HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out Acreage
Commercial: Residential:
Street:
Villag /C I � � _S-e
Floor Plan: # Bedrooms: 2_
Owner: Installer: 13 3 4ic C.r v,,--t;0 w
Address: Phone:
Phone:
Builder: Engineer:
Address: 4 w-r,.,
Phone:
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table e/
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: I
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: [/
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: V,.•
1 12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: I I
15. System not in top or subsoil (A,B horizons)or 5' removal /
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
_J8. System meets breakout requirements PVC liner: Wall: I `/
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal d"
22. System adequately sized for its intended use I `
23.Minimum 6"stone or compacted below tank and dbox !�
24. Manhole covers within 6"of grade, pump chamber cover to grade �I
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexesi.
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size !f
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking t
30. Buoyancy calculations for tank/pump chamber I ✓ I
31. Engineer to inspect and certify soils: wall: commercial: I -
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V
33.H-20 loading is subject to vehicular traffic,groundwater ,-/-v
34.Title V Application and permit fee, installer signature /
35. Foundation footing min. 2 feet above adjusted ground water for new house ./
36. Deed Restriction required max. #bedrooms: max. flow: gpd I
37. Check area lots for groundwater/Label groundwater in Assessor's Map I
Plan reviewed by: T