Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 34( Lot if--V Zone of Contribution: In Out 'Acreage
/ Commercial: Residential:
Street: 5 � 4 2 / fe'i-'
Village: << Floor Plan: L/ #Bedrooms:
Owner: Installer: - ()c.,
Address: Phone:
Phone:
Builder: Engineer: 4 C Z.,'wit.); / e e.f i s
Address: Phone:
Phone:
N/A YES NO
I. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: s/
6. Benchmark indicated and shown-NGVD if near wetlands v.'''.
7. Septic tank minimum 10 ft from foundation, deck ar.: - , /
8.Leaching minimum'20 ft full, 15 ft crawl, 10 ft slab .. �_._.ice 6
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irriaat'.n well Var.:
11. Tank/leaching minimum 10 ft from property line a_i ry s .'
12. System meets all other setback requirements 'ar.: e-----
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole 400 1/ ./
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable f
17. System meets slope requirements-min. 1/8", '''/"preferred /-
__18. System meets breakout requirements PVC liner: Wall: /.
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal j
22. System adequately sized for its intended use l
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes /
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size . --
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature /
33.H-20loading is subject to vehicular traffic,groundwater ,----
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: _7. ' Q•e ----" - c 01 01
��Gr-ate