HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 0 57 Lot cc.).... Zone of Contribution: In Out ----Acreage /' Sf 0
Commercial: Residential:
Street: J Y !J' rn6 a r L v r x
Village: Floor Plan: # Bedrooms: 171
Owner: Installer: f
Address: . .S7 I., e<�
Phone:
Phone:
Builder: Engineer:_ y e r ,Y s(),-1...;
Address: _ Phone:
Phone:
N/A YES NO
1. Required#of copies received 4/
2. Date of soils exam and percolation test not older than 2 years z/
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands ,/
7. Septic tank minimum 10 ft from foundation, deck Var.: `
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: /
13. Uses adjustment for maximum high groundwater Var.: •
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.` y
15. System not in top or subsoil(A,B horizons)or 5' removal ,/
16. Proposed contours are suitable d7
17. System meets slope requirements-min. 1/8", 1/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
/
22. System adequately sized for its intended use V
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size I_.
28. Septic tank/pump chamber to be factory waterproofed v�`�
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature , )/
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee,installer signature
35. Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd v
37. Check area lots for groundwater/Label groundwater in Assessor's Map �/
Plan reviewed by: 1 o;o: