HomeMy WebLinkAboutConstruction SequenceBAXTER NYE ENGINEERING & SURVEYING
Registered Professional Engineers and Land Surveyors
1597 Falmouth Rd., Suite 1, Centerville, MA Tel: (508) 771-7502 Email: info@baxter-nye.com
Site Design · Surveying · Subdivisions · Wetland Filings · Planning
March 2, 2023
Mr. Edwin Hoopes, Chairman
Yarmouth Conservation Commission
c/o Brittany DiRienzo, Conservation Administrator
1146 Route 28
South Yarmouth, MA 02664-2231
RE: NOTICE OF INTENT – Boardwalk Modifications
63 Smith Point Drive
West Yarmouth, Massachusetts
Applicants/Owners: Lisa and James Valone
SUPPLEMENTAL INFORMATION FOR CONSTRUCTION PROCESS
Regarding the Notice of Intent (Notice) application for reconstruction of a portion of the existing
boardwalk at 63 Smiths Point Drive in West Yarmouth, Massachusetts, please accept the below
description as construction protocol and sequence:
1. Install the perimeter control wattles at the end of the existing boardwalk.
2. Staging area shall be established on the beach directly at the end of the existing boardwalk and
within the perimeter control wattles and on the existing boardwalk that is to remain.
3. New boardwalk materials will be stored in the staging area on the beach and on the existing
boardwalk that is to remain as needed. Material will also be stored in the back yard of the
existing house.
4. Equipment used will be powered handheld auger for setting new 4”x4” boardwalk posts.
Along with other necessary standard hand tools.
5. Existing boardwalk materials will be stripped by hand and hand carried up the existing
boardwalk to the house location and disposed of properly.
6. New board walk will be constructed by hand.
7. At completion of reconstruction all equipment and materials will be brought up to house and
transported offsite. All trash and excess materials/debris will be disposed of legally and
properly.
8. Wattles/perimeter control will be removed.