Loading...
HomeMy WebLinkAbout41 Uncle Roberts plans 23SHEAR WALL NOTES: Shear Wall "A" Construction ( see plan for dimensions ) -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 6" on center around the perimeter of the shear wall dimensions and all interior joints. Note: Plywood to span vertically from floor to roof or provide solid blocking at all horizontal - -' °- -1_ _� __ ___a__ n..,..,:,r,. Q A ,.,,m&",.., nails spaced at 12" on center a Isewhere . Foundation to second floor -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 6" on center around Note: Plywood to span vertically between floors or provide solid blocking at all horizo ntal pli nails spaced at 12" on center elsewhere. -Connect the 2 -2x6 studs at either end of the shear wall to the foundation with a Simpson HDU5-SI foundation shoe, connected to the 2 -2x6 studs with (14) Simpson SIDS W x 2 -1/2" screws, and concrete a minimum of 8". Provide solid blocking between the underside of the first floor and the to Shear W all "B" Construction ( see plan for dimensions ) Second tioor to the double top plate or the unaerSlae or the rooT PIYWOOa -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2 exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center around Note: Plywood to span vertically from floor to roof or provide solid blocking at all horizontal nails spaced at 12 on center elsewhere. SHEAR WALL NOTES CONT.0 Foundation to second floor j -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center arounc Note: Plywood to span vertically between floors or provide solid blocking at all horizontal pl, nails spaced at 12" on center elsewhere. -Connect the 2-2x6 studs at either end of the shear wall to the foundation with a Simpson HDU5 - foundation shoe, connected to the 2-2x6 studs with (14) Simpson SIDS W x 2 -1/2" screws, and concrete a minimum of 8". Provide solid blocking between the underside of the first floor and the t Shear Wall " C" Construction ( see plan for dimensions ) Second floor to the double top plate or the underside of the roof plywood -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center arourn Note: Plywood to span vertically from floor to roof or provide solid blocking at all horizont, nails spaced at 12" on center a Isewhere . Foundation to second floor -2x6 studs spaced at 16" on center with 2-2x6 studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center arounl Note: Plywood t o span vertically between floors or provide solid blocking at all horizontal nails spaced at 12" on center elsewhere. -Connect the 2-2x6 studs at the exterior end of the shear wall to the foundation with a Simpson I shoe, connected to then -2x6 studs with (14) Simpson SIDS W x 2 -1/2" screws, and connected minimum of 8". Provide solid blocking between the underside of the first floor and the top of the fo -Connect the inside end of the shear wall to the beam below with (4) Simpson LSTA24 straps cei Shear Wall "D" Construction (see plan for dimensions) Braced Wall " PFH " Construction ( see plan for dimensions ) (see Figure R602.10.6.2 in IRC Foundation to the underside of the roof plywood -2x6 studs spaced at 16" on center with 2-2x6 jack studs at each end. -1/2" exterior grade plywood (minimum) nailed w/8d common nails spaced at 3" on center around the perimeter of the shear wall dimensions and all interior joints. Note: Ply wood to span vertically between the floor and roof or provide solid blocking at all horizontal plywood joints nailed at 3" on center (staggered). Provide 8d common nails spaced at 12" on center elsewhere. -The door header shall span continuously from the corner to the double stud located on the other side of the op en ing.. -Connect the 2-2x6 jack studs at corner end of the braced wall to the foundation with a Simpson HDU 5-SDS2.5 holdown. The holdown shall be located on top of the first floor shoe, connected to the 2-2x6 studs with ( 14) Simpson SIDS W x 2 -1/2" screws, and connected to the concrete with a 5/8" diameter anchor bolt epo xied into the concrete a minimum of 8". -Provide one additional W diameter anchor bolts equally spaced between the end wall and the jack. studs with washer plates 3/16" x 2" x 2" (8" minimum embedment). -Connect the opposite side jack studs to the foundation with a Simpson HDU2-SDS2.5 holdown. The holdown shall be located on top of the foundation shoe, connected to the 2-2x6 studs with (6) Simpson SIDS W x 2-1/2" screws, and connected to the concrete with a 5/8" diameter ancho r bolt epoxied into the concrete a minimum of 8". SECOND FLOOR SHEAR WALL PLAN PERMIT SET 12*01*2022 archUhIA5 architects interior designers builders 299 WHITE'S PATH SOUTH YARMOUTH, MASSACHUSETTS, 02664 tel (508) 362 - 8883 (508) 760 - 2800 fax (508) 760 - 5800 WWW.ERTARCHITECTS.COM NEW RESIDENCE FOR: PETER ROBERTA 41 UNCLE, ROBERT S ROAD WEST YA R M OU TH , I PROJECT # 210422 2022 ERT ARCHITECTS, INC. THE DRAWINGS AND ALL OF THE IDEAS, ARRANGEMENTS, DESIGNS, AND PLANS INDICATED THEREON OR REPRESENTED THEREBY, ARE OWNED BY AND REMAIN THE PROPERTY OF ERT ARCHITECTS, INC. NO PART THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE, EXCEPT WITH SPECIFIC WRITTEN PERMISSION OF THE FIRM ERT ARCHITECTS, INC. THESE PLANS ARE NOT TO BE USED FOR PERMITTING OR CONSTRUCTION PURPOSES UNLESS STAMPED & SIGNED WITH AN ORIGINAL ARCHITECT'S STAMP AND SIGNATURE & MARKED AS "PERMIT SET" OR "CONSTRUCTION SET". REGISTRATIO REVISIONS DATE: REVISIONS: ISSUED FOR: PERMITTING DATE: 12.01.2022 PROJECT TRUE SCALE: 1 /4"=V-0" 0 1 2 4 8 UNLESS OTHERWISE NOTED. SHEET NO. SW*2 TOTAL NUMBER OF SHEETS IN SET: 38 THIS SHEET INVALID UNLESS ACCOMPANIED BY A COMPLETE SET OF WORKING DRAWINGS