Loading...
HomeMy WebLinkAboutCOC requestCAPE COD ENGINEERING, INC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel 508-385-1445 / Fax 508-385-1446 bobyerrv<<ucapecod.net February 27, 2023 Town of Yarmouth Conservation Commission 1 146 Route 28 South Yarmouth, MA 02664 RE: SE83-2203, 11 North Cove Landing, So. Yarmouth — Certificate of Compliance Marine Bulkhead To the Conservation Commission, Attached please find Form 8A, an As -built plan and a check in the amount of $75. The As -built plan is inclusive of the 3 properties that were part of the comprehensive seawall project. The project portion was carried out in a high. level of compliance. The planting strip measures 7 ft. wide. We anticipate that the occasional tidal floods surcharging the land area will assist to return the heavily grassed land area to a condition highly similar to the preconstruction condition. The small driveway access restoration was carried out as per the Amended Order. The project warrants a favorable consideration for a Certificate of Compliance. Please contact me directly with any questions. Thank you for your assistance with this project. Sincerely, Cape Cod Engineer,,i , Inc. r� Robert M. P Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. d Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form $A — Request for Certificate of Compliance SE 83-2203 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information - 1. This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailing Address East Dennis MA 02641 City/Town State Zip Code 508-385-1445 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Kenneth Rodgers Applicant 8/19/2019 SE 83-2203 Dated DEP File Number 3. The project site is located at: 11 North Cove Landing South Yarmouth Street Address City/Town 52 2 Assessors Map/Plat Number Parcel[Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Josephine Rodgers Property Owner (if different) Barnstable Book: 32472 Original Pg: 301 County Book: 35444 Amended Pg: 1 Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformftdoc -- rev. 5129114 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE 83-2203 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). if the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.00v/eea/agencies/massdep/about/contacts/find-the-massdep-reaiana! office for-ygur&ity-or-town . html). wpaform8a.doc -- rev. 5129/14 Page 2 of 2 10 5 0 PLAN 10 1 inch = 10 ft. 30 NOTES 1. ELEVATIONS REFER TO THE PLAN BENCHMARK 2. THE AS -BUILT PLAN IS BASED ON SITE CONDITIONS OBSERVED AND SURVEY MEASUREMENTS PERFORMED OF THE COMPLETED MARINE BULKHEAD ON JUNE 2, 2022x OFF: 3. PERMIT REFERENCE: ORDER OF CONDITIONS - DEP FILE NOS. SE83-2201, 83-2202, 83-2203 �}qB�. AS LISTED ON THE PLAN PF�ar CIVIL . �sasfl S T ANNINO.DWG