Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. //6 Lot 3 0 Zone of Contribution: In Out V Acreage /( C7&0 r //e(/ r // Q � Commercial: Residential: V Street: l /�. f• Village: Floor Plan: !/ #, Bedrooms: 1-/ Owner: Installer: 0 U r Address: Phone: Phone: Builder: Engineer: -A C. ,EN W e e F , Address: Phone: _______ Phone: N/A YES �. NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years ✓ 3. 4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: L. 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck ar.: ' L _ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab .. 9.Leaching minimum 100 ft from wetlands Var.: jV 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: Lj 11.Tank/leaching minimum 10 ft from property line Var.: Z ' 12. System meets all other setback requirements Var.: v 13. Uses adjustm or maximum high groundwater Var.: 1./ 14. Leaching s 4-5 bove ad-. water or bottom of test hole Var.`. / '•-> Lf " 15. System not in top or subsoil(A,B horizons)or 5' removal I/ 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred ' 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade - 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber // 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature (/ 33. H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature 35. Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd j 37. Check area lots for groundwater/Label groundwater in Assessor's Map 11 VPlan reviewed by: - 3 %-4�3