Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 12'S Lot 11 Zone of Contribution: In Out X Acreage 0•'S? Commercial: Residential: •,/ Street: 'S(Q 1 M C.0 1V_ S tree:* Village: ("la,.mpu,pp(-1.., Floor Plan: . i� #Bedrooms: 3 Owner: ,,., lc S Installer: 'fit 4' ter Address: Phone: Phone: Builder: Engineer: b t 4 tT Address: Phone: Phone: N/A YES, NO 1.Required#of copies received ✓ 2.Date of soils exam and percolation test not older than 2 years 7 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: / 6.Benchmark indicated and shown-NGVD if near wetlands ,,/ 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i/ 9.Leaching minimum 100 ft from wetlands Var.: f 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: / 12. System meets all other setback requirements Var.: r/ 13.Uses adjustment for maximum high groundwater Var.: / 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/ 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable V 17. System meets slope requirements-min. 1/8", %"preferred V 18. System meets breakout requirements PVC liner: Wall: ,� 19. Specified tee sizes are proper, gas baffle on outlet tee _ / 1 20. Sewage is under 10,000 gpd for parcel / 21.No garbage disposal r 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 1 t/ 24. Manhole covers within 6"of grade,pump chamber cover to grade ,/ 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes / 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed V 29. Vent provided if leaching below 3 feet,under driveway/parking / 30.Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater / / 34.Title V Application and permit fee,installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ,/ 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ z 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: S 0'f-4.1-) **A-A 5 Ziff,24)zZ 6 03 03