Loading...
HomeMy WebLinkAboutCOC request("A PE COD i e E SV (; TEA_J R i/ ( , R.N(-.. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel 508-385-1445 / Fax 508-385-1446 bobPerry0kcaPecod.net February 27, 2023 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: SE83-2202, 30 Homer Ave, So. Yarmouth — Certificate of Compliance Marine Bulkhead To the Conservation Commission, Attached please find Form 8A, an As -built plan and a check in the amount of $75. The As -built plan is inclusive of the 3 properties in the comprehensive seawall project. This project portion was carried out with care and control for the intertidal areas. The planting strip is approximately 7 ft. wide. At the southeast corner of the bulkhead a gravel stone area exists as a quarter circle, likely used for sitting. This area is lacking lawn and does not appear to cause any detriments. This area was previously of an informal grass cover. With acknowledgment of the forgoing, I believe the project warrants favorable consideration for a Certificate of Compliance. Please contact me directly with any questions. Thank you for your assistance with this project. Sincerely, Cape Cod �',ee ` g, Inc. Robert M. P Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE 83-2202 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information Important: When filling out 1 forms on the computer, use only the tab key to move your cursor - do not use the return key. 2 Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. This request is being made by: Cape Cod Engineering, Inc. Name PO Box 1517 Mailing Address East Dennis MA 02641 City/Town State Zip Code 508-385-1445 Phone Number This request is in reference to work regulated by a final Order of Conditions issued to: Jonathan Holden Applicant 8/19/2019 Dated 3. The project site is located at: 30 Homer Ave Street Address 51 Assessors Map/Plat Number SE 83-2202 DEP File Number South Yarmouth City/Town 66 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Carol H. Hoiden, Trustee of the Bass River 2015 Trust Property Owner (if different) Barnstable 32472 287 County Book Page Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5129114 Page f of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE 83-2202 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) ^ 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). if the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see httr)://www mass gov/eea/agencies/massdep/about/contacts/find the massdep regional office for -your -city -or -town. tml). wpaform8a.doc -- rev. 5/29114 Page 2 of 2 10 5 0 PLAN 10 1 inch = 10 ft. 30 NOTES 1. ELEVATIONS REFER TO THE PLAN BENCHMARK 2. THE AS -BUILT PLAN IS BASED ON SITE CONDITIONS OBSERVED AND SURVEY MEASUREMENTS PERFORMED OF THE COMPLETED MARINE BULKHEAD ON JUNE 2, 2022x OFF: 3. PERMIT REFERENCE: ORDER OF CONDITIONS - DEP FILE NOS. SE83-2201, 83-2202, 83-2203 �}qB�. AS LISTED ON THE PLAN PF�ar CIVIL . �sasfl S T ANNINO.DWG