Loading...
HomeMy WebLinkAbout2023 Sign off Transmittal - New Bedroom over new Garage / Septic upgrad MAR Li C [UZ3 HEALTH DEPT. �ci,12 YN TOWI OF YARMOUTH o AI ° HEALTH DEPARTMEI T PERMIT APPLICATIOI SIGI OFF TRAI SMITTAL SHEET To be completed by Applicant: Building Site Location: /6' hactr/0 Proposed Improvement: ,Improvement: -dee Q Cam- q c y w [ new be v r n d- LA 0.100(4 . . - e �`J S-c y't S S`fie v,.� 7 A licant: &/CC)rn cpP �U�V .�� � Tel.No.: �(/� 64/a l Address:'(0__,a o r Date Filed: 3-/—�3 **If you would like e-mail notification of sign off please provide e-mail address: bb 1 lA N I-f G�l/nal/i C OvV) Owner Name: / 1Jé1 &,(c.,,,, J Owner Address:�[ (J �G jyy� Owner Tel.No.:co? 9 siA).- -6 I i5-170 MA- (V?.$ _.____..._...._..._._._.._.._.......___.... .____._.__ .__ RESIDE' TIAL AI D/OR COMMERCIAL BUILDII G HEALTH DEPARTMENT: Determines Compliance to State and Town Regulations; i.e.,Requirements For Septage Disposal and other Public Health Activities. PI se submit three (3) copies of plans, to include: .) Site Plan showing existing buildings,water line location, and septic system location; (2.) Floor plan labeling ALL rooms within building (all existing and proposed)— Note: Floor plans not required for decks,sheds, windows, roofing; (3.) If necessary, Title 5 application signed by licensed installer with fee. REVIEWED BY: - DATE: cY- a3 PLEASE I OTE COMMENTS/CONDITIONS: (rt7 1�10 ��2 W-6' .. 9'•0' 4C-034' MAR J2 Z023 HEALTH DEPT. 4 LOCUS LOCUS MAP SCHEDULE OF ELEVATIONS / FI'�/Se q yRO ,RFi�rq RQ 1 FIRST FLOOR 2 TOP OF FOUNDATION 3 EXISTING PIPE INV. AT FOUNDATION 4 INV. OF PIPE AT SEPTIC TANK INLET 5 INV. OF PIPE AT SEPTIC TANK OUTLET 6 INV. OF PIPE AT D-BOX INLET 7 INV. OF PIPE AT D-BOX OUTLET 8 INV. OF PIPE AT LEACHING FIELD INLET 9 BOTTOM OF LEACHING FIELD 10 TOP OF STONE 11 FINISHED GRADE OVER LEACHING FACILITY 12 FINISHED GRADE OVER D-BOX 13 FINISH GRADE OVER SEPTIC TANK 14 FINISH GRADE AT FOUNDATION 15 BOTTOM OF SEPTIC TANK NOT TO SCALE 16 TOP OF CELLAR FLOOR %J i I DWELLING 1 EX.13.5 2 TBD 3 EX. 9.93 16 TBD ' . ,1.. ' EXISTING BUILDING SEWER NOTES 1 - BUILDING SEWER PIPE INVERT ELEVATION TO BE CONFIRMED PRIOR TO CONSTRUCTION. CONTACT ENGINEER IF INVERT ELEVATION IS LOWER THAN SHOWN. N/F RUTH PAPPAS REVOCABLE TRUST (017 - 21) 1 4 1 9.55 1 1 151 4.80 1 SEWAGE SYSTEM PROFILE & DETAILS NOT TO SCALE 113 111.5 1 1 5 1 9.30 1 NOTES: 1. FURNISH RISERS TO SET COVERS WITHIN 6 INCHES OF FINISH GRADE. DB SEPTIC SYSTEM NOTES Z. H-10 SEPTIC TANK AND CHAMBERS AND H-20 DISTRIBUTION BOX ( - OX), AND SCHEDULE 40 PVC PIPE THROUGHOUT. 1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE STATE 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A TRENCH PERMIT FROM THE LOCAL MUNICIPALITY IN ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.00), AND THE LOCAL BOARD OF WHICH THE WORK IS BEING PERFORMED. HEALTH. 4. QUICK 4 PLUS STANDARD LP CHAMBER: MASS DEP GENERAL USE APPROVAL, TRANSMITTAL NUMBER X259183 5. QUICK 4 PLUS CHAMBERS TO BE INSTALLED WITHOUT AGGREGATE IN ACCORDANCE DEP APPROVAL 2. THERE SHALL BE NO CHANGES MADE IN THIS PLAN WITHOUT THE WRITTEN DATED JUNE 12, 2015 TRANSMITTAL NUMBER X264258 PERMISSION OF THE ENGINEER AND LOCAL BOARD OF HEALTH. 1 10 1 9.27 1 MIN. 9" COVER H-20 "D" BOX FIRST 2' SHALL W/ SPEED BE SET LEVEL LEVELERS S=0.01 MIN. L=13' S=0.01 MIN. L=VARIES O O o - SCH. 40 PVC TEES � o GAS BAFFLE v 6 9.15 7 8.98 8 8.88 1500 GALLON SEPTIC TANK 9 &60 H-10 PRODUCT - SHOREY PRECAST MODEL OR EQUAL APPROXIMATE LOCATION OF EXISTING WATER MAIN N/F RAYMOND CERICOLA (017 - 40) 6" MIN. CRUSHED STONE BASE NOTE: THIS LEACHING FACILITY IS NOT DESIGNED FOR H-20 LOADS AND SHALL NOT BE DRIVEN UPON. ESTABLISH VEGETATIVE COVER / l/ 1�11 \W �1/ \W 34" TOTAL LENGTH = 19'-6" LEACHING BED CROSS SECTION NOT TO SCALE GEOGRID (BX1100) UNDER CHAMBERS TO MINIMIZE SETTLEMENT 0 10 20 40 SCALE: 1 " = 20' 3. ALL ERRORS, OMISSIONS, AND CHANGE OF CONDITIONS AT THE SITE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PERFORMING THE OBSERVATION PORT RELATED WORK. S=2% MINIMUM FILTER FABRIC 4. ALL DISTURBED AREAS ARE TO BE LOAAED, SEEDED AND MAINTAINED TO 11 11t PREVENT EROSION. 15' MIN. BREAKOUT 5. FOR PROPER PERFORMANCE, SEPTIC TANK SHOULD BE INSPECTED AT LEAST ONCE A YEAR AND WHEN THE TOTAL DEPTH OF SCUM AND SOLIDS EXCEEDS 1/3 THE LIQUID DEPTH OF THE TANK, THE TANK SHOULD BE PUMPED. BACK FILL WITH CLEAN FILL 6. THIS SYSTEM HAS BEEN DESIGNED FROM DATA REVIEWED AND 9" MIN. 36" MAX. 3.5" ENDCAP ACKNOWLEDGED BY THE MASS. D.E.P. AND THE LOCAL BOARD OF HEALTH; 5' STRIPOUT AND CONFORMS WITH THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE 5. NO GUARANTEE OF PERFORMANCE IS EXPRESSED OR IMPLIED. 7. TEST HOLE INFORMATION SHOWN HEREON IS LIMITED TO SOIL CONDITIONS 7 CHAMBERS @ 4' = 28.0' FOUND AT THAT PARTICULAR TEST HOLE LOCATIONS AND IS NOT CONSIDERED AN IMPLIED OR EXPRESSED WARRANTY OF SOIL CONDITIONS BEYOND LIMITS OF SUCH TEST HOLES. Z g 5? USE (42) QUICK 4 PLUS STANDARD LP (0 CHAMBERS INSTALLED IN A 6 ROW 8. ALL ORGANIC AND UNSUITABLE MATERIAL MUST BE REMOVED FROM THE n BED CONFIGURATION AREA DIRECTLY UNDER AND 5 FEET BEYOND THE PROPOSED LEACHING TOTAL LENGTH = 28.0' (28.75' w/ END CAPS) FACILITY. THIS AREA MUST BE BACKFILLED TO THE ELEVATIONS INDICATED ON OBSERVED GROUNDWATER EL.= 3.5't (NAVD88) V t TOTAL WIDTH = 19.5' THESE PLANS WITH SELECT ON -SITE OR IMPORTED SOIL MATERIAL, CONSISTING OF CLEAN GRANULAR SAND OR OTHER GRANULAR MATERIAL, REDOX FEATURES OBSERVED FREE FROM ORGANIC MATTER AND OTHER DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS SHALL NOT BE USED. THE FILL MATERIAL SHALL TEST PIT BOTTOM @ EL. 1.7' NAVD88 CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 - 310 CMR SECTION 15.255 (3) AND SHALL HAVE PERCOLATION RATE OF BETWEEN TWO AND FIVE MINUTES PER INCH, BEFORE AND AFTER PLACEMENT. 9. ALL STONE MUST BE DOUBLE WASHED AND FREE FROM FINES AND ANY ORGANIC MATERIAL AND MUST HAVE LESS THAN 0.2 PERCENT MATERIAL FINER DESIGN DATA THAN A NUMBER 200 SIEVE. 10. THE DESIGNER HAS NOT BEEN RETAINED BY THE CLIENT TO CONSTRUCT OR 1. TYPE OF ESTABLISHMENT: EX. 3 BEDROOM, PROPOSED 5 BEDROOM SINGLE FAMILY RESIDENCE SUPERVISE THE CONSTRUCTION OF THE SYSTEM. THE CONTRACTOR IS 2. SEWAGE SYSTEM DESIGN FLOW: 110 GALLONS PER BEDROOM = 110 x 5 = 550 GPD RESPONSIBLE FOR MAKING ARRANGEMENTS FOR INSPECTION OF INSTALLATION OF THE SYSTEM WITH THE LOCAL BOARD OF HEALTH. 3. WILL THERE BE A GARBAGE GRINDER: NO 4. SEPTIC TANK CAPACITY REQUIRED, MINIMUM OF 200% OF DESIGN FLOW OR 1,500 GAL. 11. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL CONTROL OF ALL SYSTEM COMPONENTS. = 200% x 550 GALLON = 1,100 GALLON (USE 1,500 GALLON MINIMUM) 5. DESIGN PERCOLATION RATE: LESS THAN 2 MINUTES PER INCH 12. TIGHT JOINT PIPING MATERIAL TO CONSIST OF POLYVINYL CHLORIDE (P.V.C.) SCHEDULE 40, UNLESS OTHERWISE NOTED. 6. SOIL ABSORPTION SYSTEM TYPE: QUICK 4 STANDARD LP BED CONFIGURATION 7. LEACHING AREA REQUIRED: MINIMUM 550 GPD / (0.74 GPD/S.F., CLASS I SOIL) = 744 S.F. 13. THE CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER FOR CONSTRUCTION INSPECTION AFTER EXCAVATION FOR THE LEACHING BED (PRIOR TO THE 8. LEACHING SYSTEM PROPOSED: 6 ROWS OF 7 CHAMBERS IN A 28.0' LONG BED PLACEMENT OF STONE) AND ALSO AFTER PLACEMENT OF PIPE & STONE PRIOR EFFECTIVE LEACHING AREA PER LINEAL FEET = 4.73 S.F. / L.F. OF CHAMBER TO BACKFILLING. TOTAL LENGTH PROPOSED = 6 X 28.0' = 168.0 L.F. 14. DESIGN ENGINEER SHALL CERTIFY CONSTRUCTION OF SYSTEM AND TOTAL AREA PROPOSED = 168.0 L.F. x 4.73 S.F. / L.F. = 794.6 S.F. MATERIALS INSTALLED. THE CONTRACTOR SHALL PROVIDE A SIEVE ANALYSIS OF THE FILL MATERIAL REQUIRED. AN AS -BUILT PLAN SHALL BE SUBMITTED TO 9. LEACHING SYSTEM CAPACITY PROPOSED = 794.6 S.F. x 0.74 GPD/S.F. = 588 GPD THE LOCAL BOARD OF HEALTH UPON COMPLETION. SOIL EVALUATOR'S LOG 15. NO RUBBER TIRE CONSTRUCTION MACHINERY SHALL DRIVE OVER THE PROPOSED SEPTIC BED EXCAVATION DURING CONSTRUCTION. Depth from surface in inches Soil Horizon Soil Texture (USDA) Soil Color (Munsell) Soil Mottles and Depth Other Relative Factors DEEP OBSERVATION HOLE TP, ELEVATION 11.1 0 - 10" A LOAMY SAND 10 YR 4/4 10" - 31" B LOAMY SAND 2.5 YR 5/6 31"-113" C MEDIUM SAND 2.5 YR 6/4 PERCOLATION RATE = < 2 MINUTES / INCH IN C LAYER DEPTH TO GROUNDWATER = 106" TO WATER LEVEL, 92" TO REDOX OBSERVATIONS BY L CARREIRO WITNESSED BY JAY GAR.DINER DATE TESTED JULY 12. 2022 GENERAL NOTES LOCATIONS ARE BASED ON AN "ON THE GROUND" INSTRUMENT SURVEY SPOT ELEVATIONS BASED ON THE NAVD 1988 DATUM, AND CONTOURS BASED ON 2011 NOAA LIDAR COORDINATE SYSTEM USED IS THE MA -MAINLAND COORDINATE SYSTEM DATUM: NAD 83, UNITS U S SURVEY FEET DIMENSIONS OF EXISTING BUILDINGS AND BUILDING OFFSETS SHOWN HEREON ARE TO CORNER BOARDS OR SIDING EXTENTS AND ARE DISPLAYED IN ENGINEERING UNITS WITH A PRECISION OF ONE TENTH (0.1') OF AFOOT. THE FINISHED FLOOR ELEVATION (FIN. FL. EL.) SHOWN HEREON IS BASED ON AN ASSUMED 1" LOWER THAN THE SURVEYED THRESHOLD ELEVATION. AN INTERIOR INSPECTION OF BUILDINGS WAS NOT PERFORMED. ZONING DISTRICT: R-25 PROPERTY IS LOCATED WITHIN AN AREA HAVING AZONE DESIGNATION OF X(500YR 1 AND AE(EL.11) BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA). ON FLOOD INSURANCE RATE MAP NO. 25001 C07##, WITH A MAP EFFECTIVE DATE OF JULY 16, 2014 WIND EXPOSURE CATEGORY: ZONE C LOT COVERAGE: LOT AREA = 14,108t S. F EXISTING LOT COVERAGE BY STRUCTURES (HOUSE AND DECK = 1565t S.F. (11.1%) PROPOSED LOT COVERAGE BY STRUCTURES (HOUSE, GARAGE & SHED = 2447t S.F. (17.4%) DEED REFERENCE: DB 22683, PG 5 PLAM REFERENCE PB 58 PG 21 OWNER: KEVIN A. BALCOM & KATHLEEN BALCOM 810 ADAMS STREET HOLLISTON, MA01748 16. DIG -SAFE AND ALL OTHER NECESSARY AUTHORITIES SHALL BE NOTIFIED FOR THE PROPER LOCATION OF EXISTING UTILITIES PRIOR TO ANY EXCAVATION. 17. WATER SERVICE LINE SHALL BE LOCATED AND MARKED PRIOR TO ANY EXCAVATING AND 10' MIN. SETBACK DISTANCE FROM SAID SERVICE TO THE SEPTIC SYSTEM SHALL BE MAINTAINED. 18. ALL WATER LINES WITHIN 10' OF SEPTIC SYSTEM COMPONENTS SHALL BE SLEEVED WITHIN 4" PVC SCHEDULE 40 PIPE. Yarmouth Health Department PROVED Iv.,...e Date N. DOUGLAS SCHNEIDER CIVIL No. 38540 N.DOUGLAS SCHNEIDER No.47383 '5; NOTICE THIS PLAN MAY NOT BE ADDED TO, DELETED FROM, OR ALTERED IN ANY WAY BY ANYONE OTHER THAN HOLMES AND MCGRATH. UNLESS AND UNTIL SUCH TIME AS AN ORIGINAL (RED) STAMP APPEARS ON THIS PLAN NO PERSON OR PERSONS, MUNICIPAL OR PUBLIC OFFICIAL MAY RELY UPON THE INFORMATION CONTAINED HEREIN, AND THIS PLAN REMAINS THE PROPERTY OF HOLMES AND MCGRATH. COPYRIGHT (C) BY HOLMES & MCGRATH. ALL RIGHTS RESERVED 9/19/22 REVISE GARAGE LAYOUT LAC DATE DESCRIPTION Drawn Checked REVISIONS PLAN OF PROPOSED SEWAGE DISPOSAL SYSTEM PREPARED FOR KEVIN & KATHLEEN BALCOM LOT 41, #16 ANDRINA ROAD IN WEST YARMOUTH, MA SCALE: 1 "=20' DATE: SEPT. 7, 2022 s La L=�� 0holmes and mcgrath VAR U2 civil engineers and land surveyors 205 worcester court • suite a4 • falmouth, ma • 02540 HEALTH I 508-548-3564 www.holmesandmcgrath.com DRAWN: WNH ICHECKED. ASSESSORS INFORMATION: 017-41 1 SHEET 1 OF 1 2 MAR 0 2 Z023 HEALTH DEPT. Co MRS MRS DOUBLE OUBLE HUNG On DOUBLE OUBLE HUNG On I DO1 2468 i 1 2 2468 R IN 002 2868 2 - 2 2868 RIN 00 0 a D03 3068 1 i 3068 R EX D04 3G68 1 1 3068 R IN LD05 2468 1 2 2 468 L 0000 0000 DO6,MU 2 q09, 0000 0000 DATE/ REVISIO 11 /03/2022 11 /11 /2022 11 /16/2022 12/11/2022 zo N 25' q'-2 1 /4" 5'-3 1 /2" --� 15-6 1 /4" 3'-6 5/4" 2'-1 1 /411 - 4'-q 1 /2" 4'-4 3/4" 6-1 1 /2" 4'-q 1 /2" -3 l'-5 3/4" --------- --�--- -- ------ ---- 1 OFFICE q'-2 1 /4" D02 CLOSET l3 BEDROOM O 0 BATH D05 SD (� I o� I GD 002 - 5-3 1 /2" LIVING ROOM 5D G� W02 W02 W02 W02 ----------- ------ ------ ---- 4'-q 1 /2" 6-1 1 /2" 6'-21 6'-1 1 /2" 4'-q 1 /2" 28' SFGOND FLUOR PLAN SCALE: 1 /4" = 12" zo N NPIC.AI RnOF/CFILIN� 3/12 PITCH MANUFACTURED ROOF TRU55E5 a 6" OVERHANG @ GABLE AND EAVE5 ASPHALT 5HI NGLES ICE AND WATER BARRIER 5UP FROM EAVE5 1/2' ZIP WALL SHEATHING R-49 BLOWN IN INSULATION VAPOR BARRIER 1l2' GYP. BD. 10/12 PITCH OVERFRAME ® GABLE FN05 12- OVERHANG ® GABLE AND EAVES AL FLOOR & G 5UBFLOOR GLUED AND 5CREWED I FLOOR.:OIST5 ® 16' O.G. IBERGLA55 BATT INSULATION POLY VAPOR BARRIER YPE'X' GYPSUM BOARD IC.AI wAl l CnN5TR�IC.TION IAR SHAKE SIDING 5' EXPOSURE ZIP WALL SHEATHING 65TUD WALL I FIBERGLA55 BATT INSULATION .Y VAPOR BARRIER TYP'X' GYP. BD. TTOM PLATE ON 2 X 6 TREATED PLATE ICHOR BOLTS CAST IN PLACE ® 72' 0.6 'ROM ENDS AND 5PLICE5 X POURED GONG. WALL OW5 OF REBAR 'GONG. FOOTING w/ (2) ROWS OF REBAR CHAIRED & TIED YVALL SECTION VIEN SCALE: 1 /4" = 12" m DATE/ REVISION' 11 /03/2022 11/11/2022 11/16/2022 12/1-1/2022