HomeMy WebLinkAboutFloor PlanSIGN DETAIL
NEW ARCHITECTURAL
ROOF SHINGLES
w/TRI-FLEX
UNDERLAYMENT--,
,$.2nd PLk _____
_ CIS st FLR _ _
WEST SIDE ELEVATION
SCALE: 3/16" = 1'-0"
NEW STAIR AND RAMP —
FOR AMBULANCE ACCESS
114VI\ 1 1 1 IL LL Vr-%1 IVIV kV 1 1\LL 1 VIVI_
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = V-0"
EXISTING WINDOW
REMOVED. INFILL
w/NEW SIDING TO
MATCH EXISTING
NEW ROOF
OVER NEW
SIDE ENTRY -
STEPS w/IRON
RAILING
I—(JWLIC OLILJIIVCa LA.IUK
EXISTING CHIMNEY
TO BE REMOVED
REMOVED AND FILLED IN
w/NEW EXTERIOR WALL
TO MATCH EXISTING
�EXISTING WINDOW REMOVED. INFILL
lu/NEW SIDING TO MATCH EXISTING
Tnd FLR
NEW WINDOWS AT FIRST
FLOOR REAR ELEVATION.
NEW PVC TRIM TO MATCH
EXISTING DETAILS
12'-0"
. r SIGN PANEL -A
c SIGN PANEL-E
:cc ne nwwr_a cr�o I nrnri nil
TVPI(_Al F=I F=\/ATir)Kl KlnTf=C-
MATERIALS NOTED
2. EXISTING RIDGE IS APROXIMATELY 25'-0II ABOVE
GRADE.
3_ (6 QTY.) NEW WINDOWS TO BE ADDED AT FIRST
FLOOR. SEE FLOOR PLAN AND ELEVATIONS FOR
LOCATIONS.
4. NEW TRIM TO MATCH EXISTING.
5. (2 QTY.) WINDOWS AT FIRST FLOOR TO BE
REMOVED
6. (1 QTY.) WINDOW AT SECOND FLOOR TO BE
REMOVED
7. DAMAGED OR MISSING SIDING TO BE REPAIRED OR
REPLACED AS NEEDED. REPAIRED AND REPLACED
SIDING TO MATCH EXISTING.
8. DAMAGED OR MISSING TRIM TO BE REPAIRED OR
REPLACED AS NEEDED. REPAIRED AND REPLACED
TRIM TO MATCH EXISTING.
9. EXISTING ASPHALT ROOF TO BE REPAIRED AS
NEEDED. REPAIRED ROOFING TO MATCH EXISTING.
EW WINDOW
DRAWING TITLE:
PROPOSED
ELEVATMNS
DRAWN BY:
CHECKED BY:Lv,
DATE
0912312022�
REVISIONS:
7/2012021
8/18/2021
9/18/2022
' PROJECT No. 21 02 I'
THIS DRAWING IS PART OF A COMPLETE
ARCHITECTURAL SET. THERE IS
INFORMATION PERTAINING TO THIS DRAWING
ON OTHER SHEETS- REFER TO TI FOR
COMPLETE SHEET LIST. DO NOT DO TAKE
OFFS, RIDDING OR CONSTRUCTION ON THIS
STRUCTURE WITHOUT A COMPLETE SET.
SHEET No.
EAST SIDE ELEVATION
SCALE: 3/16" = V-0"
EXISTING DRIVE-THRU WINDOW
TO BE REMOVED AND FILLED IN
w/NEW EXTERIOR WALL AND
WINDOWS TO MATCH EXISTING
NEW WINDOWS AT FIRST
FLOOR EAST ELEVATION.
NEW PVC TRIM TO MATCH
EXISTING DETAILS
NEW GRANITE STEPS
w/IRON RAILING
fan-m -nm oocso
SIMPSON H2.5 HURRICANE
CLIP ® EACH RAFTER
ATTIC FLR _
1st FLR
SIMPSON H2.5 HURRICANE
CLIP ® EACH RAFTER-7
PARAPET AT
FRONT ELEVATION
(BEYOND) —1
-ExISTTNG-2xT2s V2"o.7c—.
PROCEDURE 4
LAV I
14N 7Y4' STEEL
BEAM to REMA
NEST II SCOPE ROOM
CORR,
2" DUST
UPPER
NORTH
HALL
EXISTING 2xI0s
TOI LET
ROOM
NEW ARCHITECTURAL ROOF
SHINGLES w/TRI-FLEX
jA
UNDERLAYMENT
IN R�p RqF _ SIMPSON H2.5 HURRICANE
rEo-�'' _ CLIP 6 EACH RAFTER
ATT 1 C
157/e"x 7%" STEEL
BEAM to REMAIN
PROCEDURE 3
EXISTING FLOOR JOISTS TO REMAIN
CRAALSPACE
SECTION THRU FRONT (STREET SIDE) OFFICES
SCALE: 1/4" = 1'-0"
SIMPSON H2.5 HURRICANE
CLIP ! EACH RAFTER
SIMPSON H2.5 HURRICANE PARAPET CLIP ® EACH RAFTER — FRONT ELEVATION
] (BEYOND) —I
[ EXISTING 2xl2s 612"o.c.
c--
2nd FLR
\ n DR a _lAG
NEW N14x26 STEEL
- BEAM FLUSH FRAME
(NEW 3" x 3" x 114"
to w SQUARE STEEL TUBE
o z COLUMNS REQUIRED
++ o u IN !NALL UNDER EACH
o l END of NEW BEAM)
*a CHECK -IN WAI-rIKI
st FLR
ESENTATI
EXISTING ROOM
KITCHEN CHIMNEY BEYOND
/LUNCH REMOVED
EXISTING
12%"x 4"
STEEL B
to REMA'
EXISTING 2xI0s 412"o.c.
EXISTING
STEEL
COLUMN
EXISTING FLOOR JOISTS TO
PARTIAL FULL BASEMENT
m . c
SECTION THRU BACK OFFICES
SCALE: 1/4" = 1'-0"
NEW ARCHITECTURAL ROOF
SHINGLES w/TRI-FLEX
UNDERLAYMENT
V
0
N
x NEW N14x26 STEEL
w BEAM FLUSH FRAME
STAIRWELL (NEW 3" x 3" x 1/4"
SQUARE STEEL TUBE
COLUMNS REQUIRED
IN
EXISTING
STEEL
COLUMN
IN NALL UNDER EACH
END of NEW SEAM) —
EXISTING
STEEL
COLUMN-
STAIRS for '--ry
III' TREADS G L
7" RISERS
STAIRS to
► BASMENT
EXISTING 2xl2s 012"o.c.
EAST M CORR. (I 2D II ROOM
SIMPSON H2.5 HURRICANE
CLIP f EACH RAFTER
a
EXISTING 2xl2s 012"o.c.
HALL TO II MEDICAL
;HECKOUT ASSISTANT
SIMPSON H2.5 HURRICANE
CLIP 0 EACH RAFTER
TOILET
ROOM
let FLR
SIMPSON H2.5 HURRICANE
CLIP ® EACH RAFTER
let FL
l—
i
0
u
4-1
z..�
/Iu
•
V�
U
x'
i-
O
Q,
CA
0
•'r
a
vI
O
b
o
�
V�
O
V
4-Jrg
v O
vCOOD
Q�
O
w
O
O
O
d,
MLI
M lxT
DRAWING TITLE: � �p
MGM SEO 5ROINS
DRAWN BY:
CHECKED BY:�,
DATE: 09/23/2022
REVISIONS: 8/16/202? f
PROJECT No. 02
THIS DRAWING IS PART OF COMPLETE
ARCHITECTURAL SET. THERE IS
INFORMATION PERTAINING TO THIS DRAWING
ON OTHER SHEETS. REFER TO T1 FOR
COMPLETE SHEET LIST. DO NOT DO TAKE
OFFS, BIDDING OR CONSTRUCTION ON THIS
STRUCTURE WITHOUT A COMPLETE SET.
SHEET No.
uci_i e.vic rxice urw
2600 GROSS SQ. FT.
SECOND FLOOR PLAN
SCALE: 3/16" = V-0"
Im
v
WALL KEY
NEW
I : EXISTING TO REMAIN
!AL
lu
F
z
a
a
z
0
u
DRAWING TITLE:
PROPOSED
SECOND FLOOD
pL AN
DRAWN BY: gg
CHECKED BY:�
DATE: 09123/2022�
,REVISIONS: 8/16/2021
rPROJECT No. 2102
THIS DRAWING IS PART OF A COMPLETE
ARCHITECTURAL SET. THERE IS
INFORMATION PERTAINING TO THIS DRAWING
ON OTHER SHEETS. REFER TO T1 FOR
COMPLETE SHEET LIST. DO NOT DO TAKE
OFFS, BIDDING OR CONSTRUCTION ON THIS
STRUCTURE WITHOUT A COMPLETE SET.
SHEET No.
FIRST FLOOR PLAN
SCALE: 3/16" = 1'-0"
WALL KEY
: EXISTING TO REMAIN
\
\
\
\ n
L MINIMUM W-6' INSIDE FINISHED
ELEVATION AA
SOAP
C-PAINTS
DISPENSER
IK4 PLASTIC
�r
-
LAMINATE
5ACKSPLASH
TOWEL
CPAPER
DISPENSER
MINMIN.
�42"
12'
6'
MIN
MAX
..44
RAS
BAR
r
} t
1
ELEVATION BB
521 CMR MAAB COMPLIANT LAVS
INTERIOR ELEVATIONS
L MINIMUM 6'-6' INSIDE FINISHED I.
ELEVATION CC fififi
HANDICAP LAV
AAB 521 CMR
COMPLIANT
SEP a C, 7022
HEALTH DEPT.
3 30
02 /ev ">
rN\'c�� cc L.
..
I
d
z
Ln
Vko
F
apa
V
O
N
P�
O
Q
�
4-J
V
di
�L
�
o
po
o u
VQj
u1
N '�
4�-I 4�-'
u c7
�h
O
@)
Q
MCIS
LL
��-,
DRAWING TITLE:
PROPOSED
HR3 FL OR
Q
I DRAWN BY: n t II
'', CHECKED BY: "w I I
I'DATE: 0912312022 11
02/11/2021
8/1612021
812412022
:PROJECT No. 2102
THIS DRAWING IS PART OF A COMPLETE
ARCHITECTURAL SET. THERE IS
INFORMATION PERTAINING TO THIS DRAWING
ON OTHER SHEETS REFER TO T1 FOR
COMPLETE SHEET LIST DO NOT DO TAKE
OFFS, RIDDING OR CONSTRUCTION ON THIS
STRUCTURE WITHOUT A COMPLETE SET.
No.
A2
f
r
-
SCALE 1 /2" = 1'-0"
�0�]�irG1GC�0 o M, DOC���