Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Le Lot /I Zone of Contribution: In )( Out_ Acreage (� I'�dWt �O(7f P Commercial: Residential: Street: . Village: W{4 f yterp/44444, /Mit Floor Plan: #Bedrooms: 1- - Owner: Installer: Address: Phone: Phone: Builder: Engineer: S C Address: Phone: c-d 77 a sn/A Phone: N/A YES ,,,.-NO 1.Required#of copies received CV. 2. Date of soils exam and percolation test not older than 2 years t/ 3. 4-5 ft of naturally occurring pervious material, above water table t . 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown=NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: �+ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: t/ 11. Tank/leaching minimum 10 ft from property line Var.: ystem meets all other setback requirements Var.: Uses adjustment for maximum high groundwater Var.: 1. COLeaching set 4-5 ft above adj. water or bottom of test hole Var.: , 9' 15. System not in top or subsoil(A,B horizons)or 5' removal ,.7 16.Proposed contours are suitable 7. System meets slope requirements—min. 1/8", �'A"preferred / El S stem meets breakout requirements PVC liner: ✓ Wall: I./ ' Specified tee sizes are proper, gas baffle on outlet tee qp co14,0}“A 0. Sewage is under 10,000 gpd for parcel ✓r 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade IV 5 jnspection port on plastic chambers/leach field lectrical permit for pump chamber/Separate meter for duplexes 2Pump system-2" line,weep hole,check valve,tee in dbox, pump size ✓ (8 eptic tank/pump chamber to be factory waterproofed ' Vent provided if leaching below 3 feet, under driveway/parking t/-- (4( :uoyancy calculations for tank/pump chamber 1. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 3..,,.�H-20 loading is subject to vehicular traffic, groundwater 3 itle V Application and permit fee, installer signature . Oft ✓ oundation footing min. 2 feet above adjusted ground water for new house ✓' 36. eed Restriction required max. Z_ #bedrooms: max. flow: gpd f . Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: rA114, Z j 21 120 6/03/03