HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
q
Location: A.M. ! tS Lot Zone of Contribution: In Out ✓Acreage ISQ0
57-- Commercial: Residential: 4„...----
Street: /D ea c-ovJ
Village: Floor Plan: L #Bedrooms: 3
Owner: Installer:
Address: /N�!' A/ L'.vte/'/Ot 2
Phone:
Phone:
Builder: Engineer:
Address: Phone:g C c'�r rive Ai �q�
Phone:
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years t/-
3. 4-5 ft of naturally occurring pervious material, above water table V
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands 1 .
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: iz_ `
9.Leaching minimum 100 ft from wetlands Var.: I /
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: / :,
11.Tank/leaching minimum 10 ft from property line Var.: .
12. System meets all other setback requirements Var.: `
13.Uses adjustment for maximum high groundwater Var.: I
.14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: v
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
18. System meets breakout requirements PVC liner: Wall: t/
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use /
23.Minimum 6"stone or compacted below tank and dbox /
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes i
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size L/
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature /
33.H-20 loading is subject to vehicular traffic,groundwater /
34.Title V Application and permit fee,installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house f/
36.Deed Restriction required max. #bedrooms: max. flow: gpd , l'/
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: o;o;