HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. / %. I Lot /2 '2- Zone of Contribution: In Out " Acreage 75 S if t)
it
Commercial Residential: •
Street:Village: Floor Plan: �� #Bedrooms:
Owner: Installer: Tom. c...,..4 .. p U -f,.../`71
Address: Phone:
Phone:
Builder: Engineer: / o c4.W CA 'e..
Address: Phone:
Phone:
N/A YES . NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years /
3. 4-5 ft of naturally occurring pervious material,above water table /
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5. Water line 10 ft from septic components Var.: I t/
6. Benchmark indicated and shown-NGVD if near wetlands -----
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: j L.
- -
9. Leaching minimum 100 ft from wetlands Var.: I ✓
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: r
12. System meets all other setback requirements Var.: /
13. Uses adjustment for maximum high groundwater Var.: /
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: /
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable - l`
17. System meets slope requirements-min. 1/8", %"preferred /
18. System meets breakout requirements PVC liner: Wall: l
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use b/
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade Cam- 1
25. Inspection port on plastic chambers/leach field -----
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size i
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber .
31. Engineer to inspect and certify soils: wall: commercial: /
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd �G _
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed b.. Q^...,, _ 60101