 7.30 7.40 7.50 7.40 7.30 7.50 7.75 7.20 7.10 7.00 6.90 7.00 7.10 6.90 6.80 7.00 7.75 7.50 7.50 6.80 7.28 7.28 AREA DRAIN 6 RIM 7.20 INV 5.50 TC 7.50 TC 7.60 TC 7.63 INV OUT 5.25 TC 7.90 FFE 7.50 4" PERF.4" PERF. 6 6 7 6567567 6 5 7 5 7777 6 12" FLARED END WITH RIP RAP INV. ELEV - 4.00 2 SEDIMENT FOREBAYS IN SERIES STORAGE VOL. 100 CU. FT./MIN. TOP OF BASIN ELEV. 7.25 4" PERF.4" PERF.777 7 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only 20 0 20 SCALE IN FEET: 1"=20' 40 GJ GJ REGISTERED PROFESSIONAL STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 GRADING & DRAINAGE - ENLARGEMENT PLAN - 3 C.6.5MATCHLINE - MATCH TO SHEET C.6.411/17/2022 PLAN VIEW CURVE ENDS UPHILL PROTECTED ZONE FLOW EXIST. TREE NOTES: 1.PLACE TUBE ALONG CONTOURS AND PERPENDICULAR TO FLOW. 2.ADJUST LOCATION AS REQUIRED FOR OPTIMUM EFFECTIVENESS. DO NOT INSTALL IN WATERWAYS. 3.PLACE STAKES AS NEEDED TO SECURE TUBES IN PLACE. COMPOST FILTER TUBE REDUCE FLOW ONTO WORK ZONE FLOW BIODEGRADABLE FABRIC FOR SLOPES 3:1 OR AS NECESSARY, STAKE OR OTHERWISE SUPPORT TUBES (I.E., TREES, CINDER BLOCKS) ENSURE FIRM CONTACT WITH GROUND TO PREVENT FLOW UNDERNEATH TUBES RESOURCE AREA *9 INCH MAY BE USED FOR FLATTER SURFACES WITH APPROVAL FROM ENGINEER. PREVENT FLOW OFF SITE: PLACE AS CLOSE TO AREA OF DISTURBANCE AS POSSIBLE EROSION CONTROL BARRIER - TYPE 212" DIA.INSTALLEDAREA OF SOIL DISTURBANCE MINIMUM 3'OVERLAPFORCONTINUOUSBARRIERHARDWOOD STAKES PLACED OUTSIDE OF TUBES OR PER MANUFACTURERS INSTRUCTIONS SNOW FENCE 6' STANDARD STEEL POST, 6' O.C. (TYP.) 12" CLEARANCE AROUND DECIDUOUS TREES EX. GRADE DECIDUOUS TREE EVERGREEN TREE SNOW FENCE 6' STANDARD STEEL POST, 6' O.C. (TYP.) 12" CLEARANCE AROUND EVERGREEN TREES EX. GRADE PROTECTIVE FENCING FOR EXISTING VEGETATION EXISTING TREE TREE PROTECTION FENCE AND/OR PROTECTIVE BARRIER, TYP. TOPSOIL 'A' HORIZON SOIL 'B' HORIZON SUBGRADE 'C' HORIZON TREE ROOT FLARE TREE TRUNK TREE DRIP LINE CRITICAL ROOT ZONE (CRZ) TREE PROTECTION FENCE AND/OR PROTECTIVE BARRIER CRITICAL ROOT ZONE (CRZ)CRITICAL ROOT ZONE (CRZ)TREE DRIPLINETREE DRIPLINE5'MIN.SOIL/ ROOT ZONEDEPTH T.B.D.VAR T.B.D 10' (TYP.) 5" MIN. EXISTING TREE PRESERVATION WITH AIRSPADE EX. GRADE SNOW FENCE 6' STANDARD STEEL POST, 6' O.C. 12" CLEARANCE AROUND SHRUBS SHRUB TO BE PROTECTED SHRUB PROTECTION DEVICE SILT FENCE FILTER FABRIC 2"x2" WOOD POST @ 7'-6"± O.C. FILTER FABRIC BURIED 6" INTO GRADE DRIVE STAKES PERPENDICULAR TO GRADE WRAP FABRIC UNDER COMPOST FILTER TUBE WETLAND COMPOST FILTER TUBE 1"x1"x3' OAK STAKES SPACED 4' APART SEDIMENTATION FENCE/FILTER FABRIC PLACE COMPOST FILTER TUBE IN 3" TO 5" TRENCH, WATER MUST NOT BE ALLOWED UNDER OR AROUND ROLL SILT FENCE/FILTER FABRIC 2"x2" WOOD POST @ 7'-6"± O.C. EROSION CONTROL BARRIER - TYPE 1 EMBEDDING DETAIL ANCHORING DETAIL FL O W FLOW PUB LI C R O A D GEOGRID CRUSHED STONE CONSTRUCTION ENTRANCE DEPTHVARIESMATCH ASREQUIRED(AS REQUIRED) D D FLOW (VARIES) RIVER BOTTOM RIVER BOTTOM 1/4" CHAIN BALLAST (MIN.) SEWN FABRIC SILT CONTAINMENT BARRIER HIGH FLOW PERMEABLE POLYPROPYLENE OR EQUAL GROMMETS VINYL COATED NYLON OR POLYESTER FLOAT CONTAINER TIE STRAP TIE STRAP FLOAT H.W.H.W. 8" DIA. ROUND FLOAT 0.2 LB/FT CHAIN BALLAST BOTTOM TO MATCH RIVER BOTTOM DEPTH OR GREATER SILT CONTAINMENT BARRIER RIVER DEPTH VARIES TENSION LINE TIE STRAP 4'MIN.FLOAT WIDTH AS REQUIRED GALVANIZED STEEL TURNBUCKLE GALVANIZED STEEL POST ANCHOR 12"FLOATING SILT FENCE EROSION & SEDIMENT CONTROL DETAILS C.7.7 UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only AS SHOWN GJ GJ REGISTERED PROFESSIONAL STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/2211/17/2022 SCALE:AREA DRAIN1" = 1'-0"12"x12" NDS AREA DRAIN,SEE PLAN FOR LOCATION ANDRIM ELEVATIONSDRAIN PIPE,SEE PLAN FOR PIPESIZE AND INVERTELEVATIONS6"6"MIN.LOAM & SEEDCOMPACTEDCRUSHEDSTONE BASECLASS I OR II MATERIALPER ASTM D2321, LATEST EDITION,COMPACTED IN MAX. 8" LOOSE LIFTSTO 95% MIN. OF MAX. SPD* H , H = 12" FOR UP TO AND INCLUDING 36" N-12 = 24" FOR 42"-48" N-12FILTER FABRIC(AASHTO M-288)** SEE TABLE 112UNDISTURBEDEARTHH (RIGID PVMT.)*1BEDDING (CLASS I OR II MATERIAL)= 4" MIN. FOR 12"-24" N-12, 42"-48" HC= 6" MIN. FOR 30"-48" N-12HDPE PIPE2H (FLEX. PVMT.)*TABLE 1NOMINAL DIAMETER,IN (MM)FT (M)X (MIN.),0.69 (0.21)12 (300)0.68 (0.21)15 (375)0.74 (0.23)18 (450)0.84 (0.26)24 (600)1.5 (0.46)30 (750)1.5 (0.46)36 (900)1.5 (0.46)42 (1050)1.5 (0.46)48 (1200)TYPICAL SUB-SURFACE TRENCH DETAILHOT MIX ASPHALTSECTION A-APLANSECTION B-BSTONE AT PIPE ENDSDRAINAGEDETAILS - 1INFILTRATION SYSTEM NO. 2 - RESTROOM FACILITYUNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTIONSHEET NO.SCALEDATEDESIGNED BY:10056CHECKED BY:BETA JOB NO.:ISSUE DATE:DRAWN BY:REVISIONSNO.TITLEPROJECTPREPARED BYWest Yarmouth, MAYARMOUTHRIVERWALKPARKAKPFor Review Only80SCALE IN FEET: 1"=40'4004020020SCALE IN FEET: 1"=20'40404SCALE IN FEET: 1"=4'810010SCALE IN FEET: 1"=10'20NONEAS SHOWNGJGJREGISTERED PROFESSIONAL100SCALE IN FEET: 1"=50'50050200SCALE IN FEET: 1"=100'1000100160SCALE IN FEET: 1"=80'80080STORMWATER APPLICATIONPERMIT - PLAN SETREGISTERED PROFESSIONAL11/18/22C.7.811/17/2022 INFILTRATION SYSTEM NO. 1 - ACCESS DRIVEWAY TREATMENT SYSTEMINSPECTION MANHOLEOUTLET CONTROL STRUCTURE AT INFILTRATION BASIN (1 & 3)PLANFRONT ELEVATIONSECTIONCHECK DAM CROSS SECTIONDRAINAGEDETAILS - 2UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTIONSHEET NO.SCALEDATEDESIGNED BY:10056CHECKED BY:BETA JOB NO.:ISSUE DATE:DRAWN BY:REVISIONSNO.TITLEPROJECTPREPARED BYWest Yarmouth, MAYARMOUTHRIVERWALKPARKAKPFor Review Only80SCALE IN FEET: 1"=40'4004020020SCALE IN FEET: 1"=20'40404SCALE IN FEET: 1"=4'810010SCALE IN FEET: 1"=10'20NONEAS SHOWNGJGJREGISTERED PROFESSIONAL100SCALE IN FEET: 1"=50'50050200SCALE IN FEET: 1"=100'1000100160SCALE IN FEET: 1"=80'80080STORMWATER APPLICATIONPERMIT - PLAN SETREGISTERED PROFESSIONAL11/18/22C.7.911/17/2022 EDGE INFILTRATION TRENCHPOROUS PAVEMENT2"4"Ø PERFORATED PIPE4"Ø SOLID PIPEFILTER FABRIC2'2'34" AGGRGATE1 12" AGGREGATE MASSHIGHWAY SPECINFIELD TRENCH 1 - DETAILINFIELD TRENCH 2 - DETAILPERIMETER DRAIN DETAIL AT RESTROOMOUTFALL DETAILCURB INLET DETAILSECTION A-APLANAAAXONDRAINAGEDETAILS - 3UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTIONSHEET NO.SCALEDATEDESIGNED BY:10056CHECKED BY:BETA JOB NO.:ISSUE DATE:DRAWN BY:REVISIONSNO.TITLEPROJECTPREPARED BYWest Yarmouth, MAYARMOUTHRIVERWALKPARKAKPFor Review Only80SCALE IN FEET: 1"=40'4004020020SCALE IN FEET: 1"=20'40404SCALE IN FEET: 1"=4'810010SCALE IN FEET: 1"=10'20NONEAS SHOWNGJGJREGISTERED PROFESSIONAL100SCALE IN FEET: 1"=50'50050200SCALE IN FEET: 1"=100'1000100160SCALE IN FEET: 1"=80'80080STORMWATER APPLICATIONPERMIT - PLAN SETREGISTERED PROFESSIONAL11/18/22C.7.1011/17/2022 NYH YH YH YH * * * * YH HYD LOAD CENTER FOR STAGE ELECTRICAL SERVICE TO PROP. KAYAK KIOSK 2" SANITARY SEWER FORCE MAIN LINE 2" WATER LINE LOAD CENTER FOR EVENT/LAWN SPACE 8" WATER LINE R&S EXIST. HYDRANT, WATER METER AND VALVE TERMINATE 2" SANITARY SEWER FORCE MAIN LINE RESTORE/UPGRADE WATER & ELECTRICAL SERVICE TO UPWELLER FACILITY RESTROOM PUMP CHAMBER, SEE DETAIL INFILTRATION SYSTEM NO. 2 PROP. SITE LIGHT, TYPE A (TYP.) PROP. SITE LIGHT, TYPE B (TYP.) PROP. SITE LIGHT, TYPE A (TYP.) 2" SANITARY SEWER FORCE MAIN LINE SANITY SEWER MANHOLE NO. 1 B B B S3-LP-B REMOVE EXIST. UTILITY POLE, DISCONNECT ELECTRICAL SERVICE REMOVE EXIST. UTILITY POLE, DISCONNECT ELECTRICAL SERVICE EMH NO. 1 INFILTRATION SYSTEM NO. 1 PROP. UTILITY POLE TO RECEIVE ELECTRICAL SERVICE ON COURTLAND WAY S3-LP-B S3-LP-B S3-LP-B S3-LP-B S3-LP-B S3-LP-B S3-LP-B S3-LP-B S3-LP-B S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-AS1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-A S1-LP-AS1-LP-A S1-LP-AS1-LP-A S1-LP-A S1-LP-A PROP. RESTROOM FACILITY UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION SHEET NO. SCALE DATE DESIGNED BY: 10056 CHECKED BY: BETA JOB NO.: ISSUE DATE: DRAWN BY: REVISIONSNO. TITLE PROJECT PREPARED BY West Yarmouth, MA YARMOUTH RIVERWALK PARK AKP For Review Only GJ GJ REGISTERED PROFESSIONAL 100 SCALE IN FEET: 1"=50' 50050 STORMWATER APPLICATION PERMIT - PLAN SET REGISTERED PROFESSIONAL 11/18/22 SITE UTILITY PLAN U.1.1 LEGEND ENCLOSURE / POWER PANEL SITE LIGHT - TYPE A (S1-LP-A) YH YARD HYDRANT HYDRANTHYD 8" WATERLINE 2" WATERLINE SANITARY SEWER FORCE MAIN LINE PARKER'S RIVER PARKER'S RIVER MA - ROUTE 28SITE LIGHT - TYPE B (S3-LP-B) NOTE: REFER TO ELECTRICAL PLANS FOR DETAILS AND DISTRIBUTION.