Loading...
HomeMy WebLinkAboutCOC requestRobert M. Perry, P.E. P.O. Sox 1517 East Dennis. MA 02641 Tel 508-385-14451 Fax 508-385-1446 tlobye rr}'d icapecod.net February 27, 2023 Town of Yarmouth Conservation Commission i l46 Route 28 South Yarmouth, MA 02664 RE: SE83-2201, 15 North Cave Landinx, Su. Yarmouth — Certificate of Compliance Marine Bulkhead To the Conservation Commission, Attached please find Form 8A, an As -built plan and a check in the amount of $75. The As -built plan is specific to the 3 properties that were part of the comprehensive seawall project. The bulkhead was constructed in significant compliance with the plan and consistent with the existing conditions relating to the old seawall. Site work was well controlled during the project. The planted buffer strip varies in width but is consistent with the intent. We have discussed with the applicant that careful mowing control will best preserve the strip. Of note is the significant effort on the part of the applicant and the contractor to save a significant tree at the edge of the old wall that was to be taken as a result of the wall work. This tree was cable -stabilized during construction and appears to be doing well after almost 3 years since completion of the job. Based on our site inspection the project warrants favorable consideration for a Certificate of Compliance. Please contact me directly with any questions. Thank you for your assistance with this project. Sincerely, Cape Cod Engi ee g, Inc. Ro ert M. P Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands !- WPA Form 8A — Request for Certificate of Compliance 5E 83-2201 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 _ A. Project Information r Important: When filling out forms on the computer, use only the tab key to move your Cursor - do not use the return key. 1. This request is being made by Cape Cod Engineerinq, lnc._- Name PO Box 1517 Mailing Address East Dennis CitylTawn 508-385-1445 Phone Number MA State 2. This request is in reference to work regulated by a final Order of Conditions issued to: Upon completion of the wofk 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Douglas & Beth Annino Applicant 8/19/2019 Dated The project site is located at 15 North Cove Landin❑ Street Address 52 Assessors MaplPlat Number SE 83-2201 DEP File Number South Yarmouth CityfTown 1 Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for Beth L. Annino Property Owner of different) Barnstable Book: 32472 Original County Book: 35443 Amended Certificate (if registered land) 5. This request is for certification that (check one): 02641 Zip Code Pg: 315 Pg: 331 ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.dac -- rev. 5/29U14 f aa© 1 r7f 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number. WPA Form 8A — Request for Certificate of Compliance 5E 83-2201 _ Massachusetts Wetlands Protection Act M.G,L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chanter 143 A. Project Information (coat.) 5. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC)_ If the project received an OOC from the Conservation Commission. submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http:llwww.mass.gov/eea/agencieslmassdep/abouticontactslfi nd-the=massdep regional-offiice- for-yo_u r-city -o r- t own . h tm I ), wpaformSa.doc -- rev. 5129114 Page 2 d 2 10 5 0 NOTES PLAN 10 1 inch = 10 ft. 30 1. ELEVATIONS REFER TO THE PLAN BENCHMARK 2. THE AS -BUILT PLAN IS BASED ON SITE CONDITIONS OBSERVED AND SURVEY MEASUREMENTS PERFORMED OF THE COMPLETED MARINE BULKHEAD ON JUNE 2, 2022''`'F*� 3. PERMIT REFERENCE: ORDER OF CONDITIONS - DEP FILE NOS. SE83-2201, 83-2202, 83-2203 °m AS LISTED ON THE PLAN PERRY CIVIL T1�EVER _ W A � SEGMENT I, ANNINO.DWG