3/17/2023
SUNRUN
Subject: Post Installation Approval Letter
Project Info:223R-040FRAN
, 40 Bettys Path, West Yarmouth, MA 02673, USA
Attn: To Whom It May Concern
The purpose of the review was to verify the installation is in conformance with what was specified in the
published plan set and that any potential modifications from those plans are adequate under the
existing structural calculations.
After reviewing the installation, the footings and flashings of the PV panels were installed in
conformance with the above plan set and specifications for this project. The installations comply with
the provisions listed below.
Design Criteria:
780 CMR (2015 IBC) (ASCE 7-10)
Basic Wind Speed Vult = 141 mph
Ground Snow Load = 30 psf
If you have any further questions on the above for mentioned, please do not hesitate to contact.
Current Renewables Engineering Inc.
Professional Engineer
info@currentrenewableseng.com
Exp: 6/30/2024
CIVIL
NO. 56313
VAOSMS IA
GHAHR
STAMPED 03/15/2023