Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD-23-002106
/rWie4". ONE & TWO FAMILY ONLY-BUILDING PERMIT Town of Yarmouth Building Department 1146 Route 28,South Yarmouth,MA 02664-4492 508-398-2231 ext. 1261 Fax 508-398-0836 {if,- !IPIA Massachusetts State Building Code,780 CMR �' Building Permit Application To Construct,Repair, Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Use Only r - Building Permit Number: s — j Date Applied: OCT 1 9 z�Z - ___ Build g Official(P • t Name) /G� F Pq ti T N 7 ignature SECTION :SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 229 Great Western Rd 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards I Rear Yard Required I Provided Required Provided Required Provided I1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private CIZone: _ Outside Flood Zone? Check if yes❑ Municipal IDOn site disposal system 0 SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Justin Emerald South Yarmouth, MA 02664 Name(Print) City,State,ZIP 229 Great Western Rd 774-368-0447 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction Cl I Existing Building 0 I Owner-Occupied 0 I Repairs(s) 0 I Alteration(s) 0 I Addition 0 Demolition ❑ I Accessory Bldg. 0 I Number of Units I Other ❑ Specify: Brief Description of Proposed Work2: _ Install 13.2 kw solar panels on roof. Will not exceed roof panel but will add 6"to roof height. 33 total panels. SECTION 4:ESTIMATED CONSTRUCTION COSTS. Item Estimated Costs: • (Labor and Materials) Official Use Only I.Building $ 4830.00 1. Building Permit Fee:$J_Indicate how fee is determined: 2.Electrical $ 64170.00 ❑Standard City/Town Application Fee 3 Plumbing $ 0 Total Project Cost3(Item 6)x multiplier x 2. Other Fees: $ 4.Mechanical (HVAC) $ List: C a l D I 5.Mechanical (Fire • / Suppression) $ Total All Fees:$ Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ 69000.00 0 Paid in Full ©Outstanding Balance Due: c a SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) Bruce A Junior-Trinity Solar Inc CSFA-067961 07/13/2024 Name of CSL Holder License Number Expiration ea ea 20 Patterson Brook Road Unit 1 List CSL Type(see below) R No.and Street Type Description W Wareham, MA 02576 U i Unrestricted(Buildings up to 35,000 cu.ft.) City/Town,State,ZIP R Restricted 1&2 Family Dwellin• M Masonry RC Roofing Coverin WS Window and Sidin• 732-722-1278 SF Solid Fuel Burning Appliances permits.wareham@trinity-solar com Insulation Telephone Email address 5.2 Registered Home Improvement Contractor CHIC) D Demolition Bruce AJunior-Trinity Solar Inc 170355 10/11/2023 HIC Company Name or HIC Registrant Name HIC Registration Number Expiration Date P tterson Brook Road Unit 1 No.and Street permits.wareham@trinity-solar.com W Wareham, MA 02576 732-722-1278 Email address City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? yes X 0 No 0 SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Bruce A Junior to act on my behalf,in all matters relative to work authorized by this building permit application. 10/5/2022 Print Owner's Name(E onic Sign ure) Date • SECTION 7b: OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Bruce A Junior Print Owner's or Authorized Agent's N lectron c Signer 10/5/2022 Date 1. An Owner who obtains a building permit to do his/her s/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will nor have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.sov/oca Information on the Construction Supervisor License can be found at www.mass gov/d s 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Number of fireplaces Habitable room count Number of bedrooms Number of bathrooms Type of heating system Number of half/baths Type of cooling system Number of decks/porches Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" ®•4C�O,RG) I CERTIFICATE OF LIABILITY INSURANCE DATE(MMDD/YYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON5 CERTIFICATE LDER.22 THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Arthur J. Gallagher Risk Management Services, Inc. PHON: Mark Grasela 4000 Midlantic Drive Suite 200 A/CC.N o,Eat):856-482-9900 FAX No):856-482-1888 Mount Laurel NJ 08054 E-MAIL ADDRESS: CherryHill.BSD.CertM@AJG.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Gotham Insurance Company 25569 INSURED TRINHEA-03 Trinity Solar Inc. INSURER e:National Union Fire Insurance Company of Pittsburg 19445 INSURERC:Liberty International Underwriters 20 Patterson Brook Road, Unit 1 W. Wareham, MA 02576 INSURERD: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:590414193 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR EFF POLICY LTR TYPE OF INSURANCE !NWWVD POLICY NUMBER (MMDDV/YYYY) (MMDD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY GL202100013378 6/1/2021 6/1/2023 EACH OCCURRENCE $2,000,000 CLAIMS-MADE X OCCUR DAMAGE TO RENTED PREMISES(Ea occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL BADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X JECOT- LOC GENERAL AGGREGATE $2,000,000 PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY CA 2960145 6/1/2022 6/1/2023 COMBINED SINGLE LIMIT X ANY AUTO (Ea accident) $2,000,000 OWNED BODILY INJURY(Per person) $ SCHEDULED AUTOS ONLY AUTOS BODILY INJURY(Per acddent) $ HIRED NON-OWNED AUTOS ONLY AUTOS ONLY PROPERTY DAMAGE $ (Per acddent) $ A UMBRELLALIAB X OCCUR EX202100001871 6/1/2021 6/1/2023 EACH OCCURRENCE $5,000,000 C ELD30006989101 C X EXCESS LIAB CLAIMS-MADE 1000231834-06 6/1/2022 6/1/2023 6/1/2022 6/1/2023 AGGREGATE $5,000,000 DED RETENTION$ B WORKERS COMPENSATION Limit x of$5,000,000 $19,000,000 WC 13588108 6/1/2022 6/1/2023PER AND EMPLOYERS'LIABILITY X OTH- Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? I I N/A E.L.EACH ACCIDENT $1,000,000 (Mandatory in NH) If yes,describe under E.L.DISEASE-EA EMPLOYEE $1,000,000 DESCRIPTION OF OPERATIONS below B Automobile E.L.DISEASE-POLICY LIMIT $1,000,000 Comp/Collusion Detl. CA 2960145 6/1/2022 6/1/2023 All Other Units $250/500 Truck-Tractors and Semi-Trailers $250/500 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Evidence of Insurance CERTIFICATE HOLDER CANCELLATION — SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Evidence of Insurance AUTHORIZED REPRESENTATIVE ap.,..) V#1, "2„.... ACORD 25(2016/03) The ACORD name and logo are registered mar ssof ACORD CORPORATION. All rights reserved. c The Commonwealth of Massachusetts Department of Industrial Accidents l ' Office of Investigations A Lafayette City Center 2 Avenue de Lafayette, Boston,MA 02111-1750 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Trinity Solar Inc Address: 2211 Allenwood Road City/State/Zip: Wall, New Jersey 07719 Phone #: Are you an employer? Check the appropriate box: 1.VI am a employer with 300 4. ElI am a general contractor and I Type of project(required): employees (full and/or part-time).* have hired the sub-contractors 6. New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.* 9• ❑ Building addition required.] 5. ❑ We are a corporation and its 10.4Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *My applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: American Guarantee and Liability Ins Co Policy#or Self-ins. Lic. #: WC 13588107 Expiration Date: 06/01/2023 Job Site Address: 229 Great Western Rd City/State/Zip: S.Yarmouth, MA 02664 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Signature: Date: 10/5/2022 Phone#: (508) 291-0007 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(check one): 10Board of Health 20 Building Department 3.0City/Town Clerk 4.0 Electrical Inspector 50Plumbin Inspector 6.0Other g Contact Person: Phone#: L i r S o C, PC f0 r C.) re C � th C L G N C A 0 ��N 2 W O ��o < ° c ) O tB ci ec I. 1 " _� Q N N `- 0) ri°`$- Jul dto - 0 � am agg o- otli o's c< Z::b 1 o t7 aZ e; - -„ _c m > c z8. p WQ ._, cv A) W...8.0 0 L ,2 E aaKiam z o0 Om oo o mU � ? s co 12 UW o I a) I U = Or = U m O o c N m ix O amQC 4 cz Zoo z t Q Q }e a owzW� i Za o p e' L}.�J XCQJ z¢.-� -u 2 zQ °3- m(71< 0,� O ate} ZZns�F—ONS 0 C = 5 OOS I-8 �� z�� � � 3 Rm a RW I-0 mN3 2 csi § flj ; P. 2§§ 0$ $TON q ^\ on . iI4 ?) '�/l T u0I8 PH t 0 . co g t §TOWN OF YARMOUTH 1146 Route 28, South Yarmouth, MA 02664 508-398-223[1 ext.-1261 Fax 508-398-0836 Office of the Building Commissioner BUILDING DEPARTMENT DEMOLITION DEBRIS DISPOSAL AFFIDAVIT Pursuant to M.G.L. Ch. 40, §54 and 780 CMR- Section 105.3.1. #4. I hereby certify that the debris resulting from the proposed work/demolition to be conducted at 229 Great Western Rd S Yarmouth, MA 02664 Work Address Is to be disposed of oat the following location: 20 Patterson Brook Rd Unit 1 W. Wareham, MA Said disposal site shall be a licensed solid waste facility as defined by M.G.L. Ch. 111, §150A. 10/5/2022 Signatur of App is Date Permit No. i � ONE or TWO FAMILY— BULDING PERMIT APPLICATION REGULATORY APPROVALS NOTICE Address of Proposed Work: 229 Great Western Rd South Yarmouth, MA 02664 Scope of Proposed Work: Install 13.2 kw solar panels on roof. Will not exceed roof panel, but will add 6"to roof height. 33 total panels. Date: 10/5/2022 Based on the scope of work described above, the applicant is required to obtain approval sign- offs from the following departments as checked-of below: Health Dept. —508-398-2231 ext. 1241 Conservation—508-398-2231 ext. 1288 Water Dept. —99 Buck Island Road, 508-771-7921 Old Kings HWY. Hist. Comm. —508-398-22631 ext. 1292 Engineering Dept.—508-398-2231 ext. 1250 Fire Dept.—Kevin Huck/Scott Smith, 96 Old Main Street, SY Note: Please call Fire Department for an appointment. 508-398-2212 Other Appropriate plans and/or application shall be provided to each departments checked-off above. Each of these regulatory authorities has their own requirements outside the jurisdiction of the Building Department. All applicable approvals shall be obtained prior to submitting a building permit application to the Building Dept. Thank you for your cooperation. Receipt Acknowledgement: Applicant's Signature Date Rev.Jan. 2019 10/5/2022 1 A el • ® NJ,Electrical Contractor business permit number 34EB01547400 NJ,HIC reg.#13VH01244300 SOLAR For other jurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses HOMEOWNERS AUTHORIZATION FORM I, Justin Emerald (print name) am the owner of the property located at address: 229 Great Western Rig South Yarmouth MA (print address) I hereby authorize Trinity Solar Inc. ("Trinity Solar") and its employees, agents, and subcontractors, including without limitation, Trinity Heating and An, to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System, Battery System, roofing or other Trinity Solar offerings located on my property, applying and obtaining permission and approval for interconnection with the electric utility company, and registration with any state and/or local incentive program(s). This authorization includes the transfer/re-administering, and/or cancellation of any existing permits on file for the purpose of updating/applying with an alternate subcontractor. Without limitation to the generality of the foregoing I specifically authorize Trinity Solar et al.to populate technical details,fill-in,edit,compile,attach drawings, plans,data sheets and other documentation to,date,submit, re-submit, revise,amend and modify application,submission and certification documents("Approvals Paperwork"), including those for which signature pages are included herewith for my signature, in furtherance of the related transaction,and I am providing any signatures to Approvals Paperwork for purposes of the foregoing.Trinity Solar will provide copies of Approvals Paperwork when submitted. My authorizations memorialized herein shall remain in full force and effect until revoked. I acknowledge that these authorizations are not required to proceed with the transaction and are not a condition of the related agreement included herewith but are being given for my own convenience and benefit in order to expedite the approvals processes. Electric Utility Company: Eversource Electric Utility Account No.: 1476 003 0040 Na�Electric Utility Account: Kevin Eldredae Justin Emerald Print Name August 30, 2022 Date Corporate Headquarters 221 1 Allenwood Road 1-877-SUN-SAVES Wall, New Jersey 07719 Ph: 732 780 3779 Fax: 732-780-6671 www.trinity-solar.com FOR INFORMATION ABOUT CONTRACTORS AND THE CONTRACTORS' REGISTRATION ACT, CONTACT THE NEW JERSEY DEPARTMENT OF LAW AND PUBLIC SAFETY, DIVISION OF CONSUMERS AFFAIRS AT 1-888-656-6225. 'na . SOLAR Yarmouth, MA September 8, 2022 Town of Yarmouth1146 Route 28 S. Yarmouth, MA 02664 RE: EMERALD,JUSTIN L Trinity Solar No. 229 Great Western Road 2022-08-755521 South Yarmouth, MA 02664 To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic[PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing (to be field verified): Conventional roof framing is 2x8 at 16 o.c.;existing rafter span= 12'0"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load(pounds per square foot- PV panels, mounting rails&hardware) • 6.3psf-existing roof loads(2.3 psf-2x8 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load-30psf-per AHJ (Authority Having Jurisdiction) • Wind criteria-Exposure Category B, 140 mph wind 3. Existing Roof modification-none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers' specifications and complies with all applicable laws, codes, and ordinances—specifically the International Building Code(2015 edition) and the International Residential Code(2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48"o.c. between mounting brackets(staggered)and is secured using 5/16"diameter corrosive-resistant steel lag bolts.A minimum of 2%"of penetration(embedment) per lag bolt is required, which will resist all stated loads above—including wind shear. Per NDS Section 12.1.4,clearance holes-equal to the diameter of the shank- need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, lhor Bojcun, PE Structural Engineer-Trinity Solar Air 5 • y--e 17i MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 I West Wareham,MA I(508)291-0007 8 o� $ r"\ N 9 �� I R.4 ° g e $ zee F F > 9 « ,ram--n 5 $° " •�m _ a c 3R' — :: .2^., 6,25 �� ° a d v '^ e ai u, > ` zie m ow `o E .. ..,.� a z a 0x,: . = w o . _ G nee m ; ^ $ w rv0 m a 3 33 N E F F F0Fi 2 0... �t. i a ` 1p oo o'o CI— vz W LJJ J= In =8>LIJ m Ch. ` U inco W J Q W `0 0CD p p Za Cz -- -J z 060 GNz0 ¢ ~ I :II � �Q 6L..��� U v, w : N z Z � C7 <ID0p w D< z—a ,�J O w inOw !moww .eZ U... Zcw Z w �M O�OI=— �— fji w Z co 0 Vha 1 < X m00 Ln � UCI ZCCcn0 1 CeaacZ p[xC w tiO ww > 000 ce Iti 0- CIWZ UUwQ Qw <Q H --4 N M L N o o 0 cr¢QU C] W `V)y o ^ W � kI/ z j? zzwo igi F N � °SQ33 _ u ' s z < 0 O 1 51222 liFo~ ioo7' al3siQo o--I 4,>3 . 5 a2xa 21 zoaaaao4 .0 LL5.-,aZ > I— N DOoaoFz 2a t a3 i_ _ -m° oN z<Fao ; WE wF2 c ;!O o_ 1D uaiF.s�_ zz ° _ Fa F -�I- 0 CD "oa3 ° r-¢z hE.z3x!O 11. s NF3 _ bao' e � Fo W :1=.8, ii°S oo '� moWF of o3DvCE3 z W o W° t JQ (N ° .t a a---- u 88C.'.00i A,T2°°z a —1 Z CC >- 88a 3�- ° = o 0 V .u,3 zoo t ,g az z<z° aox3o zi o ¢ V) N F < g u° xg, �a8,g 4= Fa . aaFtEg Z V' O Q _ t -¢O az. ., o5a 03 !o ora ¢ = = _ .rt,o °Eo w rzaoLLo W �a� foo ',1,N i to A oa N �'3 o � , Na oo1noF a1 �a 3auz,aauso ? .5u. �E 8fz • ° m P .OO F uF f W ° F a PO aao ° is a z °° ° - ', asza o1-t oa 50oo >yF W<w o z EF0 om . ,izG , A S53o >oa 3 a KtgP 'r 0f oa2 owiQ ''f z-' zz<a t .io -.‹-*2awf gaa 5.22 '_ ozo =s°AAa°W fgg3 2o0 E 2oif o wQtuu. 4wf 0ff° a0 goa i p�ow;aaoo°<5aooN3N _ uNjGzWWz2, g O Vf=it a3 oazo< azoggo°Qota°.5t5Ao' z' a g � pa_a ?g amazooa^8g3Ma?znLutOgo ry ^ e a r J �mae . w�za a aw L aw . w f" Z—z a / ° ; - Nil . ; r":1____, !,i::: L. .9 8 z ;3O ti a yA0m ! II:):, '%il;:v°11! � o c ,f E s ` wg - Ei 0 nv r ' ° ` w' a gig „ -,sm fF f a � U 41Y T � c o A E ZY c za o � 6 6caN o o5 mz � i mi l c JS,, _ N.y I os It ' 2 ,o-ozil aamI ,o Z zaW� Go:_ ° mk n1 i -® o - 5 5 < c s _ - - Ei a :umo s s s s o'II !:. : : F F n ® m Wo 5s�° ff° o o m � 3of3� hr3o ' of o_mE Sa 86E 5 kwo mo S< mfm 2 _ I. xm1 °_ _� _ WO g w� s o = o wx o gWs - =a a n Qo6 _,M :5 �3L g °z 5 0 -w i= s=_ w f� _ $f E G y� Zio i¢G ii0 6„ 6 o ® paa z5 'i o m 5 =`J `�=o LLc `O 'a u, 0 o6d '- =3` dg =a� G i a - e ossg;zi ;mGk, ¢< sea f$o°� g oV w 3a =a� �� =S ;=S erg„ 1 s`g 8 4s=_ d= �aoo �_ �Y ao l '2Ia3`a 1 aS CI�a rm. o! o i to o a 5s� wm< M „.g „.q o0 0 00 0o mo mo og el Bin ifd Sf iAi gua ¢Film Ai MI Id iiii iiii iiii lii ■ I i 8 ,2�c. '' pp£ `J A DC S O NFa 5 �. 3 i W ^ .1. 15.1 5 i o a G 3 f` 9 ..` o#3 3 W a CO u 2 v W i e — o _E LL E a W a w a . -_"!, o m S g 5 g m -N .s \ -- _ t 4 C rvp .3 a .q 3 0 i W o F a Z t 2 g Deg z:lin >>o C Yz n3 6,U91 Os O w y o '0101010I0I0 _ _ EziAd Ad a o' o' C , . i r J rye ' q i"o P ; ; t t t w �w3 zo o ss m t` a e m m c o "e ID w m : m ,,,,, ,,.. 0 ,, qt, .c, IL m Hi Lq i3 Ws g r' mrx '"� y o :„a �ozm o� mJ jjII 1 " 1e of N o$ -. z t3 vo f Ezo ��ore � I as 0 m Vg off¢. w 1 lw = gs w = a LJ f3a $ % L.XJ=cf L li o s e 22 ; W ID g n v .. g u E o > 3 E j > _ E i > ge fo < wo fao is - p. _ a ea �a S _ t a % m G w '" �o-Ia 8o - , 0 8 G,G goo 'o _ Ia fmfi 0 =oo °! oIIEG 4O f�ow wag r!"i,$ Q io¢ Eiig = Ga; 5P $mW Ba G c _ fo3woG z zoo�° w^ oQo t is a - a> Qo "' � o3h F's nGa:g��s moso$ „g aaiifx_oaF _ s - go�m B>"o>�'^ iwz„o :zg'Q4 �. 3 o gz w o F zo -=ice -3=gGa of LU _a ° z � o� ; . v 3�' oy33 BEd° � 7° z °azF �o� 3`c - N� �a����F oza u itiNfogoo `S �o: na -?F W244, g. - - a9- V _ 3:g a.„ oafm oWF N �o, � o5gfa'oo FAN_ 030moo o3m' Wu = �_ N� zz o - m? : � oAz �`WeIUo =1s a�>ag o3og° Fgar. o _ !,, 5= ag I°a LW: oo $ Ni oa4l� s - _gia gWa _ sa _ _ ugaWa 3¢ =oo YGoowz'4^ _ o! goy. o� a:foq ryo Z el!,id�_ =. g o5 - c.~oiQW — ut°o o> sP 3 o 42 able ":?3a g Q Rz3o ; 8g r DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 su n n Va Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement (PPA) Balanced Billing HOMEOWNER, JUSTIN EMERALD DATE ISSUED 8/30/2022 4:49 PM ADDRESS 229 GREAT WESTERN RD INSTALLATION 229 GREAT WESTERN RD SOUTH YARMOUTH, MA 02664 LOCATION SOUTH YARMOUTH, MA 02664 $0.00 $0.00 $0.179 $262.76 25 Years Down payment Upfront Payment(if Rate per kWh—Year Monthly payment—Year Agreement term applicable) one one (Includes ACH discount) (Includes ACH discount) F f F F AGREEMENT BENEFITS INSTALLATIONF I ^.,'f?tt,.+.'fF + ,FFr r,.mm l ;�,,,.,c% 1F e„F .,;:; ,.,,„„ 'IF F„FrFF',at,:. ,F,.,.�F;.;' ,F,.., F ? F F F /,- ✓ F: F F f,�iffi • Trinity Solar and Sunnova will install a 13.200-kW solar • If you sell your house, you may transfer the agreement and system on your home. warranties to the new homeowner, provided that the new • Your system is estimated to produce 17,815 kilowatt homeowner meets Sunnova's credit requirements. (Sec.11) hours in the first year of service. (Schedule A) • If you choose not to renew the agreement at the end of your • Your agreement includes your down payment of$0.00. 25.00-year term, Sunnova will remove the system at no cost to you. Conditions apply. (Sec. 17) • Your monthly payment will never increase by more than • This agreement requires the parties to resolve their disputes approximately 2.90% per year. (Schedule A) by arbitration rather than by lawsuits in court;jury trials and • Trinity Solar will complete the design and engineering class actions are not permitted(Sec. 19) drawings for your system, and Sunnova will review the • final design to ensure it meets our high-quality Your agreement gives you a 7-day cancellation period standards.(Sec.5(b)) without incurring any fees. • • Your system activation may experience delays as a result Any savings estimate is dependent on the energy usage of the process for obtaining the necessary building permits information you provided us and may change as your usage and utility approval for net metering and interconnection of and utility rates change over time. your system. Once your system is installed, it must still • Your solar system is covered by the Limited Warranty for pass utility inspection before you can turn it on. the term of the agreement. (Exhibit 2) • You will receive a 10%discount each month when you • Once your system is turned on and operating,you will set up automatic payments from your checking or savings receive two monthly electricity bills:one from Eversource account(pricing above already reflects discount). (Sec. Energy(Formerly NSTAR Electric Company)and one 4(e)) from Sunnova. • You may renew this agreement for up to two successive • When the electric grid goes down, your solar power system five-year terms at the end of the original 25-year term. (Sec. 10) will not work. I have reviewed, understand and agree with the above agreement terms and process. The pricing provided in this Easy Plan TM Power Purchase Agreement(PPA) is valid until September 28,2022 Ho yg►er's initials Homeowner's initials i 20 East Greenway Plaza Ste 475, Houston,TX 77046 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. Agreement ID: SG004996973 • • DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 M Sunnova Home Solar Service S U n n Va Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing Homeowner Name and Co-Homeowner Name Installation Location Installer/Contractor Address (If Any) 229 GREAT WESTERN Trinity Solar JUSTIN L EMERALD RD SOUTH YARMOUTH, ; 2211 Allenwood Road ? - 229 GREAT WESTERN RD MA 02664 Wall SOUTH YARMOUTH, MA NJ 02664 7719 License: Contract ID CA: 1072590; CT: 0635520; ELC.0195559-E1 I DE: SG004996973 2066600876;T1-0005929 FL: CVC57148 I MA: 170355; 21233A I MD: 132333; 11834 0491C I NH:0491C I NJ: 13VH01244300; Electrical Business Permit# 34EB01547400 I NY: 52821- H; H.2409780100; L004203 PA: PA128551 I RI: 39372 ; AC005040 Salesperson: Matthew Albano HIS#: Salesperson Address: Trinity Solar 2211 Allenwood Road Wall NJ 7719 Sunnova License: Sunnova MA 184093 Estimated Solar Energy Production Estimated First Year Annual Production: 17,615 kWh Estimated Initial Term Total Production: 414,944 kWh Payment Terms Upfront Payment Amount: $0.00 Amount Due at Contract Signing: $0.00 Installation Fee: " $0.00 Annual Increase of Solar Energy Rate: ? 2.90%/year First Year Solar Energy Rate, if paid by auto-ACH: $0.179/kWh First Year Solar Energy Rate, if not paid by auto-ACH: $0.197/kWh Reduced Annual Solar Energy Rate', if paid by ' $0.179/kWh auto-ACH: 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900. vnrow.sunnova.com 1 Contract ID: .8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. v ` DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 S, ' n n a Sunnova Home Solar Service (� Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing Reduced Annual Solar Energy Rate', if not paid by auto-ACH: $0.197/kWh Estimated Monthly Bill in First Year, if paid by auto- ACH: $262.76/month Estimated Monthly Bill in First Year, if not paid by auto- ACH: $289.04/month 1)Reduced Annual Solar Energy Rate applies if an Upfront Payment is made. SOAR POWER PURCHASE AGREEMENT 1. INTRODUCTION Interconnection Date is not on the first day of a This Power Purchase Agreement(this"Power calendar month, the number of days left in that partial Purchase Agreement"or"PPA") is the agreement calendar month. We refer to this period of time as the between you and Sunnova Energy Corporation "Term." The Term begins on the Interconnection (together with its successors and assigns, "Sunnova" Date, as defined below. The"Interconnection Date" is or"we"), covering the sale to you of the power the date that the System is turned on and generating produced by the solar panel system (the"System") power. Sunnova will notify you by email when the described below. Sunnova agrees to sell to you, and System is ready to be turned on. you agree to buy from Sunnova, all of the power Approximate Start Date. The installation work to be produced by the System on the terms and conditions performed by Contractor pursuant to this Power described in this Power Purchase Agreement. The Purchase Agreement shall commence within 3 days System will be installed by Sunnova or a contractor from the date that is the later of the date in which (a) acting on Sunnova's behalf at the Installation Location all permits have been issued; (b) any homeowner's listed above. This Power Purchase Agreement will association approval letter has been received; and (c) refer to this address as the"Property"or your"Home." all materials have been delivered to the site(the Sunnova provides you with a Limited Warranty(the "Commencement Date"). "Limited Warranty"). The Limited Warranty is attached Approximate Interconnection Date. All work to as EXHIBIT 2. install the System shall be completed as soon as Following the execution of this PPA, a representative possible, but in no event more than twelve(12) of Sunnova will contact you to verify your information months from the Commencement Date, subject to any (the"Validation Call"). applicable amendments. The time between This is a legally binding agreement with Commencement Date and Interconnection Date will disclosures required by law,so please read vary depending on a number of factors, some outside everything carefully. This PPA requires the parties the control of Contractor. These factors include the to resolve their disputes by arbitration rather than process for obtaining utility approval for net metering by lawsuits in court;jury trials and class actions and interconnection of your System. The project shall are not permitted. be deemed completed upon the date the System is connected to the electrical grid and begins generating If you have any questions regarding this Power power(the"Interconnection Date"). Purchase Agreement, please ask your Sunnova sales 3. POWER PURCHASE AGREEMENT PAYMENTS; consultant. AMOUNTS 2. TERM a. Power Price Sunnova agrees to sell you the power generated by the System for 25 years(300 months), plus, if the 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 2 Contract ID: SG004996973 • DocuSign Envelope ID:AE3D3882-628B-4163-8146-AD890773E850 . S rl /r a M Sunnova Home Solar Service V Easy Plan1M Power Purchase Agreement(PPA) Balanced Billing You are purchasing the power the System HAVE THE OPTION TO RE-SIGN A CONTRACT produces. The price of that power is set forth on AT THE REGULAR KWH RATE. the"Value Statement"attached as Schedule A. .—o Homeowner(s)'Initials b. Payments Schedule A details, among other things, (i)the 1 if price per kWh ("kWh Rate") you will be charged per year; (ii)the annual price per kWh percentage d. Yearly Adjustment to Monthly Payment(s)& increase(if any); (iii) Sunnova's estimate of the Estimated Annual Production power that is expected to be produced by the You will have regular access to information on the System during the first year; (iv) Sunnova's System's actual output via your Sunnova online estimate of the amount of power that is expected account. The actual kWh output per year("Actual to be produced by the System over the entire Annual Production") may vary from the Estimated Term (excluding any renewal period(s)extending Annual Production due to weather and other the Term as provided in Section 10); and (v)your conditions. You agree that the exclusive means to Monthly Payment amount for the first year. Your monitor and measure the Actual Annual "Monthly Payment" is calculated based on the Production is via the System's meter; provided, following: (A)the annual price per kWh multiplied however, if the System's meter malfunctions or by(B)the estimated kWh output per year becomes inoperable, Sunnova will reasonably ("Estimated Annual Production") divided by(C) estimate the amount of power that would have twelve(12). During contract validation, you will been delivered to you during the period in which choose one of the available payment date options the System's meter was malfunctioning or for your Payment Date. After your first Monthly inoperable and shall treat this reasonable Payment, 299 additional Monthly Payments will be estimate as part of the Actual Annual Production due on the same day of each following month. for that year for purposes of this paragraph. Your Any payments due upon installation are due Monthly Payment may adjust each year if(i)there immediately prior to commencement of is a price per kWh annual increase during the installation. You will not make a Monthly Payment Term as set forth in Schedule A and/or(ii)Actual if you fully prepay this PPA as provided in Section Annual Production varies from the Estimated 4(k)or if you fully prepay this PPA in connection Annual Production as set forth on Schedule A. with an Upfront Payment in below section 3(c). After the end of each year during the Term, c. Rate Reduction - Upfront Payment Sunnova will notify you of the Actual Annual Production for the previous year and of any You have x❑ have not selected the option to adjustment to the Estimated Annual Production reduce your kWh Rate by making an upfront and Monthly Payments for the current year and payment of$0.00 thereafter. If the Actual Annual Production is less (the"Upfront Payment") due on the earlier of(i) 10 than the Estimated Annual Production for the days prior to the date of installation and (ii) 30 previous year, Sunnova (i)will credit you an days after the execution of this PPA. If you make amount equal to the difference between the the Upfront Payment, we will reduce your kWh Estimated Annual Production and the Actual Rate to a reduced kWh rate (the"Reduced Annual Annual Production ("Overestimate of Production") kWh Rate"or"Reduced Solar Energy Rate") as multiplied by the annual price per kWh for that reflected on Schedule A. Your"Monthly year(including any annual kWh price percentage Payment"will be recalculated as follows: (A)the increase previously agreed upon as provided in Reduced Annual kWh Rate multiplied by(B)the Schedule A)and (ii) may, at its option, decrease Estimated Annual Production, as defined above, the Estimated Annual Production and the Monthly divided by(C)twelve(12). If you fully prepay this Payments for the current year. If your Monthly PPA by making an Upfront Payment then you will Payments are calculated at the Reduced Annual not have a monthly payment. kWh Rate pursuant section 3(c) herein, any credit IF YOU HAVE CHOSEN THE OPTION TO for an Overestimate of Production as set forth in REDUCE YOUR KWH RATE BY MAKING AN this section 3(d)will be at the Reduced Annual UPFRONT PAYMENT AND YOU FAIL TO MAKE kWh Rate. THE UPFRONT PAYMENT BY THE REQUIRED If the Actual Annual Production is more than the DEADLINE THIS CONTRACT WILL Estimated Annual Production for the previous AUTOMATICALLY CANCEL AND YOU WILL year, Sunnova may, at its option, (i) apply the 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 3 Contract ID: SG004996973 k DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S U 1 n �/` `a Sunnova Home Solar Service Easy PlanTv' Power Purchase Agreement(PPA) Balanced Billing difference between the Actual Annual Production "Force Majeure Event"means any event,condition and the Estimated Annual Production to an or circumstance beyond the control of and not Overestimate of Production for the current year or caused by fault or negligence. It shall include, a subsequent year and/or(ii) increase the without limitation,failure or interruption of the Estimated Annual Production and the Monthly production, delivery or acceptance of power due to: Payments for the current year and thereafter. In an act of god; war(declared or undeclared); no event shall Sunnova increase the Estimated sabotage; riot; insurrection; civil unrest or Annual Production by more than 110%of the disturbance; military or guerilla action;terrorism; Estimated Annual Production for the first year. economic sanction or embargo; civil strike,work If you prepaid this PPA in full, you will not have an stoppage, slow-down, or lock-out;explosion;fire; annual accounting of the Actual Annual earthquake; pandemic; abnormal weather condition Production against the Estimated Annual or actions of the elements; hurricane;flood; Production. Instead, we will evaluate your Actual lightning; wind; drought; the binding order of any Post Prepayment Production at the end of the governmental authority(provided that such order Term and receive a Prepayment Rebate as those has been resisted in good faith by all reasonable terms are defined in Section 4(k) below. legal means);the failure to act on the part of any governmental authority(provided that such action has been timely requested and diligently pursued); e. Payment Reconciliation unavailability of power from the utility grid, equipment, supplies or products; power or voltage If(i) the System is off line for more than seven (7) surge caused by someone other than Sunnova full twenty-four(24) hour days cumulatively during including a grid supply voltage outside of the the Term (for example, you remove the System to standard range specified by your utility; and failure do renovations to your Home); or(ii) you take of equipment not utilized by Sunnova or under its some action that significantly reduces the output control. of the System; or(iii) you don't trim your bushes 4. POWER PURCHASE AGREEMENT OBLIGATIONS or trees to their appearance when you signed this PPA to avoid foliage growth from shading the a. System, Home and Property Maintenance System, then Sunnova will reasonably estimate You agree to: the amount of power that would have been delivered to you during such outages or reduced (i) have the System repaired pursuant to the production periods and shall treat this reasonable Limited Warranty ONLY and reasonably estimate as part of the Actual Annual Production cooperate when repairs are being made; for that year for purposes of this paragraph. You (ii) keep trees, bushes and hedges trimmed so will not be charged for the System being off line due to Sunnova's fault or grid failure. that the System receives as much sunlight as it did when Sunnova initially installed the f. Payment Suspension Due to Circumstances System; Outside of Your Control (iii) keep the panels and modules clean, In the event of System destruction or grid failure pursuant to the Limited Warranty and the caused by a Force Majeure Event, your payment Guide(as such term is defined in Exhibit 2) obligations under this Power Purchase Agreement and protect the System from animals and will be suspended for as long as the System is infestation; down or the grid failure continues due to the Force (iv) not modify your Home or landscaping in a Majeure Event, and the Term of this Power way that shades the System; Purchase Agreement will be extended for an equivalent period of time; provided however, that (v) be responsible for any conditions at your (i)you provide notice to Sunnova of the Force Home that affect the installation (e.g., Majeure Event and your intention to rely upon the blocking access to the roof, or removing a Force Majeure Event as a basis for suspending tree that is in the way, prior work you have payments, and (ii)the payment obligations may done on your Home that was not permitted); be suspended and the Term extended only for the (vi) be responsible for the structural integrity of amount of time that Sunnova may determine, in its sole discretion, that a Force Majeure Event exists the Home where the System is installed, and provides written confirmation of the same. including structural or electrical modifications necessary to prepare your Home and roof for 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 4 Contract ID: SG004996973 • DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S1 1 n n \V a, Sunnova Home Solar Service tJ Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing the System. You agree that Sunnova is not listed on any national or state"Do Not Call" responsible for any known or unknown list. Message and data rates may apply. property conditions, including but not limited Homeowner(s)'Initials to, actual or alleged exacerbation of pre- ,—os existing conditions; Homeowner(s)'Initials if b. System Construction, Repair, Insurance and Sunnova's obligations (vii) not remove any markings or identification Sunnova agrees to cause our contractors to: tags on the System; (i) schedule the installation of the System at a vl mutually convenient date and time; (viii) permit Sunnova, after we give you reasonable notice, to inspect the System for (ii) construct the System according to written proper operation as we reasonably plans you review that provide a detailed determine necessary; description of work to be done and equipment to be used; (ix) use the System primarily for personal, family or household purposes, but not to heat a (iii) provide you with a meter to accurately swimming pool, and not to provide power to measure the amount of power the System any property outside of your Home; delivers to you; (x) not do anything, permit or allow to exist any (iv) notify you if the System design has to be condition or circumstance that would cause materially changed so that you can review the System not to operate as intended at the any such changes; Property; (v) clean up after ourselves during the (xi) notify Sunnova immediately if you think the construction of the System; System is damaged or appears unsafe; if (vi) obtain insurance insuring the System the System is stolen; and prior to changing against all damage or loss unless (A)that your electric provider; damage or loss is caused by your (xii) have anyone who has an ownership interest negligence; or(B)you intentionally damage in your Home sign this Power Purchase the System; Agreement; (vii) obtain insurance insuring our actions, (xiii) permit us access to data regarding your covering damage to your Property caused energy consumption from your electric by faulty installation, System malfunction or provider or from electronic usage data manufacturing defects; storage sites (data produced by the System (viii) not be a loss payee(or named insured)on shall be owned by us) and execute a third the insurance policy covering your Home; party access agreement for this purpose • where required; (ix) repair the System pursuant to the Limited (xiv) return signed any documents we send you Warranty and reasonably cooperate with for signature(like incentive claim forms) you when scheduling repairs; within five (5) business days of receiving (x) create a priority stream of operation and them; maintenance payments to provide enough (xv) authorize Sunnova to make inquiries cash flow in our financing transactions to concerning your credit history and standing pay for the Limited Warranty obligations and from time to time; and the repair and maintenance of the System in accordance with this PPA even if Sunnova (xvi) authorize Sunnova to (i) call you and (ii) ceases to operate; send pre-recorded and text messages to (xi) not put a lien on your Home or Property; and your provided phone number regarding the installation, maintenance, and administration (xii) install, operate and maintain the System in of your System using automated telephone accordance with applicable net metering and technology even if your phone number is interconnection laws. 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 5 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628B-4183-8146-AD890773E850 S n n ` `a Sunnova Home Solar Service \/ C( Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing c. System Installation Timeline the System. You also agree to pay as invoiced Your System requires review and approval by any applicable personal property and/or ad your utility. Review and approval of your valorem taxes on the System that your local jurisdiction may levy. The total estimated amount application may take 5-6 months to complete. you will pay for taxes over the Term is $0.00 Sunnova and its installation partner will work with you to complete this process as quickly as assuming that tax rate, structure, exemptions(and possible. the interpretations of the same) stay the same as they are on the date of this PPA. In the event the By initialing below, you acknowledge that it may tax rate, structure or exemptions(and/or the take several months to complete the review of interpretations of the same) change during the your application and complete the installation of Term that amount will change. your system. g. No Alterations Homeowner(s)'Initials ,—o You agree that you will not make or allow any other party to make any modifications, improvements, revisions or additions to the System or take any other action such as d. Home Renovations or Repairs modifying your Home or landscaping in a way that affects the System and that could void the Limited If you want to make any repairs or improvements Warranty on the System without Sunnova's prior to the Property that could interfere with the written consent. If you make or allow any other System (such as repairing the roof where the party to make any modifications, improvements, System is located), you may only remove and revisions or additions to the System, they will replace the System at your cost with advance become part of the System and shall be notice to us and in compliance with the Limited Sunnova's property. Warranty. e. Automatic Payment, Fees; Late Charges h. Access to the System In addition to the other amounts you agree to pay (i) You grant to Sunnova and its employees, in this Power Purchase Agreement, you agree to reasonablyn and acccess all oft thee rightrpto pay the following: access all Property as necessary for the purposes of(A) installing, (i) Automatic Payment Discount: All prices constructing, operating, owning, repairing, include a ten percent(10%) monthly removing and replacing the System or discount for using automatic payment. You making any additions to the System or will not receive a ten percent(10%) monthly installing complementary technologies on or discount if you do not make automatic about the location of the System; (B) Monthly Payments through your checking or enforcing Sunnova's rights as to this Power savings account; Purchase Agreement and the System; (C) installing, using and maintaining electric (ii) Late Payments: accrue interest at the lines and inverters and meters, necessary to lesser of twelve percent(12%)annually interconnect the System to your electric or the maximum allowable rate by system at the Property and/or to the utility's applicable law beginning on the twentieth electric distribution system; or(D)taking any (20"')day after the date the payment was other action reasonably necessary in due and continuing until paid in full; and connection with the construction, installation, (iii) Returned Check Fee: $25.00 (or such lower operation, maintenance, removal or repair of amount as required by law)for any check or the System. This access right shall continue withdrawal right that is returned or refused for up to ninety(90) days after this Power by your bank. Purchase Agreement expires to provide Sunnova with time to remove the System at f. Estimated Taxes the end of the Power Purchase Agreement. You agree to pay any applicable sales, use or Sunnova shall provide you with reasonable similar taxes on the Monthly Payments (or notice of its need to access the Property prepayment, as applicable) due under this PPA. If whenever commercially reasonable. this PPA contains a purchase option, you agree to pay any applicable tax on the purchase price for 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 6 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S1 1 n �''� \ /�M Sunnova Home Solar Service lJ V Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing (ii) During the time that Sunnova has access You may prepay all payments remaining on this rights you shall ensure that its access rights PPA at any time provided you notify Sunnova of are preserved and shall not interfere with or your desire to prepay. The amount you prepay permit any third party to interfere with such will be based on the following:(i) all accrued but rights or access. You agree that the System unpaid Monthly Payments, taxes, late charges, is not a fixture, but Sunnova has the right to penalties, interest and all or any other sums then file any UCC-1 financing statement or fixture accrued or due and owing, plus (ii)the amount set filing that confirms its interest in the System. forth on Schedule A in the column titled "Prepay i. Indemnity Option,"which amount may be adjusted at the time of prepayment to reflect Sunnova's estimate To the fullest extent permitted by law, you shall of the kWh output per year from the time of indemnify, defend, protect, save and hold prepayment to the end of the Term ("Estimated harmless Sunnova, its employees, officers, Post-Prepayment Production") and discounted to directors, agents, successors and assigns from present value at 5% per annum, plus (iii) any and all third party claims, actions, costs, reasonable compensation, on a net after tax basis expenses(including attorneys' fees and assuming a tax rate of 35%, for the loss or expenses), damages, liabilities, penalties, losses, recapture of(A)the investment tax credit obligations, injuries, demands and liens of any applicable with respect to the System cost, kind or nature arising out of, connected with, including installation; and (B) accelerated relating to or resulting from your negligence or depreciation over five(5)years equal to eighty willful misconduct by you or any of your agents, five percent(85%) of the System cost, including employees, household members, family installation, and for the loss of any anticipated members, tenants, invitees; provided, that nothing benefits pursuant to Section 8 of this PPA herein shall require you to indemnify Sunnova for (Sunnova shall furnish you with a detailed its own negligence or willful misconduct. The calculation of such compensation if such a claim provisions of this paragraph shall survive is made). In the event you made an Upfront termination or expiration of this Power Purchase Payment and are making monthly payments at the Agreement. Reduced kWh Rate per above Section 3(c), your j. Payments Prepay Option amount will be reduced to reflect the Upfront Payment. Schedule A describes your payment obligations under this PPA. SUBJECT TO SECTION 3(b) ABOVE, YOU AGREE THAT THE OBLIGATION After you notify Sunnova of your desire to prepay, TO PAY ALL PAYMENTS AND ALL OTHER Sunnova will provide a notice to you ("Prepayment AMOUNTS DUE UNDER THIS PPA SHALL BE Notice") informing you of the Estimated Post- ABSOLUTE AND UNCONDITIONAL UNDER ALL Prepayment Production and the amount you need CIRCUMSTANCES AND SHALL NOT BE to pay to prepay the PPA(the"Prepayment SUBJECT TO ANY ABATEMENT, DEFENSE, Amount)". The Prepayment Amount is due within COUNTERCLAIM, SETOFF, RECOUPMENT OR fifteen (15) days from the date of the Prepayment REDUCTION FOR ANY REASON Notice. After you timely pay the Prepayment WHATSOEVER, IT BEING THE EXPRESS Amount in full, you will not make any further INTENT OF THE PARTIES THAT ALL Monthly Payments. AMOUNTS PAYABLE BY YOU HEREUNDER If you prepay in full under(i)this section 4(k) or(ii) SHALL BE,AND CONTINUE TO BE, PAYABLE in connection with an Upfront Payment per section IN ALL EVENTS INCLUDING BY YOUR HEIRS 3(c), then at the end of the Term, Sunnova will AND ESTATE AND, EXCEPT AS SET FORTH notify you of the actual kWh output per year from BELOW IN SECTION 5 AND IN THE NOTICE OF the date of your prepayment to the end of the RIGHT TO CANCEL, YOU HEREBY WAIVE ALL Term ("Actual Post Prepayment Production"). If, RIGHTS YOU MAY HAVE TO REJECT OR at the end of the Term,the Estimated Post- CANCEL THIS PPA, TO REVOKE Prepayment Production is greater than the Actual ACCEPTANCE OF THE SYSTEM, OR TO Post-Prepayment Production, Sunnova will pay GRANT A SECURITY INTEREST IN THE you, the homeowner who prepaid this PPA, within SYSTEM. sixty(60) days after the end of the Term an k. Option to Prepay all Payments Remaining on amount equal to the difference, if any, between the PPA the Actual Post-Prepayment Production and the 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 7 Contract ID:SG004996973 2 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S U n n /r1r, Sunnova Home Solar Service V a Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing Estimated Prepayment Production multiplied by (vii) completion of any renovations, the price per kWh at the end of the Term (a improvements or changes reasonably "Prepayment Rebate"). Sunnova will send the required at your Home or on the Property Prepayment Rebate to the last address we have (e.g., removal of a tree or necessary roof for you in our file and it is your responsibility to repairs to enable us to safely install the notify Sunnova if you move. If the Estimated System). Post Prepayment Production is less than the Sunnova may terminate this Power Purchase Actual Post-Prepayment Production, you will owe Agreement without liability if, in its judgment, any nothing to Sunnova. of the above listed conditions will not be satisfied I. Utility Service in a timely manner for any reason. Once Sunnova You agree to continue to subscribe to the utility starts installation, however, it may not terminate service that you had at the time of entering into this Power Purchase Agreement for your failure to this PPA and you agree to execute all satisfy the conditions (i)through (vii) above. documentation associated with that utility service. b. Amendments,Your Right to Terminate for m. Supplemental Energy Material Changes Before Installation All electric energy made available by the System Both parties will have the right to terminate this is for use at your Home pursuant to this PPA. If, PPA, without penalty or fee, if Sunnova at any time, you need more electricity than is determines after the engineering site audit of your being produced by the System ("Supplemental Home that it has misestimated the System's Energy"), annual production by more than ten percent you will be responsible for purchasing (10%). Such termination right will expire at the that Supplemental Energy from another supplier, such as your utility. earlier of(i)one(1)week prior to the scheduled System installation date and (ii) one(1) month 5. CONDITIONS PRIOR TO INSTALLATION OF THE after we inform you in writing of the revised SYSTEM; CHANGE ORDERS production estimate. If neither party exercises a. Sunnova's obligation to install the System and their right to terminate this PPA following a ten percent(10%)change in the System's production, sell you the power it produces is conditioned on the following items having been completed then any ted in changes amendmentto the e to thiswi be to its reasonable satisfaction: documented in an PPA. You authorize Sunnova to make corrections to the (i) completion of(A)the engineering site audit utility paperwork to conform to this PPA or any (a thorough physical inspection of the amendments to this PPA we both sign. Property, including, if applicable, 6. WARRANTY geotechnical work), (B)the final System design, and (C) real estate due diligence to YOU UNDERSTAND THAT THE SYSTEM IS confirm the suitability of the Property for the WARRANTED SOLELY UNDER THE LIMITED construction, installation and operation of WARRANTY ATTACHED AS EXHIBIT 2,AND THAT the System; THERE ARE NO OTHER REPRESENTATIONS OR (ii) approval of this Power Purchase Agreement WARRANTIES, EXPRESS OR IMPLIED, AS TO THE by Sunnova's financing sources; MERCHANTABILITY, FITNESS FOR ANY PURPOSE, CONDITION, DESIGN, CAPACITY, (iii) your meeting Sunnova's credit underwriting SUITABILITY OR PERFORMANCE OF THE criteria then in effect; SYSTEM OR ITS INSTALLATION. THE WARRANTY (iv) confirmation of rebate, tax credit and SET FORTH HEREIN REPRESENTS THE SOLE renewable energy credit payment availability AND EXCLUSIVE REMEDY YOU HAVE AGAINST i the amount ug recalculate the Monthly SUNNOVA RELATING TO THE SYSTEM OR THE POWER PURCHASED THEREUNDER. Payments set forth in this Power Purchase Agreement; 7. TRANSFER (v) confirmation that Sunnova will obtain all Sunnova works with banks, companies and other applicable benefits referred to in Section 8; financing parties to finance the System. As a result, (vi) receipt of all necessary zoning, land use and Sunnova may assign this PPA to one of its financing building all and parties. In addition, Sunnova may assign this PPA to its affiliates or a third party that purchases the PPA. 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 8 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 S e n n a Sunnova Home Solar Service V Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing You agree that Sunnova may pledge, assign, sell or LOCAL GOVERNMENT OR A LOCAL UTILITY AND transfer the System and this Power Purchase GIVING THESE TAX CREDITS, RENEWABLE Agreement, or any part of this Power Purchase ENERGY/CARBON CREDITS, CAPACITY RIGHTS Agreement or the exhibits, without your consent. REBATES OR OTHER BENEFITS TO SUNNOVA. Assignment, sale or transfer generally means that Sunnova would transfer all or a portion of its rights ADDITIONALLY, YOU AGREE THAT SUNNOVA and certain of its obligations under this Power HAS THE RIGHT TO ENROLL THE SYSTEM OR Purchase Agreement to another party. MANAGE THE ENROLLMENT OF THE SYSTEM IN 8. OWNERSHIP OF THE SYSTEM: TAX CREDITS, ENERGY MANAGEMENT PROGRAMS AND YOU REBATES AND CAPACITY RIGHTS AGREE TO EXECUTE ANY NECESSARY DOCUMENTS AND TO PROVIDE INFORMATION You agree that the System is and shall remain REGARDING YOUR UTILITY ACCOUNT TO Sunnova's exclusive personal property under the FACILITATE ENROLLMENT IN SUCH ENERGY Uniform Commercial Code or otherwise. You MANAGEMENT PROGRAMS. YOU AGREE THAT understand and agree that this PPA is not a contract SUNNOVA IS EXCLUSIVELY ENTITLED TO to sell or lease the System to you. Sunnova owns the RECEIVE ANY AND ALL BENEFITS RESULTING System for all purposes, including any data generated FROM THE ENROLLMENT OR PARTICIPATION IN from the System. You shall at all times keep the SUCH ENERGY MANAGEMENT PROGRAMS. System free and clear of all liens, claims, levies and legal processes not created by Sunnova, and shall at Homeowner(s)'Initials your expense protect and defend Sunnova against the ,—DS same. AA NO FEDERAL OR STATE TAX INCENTIVES ARE J INCLUDED IN CALCULATING THE MONTHLY PAYMENT. YOU UNDERSTAND AND AGREE WITH 9. PURCHASING THE SYSTEM PRIOR TO THE END THE EXCEPTION OF STATE SPECIFIC REBATES OF THE TERM AND/OR TAX CREDITS AVAILABLE ONLY TO THE In addition to purchasing the System at the end of the HOMEOWNER, THAT ANY AND ALL(i)TAX Term (see Schedule A), you have the option to CREDITS, (ii)TAX INCENTIVES, (iii) RENEWABLE purchase the System prior to the end of the Term. To ENERGY CREDITS, GREEN TAGS, OR CARBON exercise this option, you must be in good standing OFFSET CREDITS, (iv) UTILITY REBATES, (v) under this Power Purchase Agreement and you need CAPACITY RIGHTS, OR(vi)ANY OTHER NON- to give us at least one(1) month's, but not more than POWER ATTRIBUTES OF THE SYSTEM ARE THE three(3) months' prior written notice. You can PROPERTY OF AND FOR THE BENEFIT OF purchase this System: SUNNOVA, USABLE AT ITS SOLE DISCRETION. SUNNOVA SHALL HAVE THE EXCLUSIVE RIGHT a. on the five(5) year anniversary of the TO ENJOY AND USE ALL SUCH BENEFITS, beginning of the Term and every annual WHETHER SUCH BENEFITS EXIST NOW OR IN anniversary after the five(5)year THE FUTURE. YOU AGREE TO REFRAIN FROM anniversary; and ENTERING INTO ANY AGREEMENT WITH YOUR b. at any time after the five(5)year UTILITY THAT WOULD ENTITLE YOUR UTILITY TO anniversary of the beginning of the Term, CLAIM ANY SUCH BENEFITS RETAINED BY when you sell your Home. SUNNOVA. YOU AGREE TO REASONABLY COOPERATE WITH SUNNOVA SO THAT IT MAY In each of(i)and (ii) above, the price you will pay for CLAIM ANY TAX CREDITS, RENEWABLE ENERGY the System will be the greater of the System's fair CREDITS, REBATES, CARBON OFFSET CREDITS, market value("FMV") and the amount shown on CAPACITY RIGHTS OR ANY OTHER BENEFITS Schedule A. The interests of any financing party shall FROM THE SYSTEM. THIS MAY INCLUDE TO THE not be taken into account when determining the FMV; EXTENT ALLOWABLE BY LAW, ENTERING INTO a third-party independent appraiser will be retained to NET METERING AGREEMENTS, compute the System's FMV. If you made an Upfront INTERCONNECTION AGREEMENTS, ENROLLING Payment,the price to purchase the System will be IN ENERGY MANAGEMENT PROGRAMS AND reduced to reflect and account for the Upfront FILING RENEWABLE ENERGY/CARBON OFFSET Payment. Sunnova's maintenance and repair CREDIT REGISTRATIONS AND/OR APPLICATIONS obligations and this PPA will end when you purchase FOR REBATES FROM THE FEDERAL, STATE OR the System unless you enter into a new maintenance and repair agreement with Sunnova, provided that you 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 9 Contract ID:SG004996973 m � DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S U n n ` a Sun nova Home Solar Service �/d Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing will have no less than a ten (10) year warranty on the If you are moving to a new home in the System beginning on the Interconnection Date that same utility district, where permitted by the guarantees that the System will be free from defects local utility, the System can be moved to in workmanship or defects in, or breakdown of, your new home pursuant to the Limited materials or components. Warranty. You will need to pay all costs 10. RENEWAL associated with relocating and redesigning the System, execute and provide the same If you are in compliance with your PPA, you have the access and ownership rights to Sunnova as option to renew your PPA for up to ten (10)years in two provided for in this PPA and provide any (2) consecutive five (5) year renewal periods. We will third-party consents or releases required by send you renewal forms at least ninety(90)days prior Sunnova in connection with the substitute to the expiration of the Term,which forms shall set forth premises. You agree that Sunnova will need the new rates per kWh applicable for the renewal term to reevaluate the production of your System as well as the rates applicable in the event the PPA is at the substitute premises and may need to renewed for one(1)year as provided for herein. The revise the estimates in your PPA and renewal forms will give you the option to: (a) elect to Limited Warranty. renew the PPA for an additional five (5) year term at the (iii) Prepay this Power Purchase Agreement rates specified in the renewal notice; or(b) elect not to and Transfer only the Use of the System renew the PPA. You must make your election whether to renew or not at least thirty(30) days prior to the end You can prepay this Power Purchase of the then current term of the PPA. In the event that Agreement as set forth in Section 4(k). The you affirmatively elect not to renew this PPA as Person buying your Home will only need to provided for in part(b) above this PPA shall expire by sign a transfer agreement to assume your its terms on the expiration of the then current term. rights and non-Monthly Payment obligations If you don't send us anything in writing you will be under this PPA. deemed to have renewed for an additional one(1) b. You agree to give Sunnova at least fifteen (15) year term at a rate which equals the rate per kWh days but not more than three(3) months' prior applicable at the expiration of the then current term written notice if you want someone to assume plus two point nine percent(2.9%)and this PPA your PPA obligations. In connection with this shall continue to renew for additional one(1)year assumption, you, your approved buyer and terms on the above described rate terms until(i) Sunnova shall execute a transfer agreement. you give us notice at least thirty(30)days prior to Unless we have released you from your the expiration of the then current term that you do obligations in writing, you are still responsible for not wish to renew;or(ii) we send you a notice performing under this PPA. If your buyer defaults terminating the PPA at least thirty(30)days prior to on this PPA and we have not yet signed the the expiration of the then current term. transfer agreement, you will be responsible for Homeowner(s)'Initials their default. We will release you from your ,—Ds obligations under this PPA in writing once we sit have a signed transfer agreement with the person \ buying your Home(provided such person has been approved as a transferee by Sunnova in 11. SELLING YOUR HOME writing). a. If you sell your Home you can: c. If you sell your Home and can't comply with any of the options in subsection (a) above, you will be in (i) Transfer this Power Purchase Agreement default under this PPA. Death does not negate and the Monthly Payments the obligations in this PPA and does not give rise If the person buying your Home meets to a right of termination. In the event of death, this Sunnova's credit requirements, then where PPA and the obligations herein will transfer to the permitted by the local utility, the person decedent's estate. buying your Home can sign a transfer d. This PPA is free of any restrictions that would agreement assuming all of your rights and prevent the homeowner from freely transferring obligations under this Power Purchase their Property. In the event of a foreclosure on the Agreement. Property, your lender has the right(but not the (ii) Move the System to Your New Home obligation)to do ONE of the following: 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 10 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 S1 1 n n a M Sunnova Home Solar Service 1 V Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing (i) terminate this PPA and require Sunnova to Homeowner(s)'Initials remove the System subject to your i—os obligations under Sections 14 and 15; �► (ii) become a beneficiary(but not obligor) of the PPA free of charge (i.e. receive power from 12. LOSS OR DAMAGE the System and enforce the Limited Warranty but not have the obligation to Unless you are negligent or you intentionally damage make payment, which obligation will remain the System, Sunnova will bear all of the risk of loss, with you—if you don't make timely payment damage, theft, destruction or similar occurrence to you will be in default under Section 14 and any or all of the System. Sunnova can terminate, remove the System In the event you are negligent or intentionally damage and take all other remedies it has under the System you shall be liable to pay Sunnova the Section 15); greater of(a)the actual damages suffered by Sunnova; or(b)the amount determined in Section (III) enter into a new PPA with Sunnova on 4(k). Except as expressly provided in this PPA, no PPAtermso o less favorable than the current loss, damage, theft or destruction will excuse you from your obligations under this PPA, including Monthly (iv) require transfer of the PPA under this Payments. Section 11 to a subsequent purchaser of the 13. LIMITATION OF LIABILITY Property. Sunnova will not prohibit the sale, conveyance or a. No Consequential Damages refinancing of the Property. Sunnova may choose SUNNOVA'S LIABILITY TO YOU UNDER THIS to file in the real estate records a UCC-1 financing POWER PURCHASE AGREEMENT SHALL BE statement("Fixture Filing")that preserves its LIMITED TO DIRECT,ACTUAL DAMAGES rights in the System. The Fixture Filing is ONLY.YOU AGREE THAT IN NO EVENT intended only to give notice of its rights relating to SHALL EITHER PARTY BE LIABLE TO THE the System and is not a lien or encumbrance OTHER FOR CONSEQUENTIAL, INCIDENTAL, against the Property. Sunnova shall explain the PUNITIVE, EXEMPLARY, SPECIAL OR Fixture Filing to any subsequent purchasers of the INDIRECT DAMAGES. Property and any related lenders as requested. Sunnova shall also accommodate reasonable b. Actual Damages requests from lenders or title companies to EXCEPT FOR CLAIMS UNDER SECTION 4(I), facilitate a purchase, financing or refinancing of NEITHER PARTY'S LIABILITY TO THE OTHER the Property. If Sunnova temporarily removes its WILL EXCEED AN AMOUNT EQUAL TO THE Fixture Filing in order to facilitate the purchase, MAXIMUM AMOUNT THAT COULD BE financing or refinancing of the Property, Sunnova PAYABLE BY YOU UNDER SECTION 15(J). may charge you a UCC Notice Removal and DAMAGES TO YOUR HOME, BELONGINGS OR Refiling fee, in the amount charged to Sunnova by PROPERTY RESULTING FROM THE the local jurisdiction, and a processing fee for its INSTALLATION OR OPERATION OF THE expenses. SYSTEM ARE COVERED IN THE LIMITED e. EXCEPT AS SET FORTH IN THIS SECTION, WARRANTY. YOU WILL NOT ASSIGN, SELL, PLEDGE OR IN 14. DEFAULT ANY OTHER WAY TRANSFER YOUR INTEREST IN THE SYSTEM OR THIS PPA You will be in default under this Power Purchase WITHOUT OUR PRIOR WRITTEN CONSENT, Agreement if any one of the following occurs: WHICH SHALL NOT BE UNREASONABLY a. you fail to make any payment when it is due WITHHELD AS LONG AS YOU AND THE and such failure continues for a period of PROPOSED TRANSFEREE MEET THE OTHER ten (10) days; REQUIREMENTS SET FORTH HEREIN. b. you fail to perform any material obligation BY INITIALING BELOW, YOU EXPRESSLY that you have undertaken in this PPA AGREE THAT YOU HAVE READ THIS SECTION (which includes doing something you have 11 IN ITS ENTIRETY AND AGREE TO ITS agreed not to do, like alter the System) and TERMS. such failure continues for a period of fourteen (14) days after written notice; 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 11 Contract ID:SG004996973 If DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S rl "r1'" Sunnova Home Solar Service V a Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing c. you have provided any false or misleading j. recover from you (i)all accrued but unpaid financial or other information to obtain this Monthly Payments, taxes, late charges, Power Purchase Agreement; penalties, interest and all or any other sums d. you assign,transfer, encumber, sublet or then accrued or due and owing, plus(ii)the sell this PPA or any part of the System estimated amount of future Monthly Payments, each payment discounted to without Sunnova's prior written consent; or present value at 5% per annum (plus any e. you make an assignment for the benefit of other applicable taxes), plus (iii) reasonable creditors, admit in writing your insolvency, compensation, on a net after tax basis file or have filed against you a petition in assuming a tax rate of 35%, for the loss or bankruptcy, are adjudicated bankrupt or recapture of(A)the investment tax credit insolvent or undertake or experience any applicable with respect to the System cost, substantially similar activity. including installation; and (B)accelerated 15, REMEDIES IN CASE OF DEFAULT depreciation over five(5) years equal to eighty five percent(85%) of the System If this Power Purchase Agreement is in default,we cost, including installation, and for the loss may take any one or more of the following actions. If of any anticipated benefits pursuant to the law requires us to do so, we will give you notice Section 8 of this PPA(Sunnova shall furnish and wait any period of time required before taking any you with a detailed calculation of such of these actions. We may: compensation if such a claim is made); or a. terminate this PPA and your rights to k. use any other remedy available to us in this possess and use the System; PPA or by law. b. suspend our performance under the PPA; We may submit to credit reporting agencies(credit c. take any reasonable action to correct your bureaus) negative credit reports that would be default or t prevent out loss.Any amount reflected on your credit record if you do not pay any amounts due under this PPA as required. we pay will be added to the amount you owe us and will be immediately due; You agree to repay us for any reasonable amounts we incur to correct or cover your default and to enforce d. require you, at your expense,to return the our rights under this PPA including, but not limited to, System or make it available to us in a attorney's fees and court costs. You also agree to reasonable manner; reimburse us for any costs and expenses we incur e. proceed, by appropriate legal action, to relating to the System's return resulting from early enforce performance of this PPA and to termination. By choosing any one or more of these recover damages for your breach; remedies, Sunnova does not give up its right to use another remedy. By deciding not to use any remedy f. disconnect, turn off or take back the System should this Power Purchase Agreement be in default, by legal process or self-help, but we may Sunnova does not give up our right to use that remedy not disturb the peace or violate the law; in case of a subsequent default. g. report such non-operational status of the 16. ADDITIONAL AGREEMENTS System to your utility, informing them that you are no longer net metering; a. Notice of Changes. You agree to notify us if your name or mailing address changes or if h. charge you a reasonable reconnection fee there is any material deterioration in your for reconnecting the System to your utility or financial circumstances or any material turning the System back on after we changes to the condition of your Home that disconnect or turn off the System due to would impact the System or impact our your default; interest in the System. i. in the case of your failure to protect the b. Waiver of Confidentiality of Residence System from animals, infestation, or Address. By signing this PPA, and so long overgrown tree growth and foliage, as you have a contract with us, you waive the unilaterally adjust the contract terms upon confidentiality of your residence address notice to you for reduced production as under the provisions of any applicable law and appropriate; authorize us to obtain from the applicable state agency your current residence address. 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 12 Contract ID: SG004996973 1 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S n V/�rU Sun nova Home Solar Service Easy Plan 1." Power Purchase Agreement(PPA) Balanced Billing c. Personal Information and Privacy Policy. not the arbitration acts, statutes or rules of any other Please see Sunnova's Privacy Policy on our jurisdiction. website: https://www.sunnova.com/privacy- 19. ARBITRATION policy for more information about how we collect and use personal information. You PLEASE READ THIS SECTION CAREFULLY. have read, understand and agree with the ARBITRATION REPLACES THE RIGHT TO GO TO terms of Sunnova's Privacy Policy as set forth COURT, INCLUDING THE RIGHT TO A JURY on our website: TRIAL AND THE RIGHT TO PARTICIPATE IN A https://www.sunnova.com/privacy-policy You CLASS ACTION OR SIMILAR PROCEEDING. IN also understand that Sunnova's Privacy Policy ARBITRATION, A DISPUTE IS RESOLVED BY AN may be changed from time to time. ARBITRATOR INSTEAD OF A JUDGE OR JURY. d. Monitoring and Recording Telephone In this Section, the words"you" and"your" mean any Calls. We and others acting on our behalf person signing this PPA as a Homeowner or Co- may(a) monitor and record telephone calls Homeowner. Unless the context requires otherwise, between you and us regarding this PPA and the words"we,""us"and"our"mean Sunnova and any (b) use automatic dialing equipment to make assignee of this PPA. calls to you. You expressly consent to our, The laws of the state where your Home is located and others acting on our behalf, using shall govern the substance of your claims under this prerecorded/artificial voice messages, or text PPA without giving effect to conflict of laws principles. messages,while servicing and enforcing our You and we agree that any dispute, claim or rights under this PPA, including the collection disagreement between you and us(a"Dispute")shall of outstanding payments. In making calls to be resolved exclusively by arbitration except as you, you agree that we, and others acting on specifically provided below. Disputes covered by this our behalf, may use any telephone number agreement include but are not limited to: claims you provide us, or that is lawfully given to us arising out of or relating to this PPA; claims arising out by someone other than you even if the of or relating to our relationship; claims that arose number is for a mobile telephone, and even if before this or any prior agreement(including, but not our doing so results in charges to you under limited to, claims relating to advertising); consumer your telephone payment plan. We will not protection claims; and claims under any federal or charge you for such calls. state statute. oHomeowner(s)'Initials The arbitration, including the selection of the arbitrator, will be administered by the American Arbitration Association ("AAA") under its Consumer Arbitration Rules (the"Rules") by a single neutral 17. SYSTEM REMOVAL; RETURN arbitrator. Either party may initiate the arbitration process by filing the necessary forms with the AAA. At the end of the Term or the termination of this PPA, To learn more about arbitration before the AAA, you if you have not renewed this PPA or exercised your can review materials available at www.adr.org. The purchase option (if any) and you have not defaulted, arbitration shall be held in the location that is most then within ninety(90) days you agree to call Sunnova convenient to your Home. If the AAA is unavailable to at the telephone number listed in Exhibit 2, or any administer the dispute, then the arbitration, including other number we notify you of in the future, to the selection of the arbitrator, will be administered by schedule a convenient time for Sunnova to remove JAMS, under its Streamlined Arbitration Rules(the the System from your Home at no cost to you unless "Rules") by a single neutral arbitrator agreed on by the the termination was due to your default which is parties within thirty(30)days of the commencement of addressed in Section 15. the arbitration. If JAMS is not available either, then 18. APPLICABLE LAW the parties shall select another recognized arbitration administrator which can offer a location for arbitration The laws of the state where your Home is located, that is close to your Home. without giving effect to conflict of laws principles, shall If you initiate the arbitration, you will be required to govern this PPA, except the Federal Arbitration Act, 9 pay the first$125 of any filing fee. We will pay any U.S.C. § 1, et seq., shall govern interpretation, filing fees in excess of$125 and we will pay all of the enforcement and proceedings under Section 19, and arbitration fees and costs. If we initiate the arbitration, we will pay all of the filing fees and all of the 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 13 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S. 0 1 n ` `a Sunnova Home Solar Service V (� Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing arbitration fees and costs. The parties will each bear WILL NOT HAVE THE RIGHT TO LITIGATE THAT all of our own respective attorney's fees, witness fees, DISPUTE IN COURT, OR TO HAVE A JURY TRIAL and costs unless the arbitrator decides otherwise. ON THAT DISPUTE, OR ENGAGE IN DISCOVERY The arbitrator shall have the authority to award any EXCEPT AS PROVIDED FOR IN THE RULES. legal or equitable remedy or relief that a court could FURTHER, YOU WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A REPRESENTATIVE OR order or grant under this PPA. The arbitrator, MEMBER OF ANY CLASS PERTAINING TO ANY however, is not authorized to change or alter the DISPUTE. THE ARBITRATOR'S DECISION WILL BE terms of this PPA or to make any award that would FINAL AND BINDING ON THE PARTIES AND MAY extend to any transaction other than yours. All BE ENTERED AND ENFORCED IN ANY COURT statutes of limitation that are applicable to any Dispute shall apply to any arbitration between you and us. The HAVING JURISDICTION, EXCEPT TO THE EXTENT IT IS SUBJECT TO REVIEW IN ACCORDANCE arbitrator will issue a decision or award in writing, briefly stating the essential findings of fact and WITH APPLICABLE FEDERAL LAW GOVERNING conclusions of law. ARBITRATION AWARDS. OTHER RIGHTS THAT YOU OR WE WOULD HAVE IN COURT MAY ALSO Only Disputes involving you and us may be addressed NOT BE AVAILABLE IN ARBITRATION. in the arbitration. Disputes must be brought in the ALL DISPUTES AND DETERMINATIONS name of an individual person or entity and must CONCERNING THE ARBITRABILLITY OF A CLAIM proceed on an individual (non-class, non- (INCLUDING DISPUTES ABOUT THE SCOPE, representative) basis. The arbitrator will not award APPLICABILITY, ENFORCEABILITY, relief for or against anyone who is not a party to the REVOCABILITY, UNCONSCIONABILITY, OR Dispute. If you and we arbitrate a Dispute, none of VALIDITY OF THIS LEASE OR THIS SECTION) you or us, nor any other person, may pursue the SHALL BE DECIDED BY THE ARBITRATOR. Dispute in arbitration as a class action, class arbitration, private attorney general action or other NOTWITHSTANDING THE FOREGOING, NOTHING representative action, nor may any such Dispute be HEREIN CONTAINED SHALL BAR YOU OR US pursued on your or our behalf in any litigation in any FROM: (I) OBTAINING INJUNCTIVE RELIEF FROM court except as specifically provided below. Claims A COURT AGAINST THREATENED CONDUCT regarding any Dispute and remedies sought as part of THAT COULD CAUSE IRREPARABLE HARM, LOSS a class action, class arbitration, private attorney OR DAMAGE, UNDER THE USUAL EQUITY RULES, general or other representative action are subject to INCLUDING THE APPLICABLE RULES FOR arbitration only on an individual (non-class, non- OBTAINING RESTRAINING ORDERS AND representative) basis, and the arbitrator may award PRELIMINARY INJUNCTIONS; OR(II) OBTAINING A relief only on an individual (non-class, non- JUDGMENT FROM A COURT HAVING representative) basis. This means that the arbitration JURISDICTION CONFIRMING THE AWARD OF THE may not address disputes involving other persons with ARBITRATOR; OR(III) OBTAINING RESOLUTION disputes similar to the Disputes between you and us. OF A DISPUTE IN A SMALL CLAIMS COURT IF THE If any part of this paragraph of this Section is found to DISPUTE FALLS WITHIN THE JURISDICTION OF be unenforceable by an arbitrator or a court having THE SMALL CLAIMS COURT(PROVIDED, jurisdiction over a Dispute, then this entire Section HOWEVER, THAT NO ATTEMPT IS MADE TO (except for this sentence and the following sentence) TRANSFER RESOLUTION OF SUCH A DISPUTE shall be automatically inapplicable to that Dispute. FROM A SMALL CLAIMS COURT TO A COURT OF EVEN IF ANY PART OF THIS SECTION IS FOUND GENERAL JURISDICTION). TO BE UNENFORCEABLE AS DESCRIBED ABOVE, YOU UNDERSTAND THAT BY SIGNING BELOW YOU AND WE EACH AGREE TO WAIVE THE RIGHT YOU ARE VOLUNTARILY AGREEING TO TO A TRIAL BY JURY IN CONNECTION WITH ANY ARBITRATE DISPUTES ARISING UNDER THIS DISPUTE THAT MIGHT ARISE BETWEEN OR AGREEMENT AND THAT YOU GIVE SPECIFIC INVOLVING YOU AND US,AND THE RIGHT TO AUTHORIZATION TO SUBMIT TO ARBITRATION PARTICIPATE IN A CLASS ACTION OR SIMILAR AND AGREE TO THE PROVISIONS IN THIS PROCEEDING IN CONNECTION WITH ANY SUCH SECTION: DISPUTE. Homeowner(s)'Signature BECAUSE YOU AND WE HAVE AGREED TO r—DocuSignedby: ARBITRATE ALL DISPUTES EXCEPT AS STIN oke otV SPECIFICALLY PROVIDED IN THE LAST •-08ODF994A27648F.. PARAGRAPH OF THIS SECTION, YOU AND WE 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 14 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 Sunnova Home Solar Service S u l n V Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing 20. WAIVER Sunday or a holiday, and in counting a period of Any delay or failure of a party to enforce any of the "business days"all Saturdays, Sundays and holidays provisions of this PPA, including but not limited to any should be excluded. remedies listed in this PPA, or to require performance 24. PUBLICITY by the other party of any of the provisions of this PPA, Sunnova will not publicly use or display any images of shall not be construed to(i) be a waiver of such the System unless you initial the space below. If you provisions or a party's right to enforce that provision; initial the space below, you give us permission to take or(ii)affect the validity of this PPA. pictures of the System as installed on your Home to 21. NOTICES show to other customers or display on our website. With the exception of the Notice of Cancellation in Homeowner(s)'Initials Exhibit 1, all notices under this PPA shall be in writing and shall be by personal delivery, facsimile transmission, electronic mail, overnight courier, or certified or registered mail, return receipt requested, 25. COUNTERPARTS and deemed received upon personal delivery, acknowledgment of receipt of electronic transmission, This PPA may be executed simultaneously in any the promised delivery date after deposit with overnight number of counterparts. Each counterpart shall be courier, or five(5) days after deposit in the mail. deemed to be an original, and all such counterparts Notices shall be sent to the person identified in this shall constitute one and the same instrument. The PPA at the addresses set forth in this PPA or such parties agree that this PPA and signature pages may other address as either party may specify in writing. be signed electronically and transmitted between Each party shall deem a document faxed to it as an them by facsimile or by electronic mail and that original document. electronic, faxed and PDF signatures shall constitute 22. ENTIRE AGREEMENT; CHANGES original signatures and that an electronic, faxed or PDF signature page containing the signature This PPA contains the parties'entire agreement (electronic, faxed, PDF or original) is binding upon the regarding the sale and purchase of power generated parties. by the System. There are no other agreements 26. FURTHER ASSURANCES regarding this PPA, either written or oral. Any change to this PPA must be in writing and signed by both You will cooperate fully with us to effect the intent and parties. If any portion of this PPA is determined to be provisions of this PPA and, from time to time, to unenforceable, the remaining provisions shall be execute and deliver any and all other agreements, enforced in accordance with their terms or shall be documents or instruments, and to take such other interpreted or re-written so as to make them actions, as Sunnova may determine to be reasonably enforceable. necessary or desirable to effect the intent and 23. HEADINGS AND INTERPRETATION provisions of this PPA. The headings in this PPA are for convenience or 27. COMMUNICATIONS EQUIPMENT reference only. They do not limit or modify the term or During installation or at any time thereafter during the provision. In some sections where examples are Term,we may install, replace or update given, you acknowledge that the examples cover communication equipment(for example, an antenna) some, but not all, of the situations or items that are (the"Communication Equipment")at the Home.The covered by the section or the PPA. Communication Equipment will be used in connection Unless specifically referred to as"business day(s)", all with the System and to enhance connectivity and references to"day"or"days"shall mean calendar communication. If you initial the space below, you give days, meaning every consecutive day on the calendar Sunnova consent for the installation of the including holidays and weekends.All periods stated in Communication Equipment, if,when, and as needed. days should count every day including intermediate Homeowner(s)'Initials Saturdays, Sundays and holidays and include the last day of the period, but if the last day is a Saturday, Sunday or a holiday, the period continues to run until the end of the next day that is not a Saturday, Sunday or a holiday. All references to"business day(s)" mean only those calendar days that are not Saturday, 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 15 Contract ID: SG004996973 tt DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S U 1 n ` ,a Sunnova Home Solar Service �/ (� Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing REST OF PAGE INTENTIONALLY LEFT BLANK 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 16 Contract ID: SG004996973 �, DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S n V/�{ Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing 28. SIGNATURES I have read this Power Purchase Agreement, including Schedule A, and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. DO NOT SIGN THIS POWER PURCHASE AGREEMENT IF THERE ARE ANY BLANK SPACES. NOTICE OF RIGHT TO CANCEL: YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE SEVENTH BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION. SEE EXHIBIT 1, THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. Homeowner's .�'° ^ sitAAT1NnL EMERALD Signature: JUS ' `N -f W Date: August 30, 2022 I 15:00 MDT 0800F994A27648F... Co-Homeowner's Name(if any): Signature: Date: Sunnova Energy Corporation .411 John Santo Salvo Authorized Signatory 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 17 Contract ID:SG004996973 DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 S "n M Sunnova Home Solar Service V Q Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing SCHEDULE A VALUE STATEMENT Estimated Solar Energy Production Estimated First Year Annual Production: 17,615 kWh Estimated Initial Term Total Production: 414,944 kWh Payment Terms Upfront Payment Amount: $0.00 Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.90%/year First Year Solar Energy Rate, if paid by auto-ACH: $0.179/kWh First Year Solar Energy Rate, if not paid by auto-ACH: $0.197/kWh Reduced Annual Solar Energy Rate', if paid by $0.179/kWh auto-ACH: Reduced Annual Solar Energy Rate', if not paid $0.197/kWh by auto-ACH: Estimated Monthly Bill in First Year, if paid by auto- $262.76/month ACH: Estimated Monthly Bill in First Year, if not paid by $289.04/month auto-ACH: 2)Reduced Annual Solar Energy Rate applies if an Upfront Payment is made. By your initials here you acknowledge that you have reviewed this Schedule A. Homeowner(s)'Initials ,— Ds Prepay Option Purchase Option End of Annual Price Annual Price Estimated kWh Estimated Price to Minimum Cash Year per kWh per kWh per year Prepay the Remainder Purchase Price' (assuming payment (assuming payment by of the Initial Term2 NOT by ACH)3 ACH)3 1 $0197 $0179 17,615 $57,554.43 $0.00 $0.203 w $0.184 ...._ 17,527 $57,124.45 : $0.00 3 $0 208 $0.190 17,440 $56 585 83 $0.00 4 $0.215 $0 195 17,352 $55,939.30 $0.00 5 $0.221 $0 201 17,266 $55,177.52 $0.00 6 $0 22 .,.... $0.207 17,179 . $54,300.47 $56,272.03 7 $0 234 $0.212 17,093 $53,284.94 $54,849.88 8 ` $0.241' $0.219 17,008 $52,129.64 $53,297.01 9 $0 247 $0.225 16,923 $50,825 46 $51,604.54 10 $0.255 ..... $0232 16,838 $49,369 87. ..: _ $49 770 30 11 $0.262 $0 238 16,754 $47,738 90 $47,770.33 12 $0270 $0 245 16,670 $45 92&59 $45 928.59 13 $0.277 $0.252 16,587 $43,927.64 $43,927.64 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date.8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 18 Contract ID: SG004996973 1 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S U n n `V'a`' Sunnova Home Solar Service a Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing 14w.2. - $t?.ZfiO _.. 16,504 _.. - $41,730 24` _.. . _., ... $41,73024_ 15 $0.294 $0.267 16,421 $39,311.89 $39,311.89 '16 .. _. _$0 3E ___r.__., ._:._..$Q 275__ 16 339 $ ,66 51 LL- _.,. - t •17 17 $0.311 $0.283 16,258 $33,776.08 $33,776.08 $0 30 _.... $0.291 16k176 30Y634 57 $3C},634.57 19 $0.329 $0.299 16,096 $27,215.97 $27,215.97 20 $0.339 $9.308... 16,015 `> 3 3 21 $0.349 $0.317 15,935 $19,494.42 $19,494.42 22 _.. $0.359 $0.326 15,855, $15 F5$.69 15,158: 9 23 $0.369 $0.336 15,776 $10,476.76 $10,476.76 24... $0 380 $O.345 15,697 ._ $5 434 9$ . $44 5 25 $0.391 $0.355 15,619 $0.00 $0.00 1)Per Section 9,the price you will pay to purchase the System will be the greater of the System's fair market value("FMV")and the amount shown above as the Purchase Option on Schedule A.In the event that you made an Upfront Payment,the Minimum Cash Purchase Price is reduced to reflect the receipt of the Upfront Payment. 2)Per Section 4(k)of the PPA,the prepayment amounts shown above reflect a 5%present value discount rate. In the event you made an Upfront Payment,the prepay option price is reduced to reflect the receipt of the Upfront Payment. 3)If you made an Upfront Payment,this rate is the Reduced Annual Solar Energy Rate. 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com Date:8/30/2022 ©2018 Sunnova Energy Corporation.All Rights Reserved. 19 Contract ID: SG004996973 .. 4 j DocuSign Envelope ID:AE3D3�8822-628E-41 B3-8146-AD890773E850 SUPf V a N Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 1 NOTICE OF CANCELLATION Date of Transaction: August 30, 2022 I 15:00 MDT You may cancel this transaction, without any penalty or obligation, within seven (7) business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation)of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller(Sunnova Energy Corporation) at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller(Sunnova Energy Corporation) regarding the return shipment of the goods at the seller's (Sunnova Energy Corporation's) expense and risk. If you do make the goods available to the seller(Sunnova Energy Corporation) and the seller(Sunnova Energy Corporation) does not pick them up within 20 days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation), or if you agree to return the goods to the seller (Sunnova Energy Corporation) and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice, or any other written notice, or send a telegram to Sunnova Energy Corporation, 20 Greenway Plaza, Ste 475, Houston, TX 77046 not later than midnight of the date that is seven (7) business days from the Transaction Date indicated above. I hereby CANCEL/RESCIND this transaction on [Cancellation Date]. Homeowner's Signature: Co-Homeowner's Signature: JUSTIN EMERALD Installation Address: 229 GREAT WESTERN RD SOUTH YARMOUTH, MA 02664 Contract ID: SO004996973 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 1 Contract ID: SG004996973 DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 su n" va Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 1 NOTICE OF CANCELLATION (DUPLICATE) Date of Transaction: August 30, 2022 I 15:00 MDT You may cancel this transaction, without any penalty or obligation, within seven (7) business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation) of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller(Sunnova Energy Corporation) at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller(Sunnova Energy Corporation) regarding the return shipment of the goods at the seller's (Sunnova Energy Corporation's) expense and risk. If you do make the goods available to the seller(Sunnova Energy Corporation) and the seller(Sunnova Energy Corporation) does not pick them up within 20 days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation), or if you agree to return the goods to the seller(Sunnova Energy Corporation) and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice, or any other written notice, or send a telegram to Sunnova Energy Corporation, 20 Greenway Plaza, Ste. 475, Houston, TX 77046 not later than midnight of the date that is seven (7) business days from the Transaction Date indicated above. I hereby CANCEL/RESCIND this transaction on [Cancellation Date]. Homeowner's Signature: Co-Homeowner's Signature: JUSTIN EMERALD Installation Address: 229 GREAT WESTERN RD SOUTH YARMOUTH, MA 02664 Contract ID: SG004996973 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 2 Contract ID: SG004996973 si DocuSign Envelope ID:AE3D3�8822-628E-41 B3-8146-AD890773E850 SU f n V a Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing EXHIBIT 2 LIMITED WARRANTY 1. INTRODUCTION This Limited Warranty(this"Limited Warranty") is Sunnova's agreement to provide you warranties on the System you are hosting pursuant to our PPA. The System will be professionally installed by a contractor acting on Sunnova's behalf at the address you listed in the PPA.We will refer to the installation location as your"Property"or your"Home." This Limited Warranty begins when our contractor starts installing the System at your Home. We look forward to helping you produce clean, renewable solar power at your Home.To the extent that you prepay the PPA or purchase the System during the Term of the PPA, this Exhibit 2 shall continue to apply and be enforceable until what would have been the end of the original Term. For purposes of this Limited Warranty the term "Sunnova" means Sunnova Energy Corporation or its successors and assigns. 2. LIMITED WARRANTIES a. Limited Warranties Sunnova warrants the System as follows: (i) System Warranty During the entire Power Purchase Agreement Term, under normal use and service conditions, the System will be free from defects in workmanship or defects in, or a breakdown of, materials or components(the"System Warranty"); (ii) Roof Warranty When our contractors penetrate your roof during a System installation we will warrant roof damage caused by our contractors due to our roof penetrations. This roof warranty will run the longer of(A)ten(10)years following the completion of the System installation; and (B)the length of any existing installation warranty or new home builder performance standard for your roof(the"Roof Warranty Period"); and (iii) Repair Promise During the entire Power Purchase Agreement Term, Sunnova will honor the System Warranty and will repair or replace any defective part, material or component or correct any defective workmanship, at no cost or expense to you(including all labor costs),when you submit a valid claim to us under this Limited Warranty. If our contractors damage your Home,your belongings or your Property we will cause our contractors to repair the damage they cause or pay you for the damage as described in Section 6. Sunnova may use new or reconditioned parts when making repairs or replacements. Sunnova may also, at no additional cost to you, upgrade or add to any part of the System as it deems advisable in its discretion. Cosmetic repairs that do not involve safety or performance shall be made at Sunnova's discretion. b. Warranty Length (i) The warranties in Sections 2(a)(i) and 2(a)(iii)above will start when our contractors begin installing the System at your Home and continue through the entire Power Purchase Agreement Term but never less than ten (10) years.Thus,for as long as you host the System from Sunnova under a PPA, you will have a System Warranty and our Repair Promise. (ii) The Roof Warranty Period may be shorter than the System Warranty, as described in Section 2(a)(ii) above. (iii) If you have assumed an existing PPA in accordance with the terms and conditions of the PPA, then this Limited Warranty will cover you for the remaining balance of the existing Power Purchase Agreement Term. c. Maintenance and Operation (i) General When the System is installed Sunnova will provide you with a copy of its Solar Service Guide.The Solar Service Guide provides you with information about your System and solar energy, monitoring and maintenance instructions, answers to frequently asked questions and service information. 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International,Inc.All Rights Reserved. 1 Contract ID:SG004996973 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 sU „i n va Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing (ii) Power Monitor The Power Monitor requires access to cellular networks in order to operate. If cellular service is not available then (A)we will not be able to monitor the System; and(B)you will be required to provide Sunnova with annual production information from your inverter or(C)Sunnova, in its sole discretion, will estimate production. In connection with any such estimated production by Sunnova, Sunnova will make commercially reasonable methods to estimate the missing kWh based on available information and such estimate will be included in the calculations under Schedule A for such period. In the event that no such information is reasonably accessible, Sunnova will make the adjustment based on the original kWh expectation attributable to such period. d. Making a Claim; Transferring this Warranty (i) Claims Process You can make a claim by: A. emailing us at the email address in Section 7 below; B. writing us a letter at the mailing address in Section 7 below and sending it overnight mail with a well-known service; C. sending us a fax at the number in Section 7 below; or D. creating a claim through our online customer portal(as more particularly set forth in the Solar Service Guide when the System is installed). (ii) Transferable Limited Warranty Sunnova will accept and honor any valid and properly submitted Warranty claim made during any Term by any person who either purchases the System from you or to whom you properly transfer the PPA in accordance with the terms and conditions contained in the PPA. e. Exclusions and Disclaimer The limited warranties provided in this Limited Warranty do not apply to any lost power production or any repair, replacement or correction required due to the following: (i) someone other than Sunnova or its approved service providers installed, removed, re-installed or repaired the System; (ii) destruction or damage to the System or its ability to safely produce power not caused by Sunnova or its approved service providers while servicing the System (e.g., if a tree falls on the System we will replace the System per the Power Purchase Agreement, but we will not repay you for power it did not produce); (iii) your failure to perform, or breach of, your obligations under the Power Purchase Agreement(e.g., you modify or alter the System); (iv) your failure to promptly submit a claim or report damage or an unsafe condition, resulting in the exacerbation of the damage or condition; (v) your breach of this Limited Warranty, including your being unavailable to provide access or assistance to us or our contractors in diagnosing or repairing a problem, or your failing to maintain the System as stated in the Solar Service Guide; (vi) any Force Majeure Event(as defined below); (vii) shading from foliage that is new growth or is not kept trimmed to its appearance on the date the System was installed; (viii) any system failure or lost production not caused by a System defect(e.g.,the System is not producing power because it has been removed to make roof repairs or you have required us to locate the inverter in a non- shaded area); (ix) theft of the System (e.g., if the System is stolen we will replace the System per the Power Purchase Agreement, but we will not repay you for the power it did not produce); 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 2 Contract ID:SG004996973 DocuSign Envelope ID:AE3D3�8822-628E-41 B3-8146-AD890773E850 SU n 1 V a Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing (x) a power or voltage surge caused by someone other than Sunnova or the Installer, including a grid supply voltage outside of the standard range specified by the local utility or the System specifications or as a result of a local power outage or curtailment; and (xi) a change in usage of the Property or any buildings at or near such Property that may affect insolation without Sunnova's prior written approval. This Limited Warranty gives you specific rights, and you may also have other rights which vary from state to state. This Limited Warranty does not warrant any specific electrical performance of the System. THE LIMITED WARRANTIES DESCRIBED IN SECTION 2(a)ABOVE ARE THE ONLY WARRANTIES MADE BY SUNNOVA WITH RESPECT TO THE SYSTEM.SUNNOVA HEREBY DISCLAIMS,AND ANY BENEFICIARY OF THIS LIMITED WARRANTY HEREBY WAIVES,ANY WARRANTY WITH RESPECT TO ANY COST SAVINGS FROM USING THE SYSTEM.WITHOUT LIMITING THE FOREGOING THERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED,AS TO THE MERCHANTABILITY, FITNESS FOR ANY PURPOSE, CONDITION, DESIGN, CAPACITY, SUITABILITY OR PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. 3. SUNNOVA'S STANDARDS For the purpose of this Limited Warranty the standards for our performance will be(i)normal professional standards of performance within the solar photovoltaic power generation industry in the relevant market; and(ii) Prudent Electrical Practices. "Prudent Electrical Practices"means those practices, as changed from time to time, that are engaged in or approved by a significant portion of the solar power electrical generation industry operating in the United States to operate electric equipment lawfully and with reasonable safety, dependability, efficiency and economy. 4. SYSTEM REPAIR, RELOCATION OR REMOVAL a. You agree that if(i)the System needs any repairs that are not the responsibility of Sunnova under this Limited Warranty, (ii)the System needs to be removed and reinstalled to facilitate remodeling of your Home or(iii)the System is being relocated to another home you own pursuant to the Power Purchase Agreement, you will have Sunnova, or another qualified service provider we approve, at your expense, perform such repairs, removal and reinstallation, or relocation on a time and materials basis. b. If you want to return the System to Sunnova under Section 17 of the Power Purchase Agreement then Sunnova will cause our contractors to remove the System at no cost to you. Sunnova will cause our contractors to remove the posts, waterproof the post area and return the roof as close as is reasonably possible to its original condition before the System was installed(e.g. ordinary wear and tear and color variances due to manufacturing changes are excepted). Sunnova will warrant the waterproofing for one(1)year after it removes the System. You agree to reasonably cooperate with Sunnova or its contractors in removing the System including providing necessary space, access and storage, and we or our contractors will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. 5. FORCE MAJEURE If Sunnova is unable to perform all or some of its obligations under this Limited Warranty because of a Force Majeure Event, Sunnova will be excused from whatever performance is affected by the Force Majeure Event, provided that: a. Sunnova, as soon as is reasonably practical, gives you notice describing the Force Majeure Event; b. Sunnova's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e.,when a Force Majeure Event is over,we will make repairs); and c. No Sunnova obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result of such Force Majeure Event. "Force Majeure Event" means any event, condition or circumstance beyond the control of and not caused by Sunnova's fault or negligence. It shall include,without limitation,failure or interruption of the production, delivery or acceptance of power due to: an act of god;war(declared or undeclared); sabotage; riot; insurrection; civil unrest or disturbance; military or guerilla action;terrorism; economic sanction or embargo; civil strike, work stoppage, slow-down, or lock-out; explosion; fire; earthquake; pandemic; abnormal weather condition or actions of the elements; hurricane;flood; lightning; wind; drought;the binding order of any governmental authority(provided that such order has been resisted in good faith by all reasonable legal means);the failure to act on the part of any governmental authority(provided that such action has 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International,Inc.All Rights Reserved. 3 Contract ID:SG004996973 . . DocuSign Envelope ID:AE3D3`8822-628B-41 B3-8146-AD890773E850 n n V a i Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing been timely requested and diligently pursued); unavailability of power from the utility grid, equipment, supplies or products(but not to the extent that any such availability of any of the foregoing results from Sunnova's failure to have exercised reasonable diligence); power or voltage surge caused by someone other than Sunnova including a grid supply voltage outside of the standard range specified by your utility; and failure of equipment not utilized by Sunnova or under its control. Where not excused, performance times under this Limited Warranty may be considered extended for a period of time equivalent to the time lost due to such conditions. In certain circumstances,when the System will need to be repaired, but access is limited due to a Force Majeure Event,the obligations under the Limited Warranty and the Agreement may be suspended, in Sunnova's sole discretion, during the duration of the Force Majeure Event and then the term of the PPA will be extended for a period of time equivalent to the time lost due to such Force Majeure conditions. 6. LIMITATIONS ON LIABILITY a. No Consequential Damages IN NO EVENT SHALL SUNNOVA OR ITS AGENTS OR CONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL, INDIRECT, PUNITIVE, EXEMPLARY, INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES, SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. b. Limitation of Duration of Implied Warranties IN THE EVENT THAT ANY IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING UNDER STATE LAW THAT CANNOT BE WAIVED, SUCH WARRANTIES SHALL IN NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARRANTY PERIOD IN THIS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS, SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. c. Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary, Sunnova's total liability arising out of or relating to this Limited Warranty shall in no event: (i) For System Replacement:the original cost of the System; and (ii) For damages to your Home, Belongings and Property: exceed five hundred thousand dollars($500,000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Power Purchase Agreement to the addresses listed below: TO SUNNOVA: Sunnova Energy Corporation P.O. Box 56229 Houston,TX 77256-6229 Attention: Warranty Claims Telephone: 281.985.9900 Facsimile: 281.985.9907 Email: customerservice@sunnova.com TO YOU:At the billing address in the Power Purchase Agreement or any subsequent billing address you give us. 8. ASSIGNMENT AND TRANSFER OF THIS LIMITED WARRANTY Sunnova may assign its rights or obligations under this Limited Warranty to a third party without your consent, provided that any assignment of Sunnova's obligations under this Limited Warranty shall be to a party professionally and financially qualified to perform such obligation. This Limited Warranty protects only the person who hosts the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer the Power Purchase Agreement in accordance with the terms and 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 4 Contract ID:SG004996973 4, DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 sun" va { Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing conditions contained in the PPA.This Limited Warranty contains the parties'entire agreement regarding the limited warranty of the System. 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2021 Sunnova Energy International, Inc.All Rights Reserved. 5 Contract ID:SG004996973 DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 S fl f a Sun nova Home Solar Service (� Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing STATE SPECIFIC EXCEPTIONS,TERMS AND CONDITIONS The following provisions are hereby agreed to by Sunnova and you Registration:All home improvement contractors and subcontractors shall be registered. Any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza, Suite 5170 Boston, MA 02116 Phone: (617)973-8700 Permits: Contractor shall obtain any and all necessary construction-related permits. Owners who secure their own construction-related permits or deal with unregistered contractors shall be excluded from access to the Guarantee Fund. Arbitration: The signatures of the parties to the arbitration provision apply only to the agreement of the parties to alternate dispute resolution initiated by the contractor. The owner may initiate alternative dispute resolution even where the arbitration section is not signed separately by the parties. 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com ©2018 Sunnova Energy Corporation.All Rights Reserved. 1 Contract ID:SG004996973 4• DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 SOLAR PPA DISCLOSURE This disclosure is designed to help you understand the terms and costs of your purchasing power from a solar electric system ("System"). It is not a substitute for the power purchase agreement("PPA")and other documents associated with this transaction. All information presented below is subject to the terms of your PPA. Read all documents carefully so you fully understand the transaction. For more information on being a smart solar consumer please visit www.seia.org/consumers. PROVIDER: INSTALLER: WARRANTY/MAINTENANCE Sunnova Energy Corporation Trinity Solar PROVIDER: 20 E.Greenway Plaza,Ste 475 2211 Allenwood Road (Same as Provider) Houston,TX 77046 - Wall Address: Tel.: 281-985-9900 NJ License#(if applicable): 7719 Tel.: Sunnova MA 184093 Tel:(732)780-3779 License#(if applicable): Email:customerservice@sunnova.com Email:sales.ops@trinity-solar.com Email: License: CA: 1072590;CT:0635520; ELC.0195559-E1 I DE: 2066600876;T1-0005929 I FL:CVC57148 I MA: 170355; 21233A I MD: 132333; 11834 1 0491C I NH:0491C I NJ: 13VH01244300;Electrical Business Permit#34EB01547400 NY:52821-H;H.2409780100;L004203 I PA:PA128551 I RI: 39372; AC005040 SALESPERSON: Matthew Albano HIS#: Trinity Solar 2211 Allenwood Road Wall NJ 7719 Tel:7744874746 Email:matthew.albano@trinity-solar.com CUSTOMER: JUSTIN EMERALD Customer ID: SG004996973 System Installation Address: 229 GREAT WESTERN RD,SOUTH YARMOUTH,MA,02664,United States Customer Mailing Address:229 GREAT WESTERN RD,SOUTH YARMOUTH,MA,02664,United States Email: ilovemybabies5683.wge@gmail.com Contract Date: August 30, 2022 I 15:00 MDT *NOTE:YOU ARE ENTERING INTO AN AGREEMENT TO PURCHASE POWER,NOT TO PURCHASE THE SYSTEM. YOU WILL NOT OWN THE SYSTEM INSTALLED ON YOUR PROPERTY. Electricity Rate&Term(A) Amount Due Up-Front(B) Other Possible Charges(C) ❑Your rate per kilowatt-hour(kWh)for the Amount you owe at PPA signing: Other charges you may have to power produced:$$0.179 Your monthly $0.00 pay under your PPA: payments will be the amount of energy the System produces times the above rate. Amount you owe at the commencement of installation: Late Charge: ®You have a fixed monthly payment PPA. $0_00 If a payment is more than 20 days Your monthly payment during the first year of late,payments accrue interest at the PPA:$262.76(includes ACH discount) Amount you owe provider at the completion of 1%per month OR 12%annually Your estimated first year production: installation(without deducting any upfront or down not to exceed the maximum 17,615.26 kWh payment):$106,120.97(payable in monthly payments). allowable by law. • DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 Estimated System Removal The initial term of your PPA: Fee: ®25.00 Years At homeowner's expense if ®300 Months Down payment you owe the Provider: required within the Initial Term. $0.00 Removal cost TBD upon removal Incentives included in your rate per kilowatt- request. hour(kWh)or monthly fixed fee: Upfront Payment you owe the Provider: UCC Notice Removal and Re- $0.00 filing Fee: ®NoneEl If you refinance your mortgage, you may have to pay for fees charged to us by the local See Box F:"PPA Payment Escalator"for jurisdiction and processing fees. factors that may affect the amount of your rate Returned Checks: per kWh and therefore your future monthly If any check is retumed or refused payments. by your bank,you may be charged:$25.00(or a lower amount if required by law) Non-Connection to Internet: If you do not maintain a high- speed intemet connection,you will be charged a monthly fee of$0.00 and/or your monthly payment may be based upon estimates. Automatic Bank Withdrawals (ACH): 10%per month discount if you pay your PPA using automatic bank withdrawals. Number of Monthly Payments(D) When Payments Are Due(E) PPA Payment Escalator(F) Number of monthly payments:300 Your first Monthly Payment(which includes sales tax,if Your PPA MAY or MAY NOT have applicable and ACH discount)of$262.76 is due on the first a payment escalator. If your PPA Payment Date.During contract validation,you will choose one of HAS a payment escalator,your the available payment date options for your Payment Date.After ppa payment will INCREASE your first Monthly Payment,299 additional Monthly Payments will ANNUALLY by 2.90 be due on the same day of each following month. Please refer to Schedule A for the amounts of these payments. Provider will provide you with: ®Electronic Invoices(sent to your email address above) ['Paper Invoices(sent to your U.S.mail address above Site&Design Assumptions for your PPA(G) • Estimated size of System in kilowatts:13.200 jkW) • Estimated gross annual electricity production in kilowatt-hours(kWh)from your PPA: 17.615.26 • Estimated annual system production decrease due to natural aging of system:0.50% • Estimated System electricity production for the entire initial term of your PPA:414,944.16(kWh) • System location:229 GREAT WESTERN RD,SOUTH YARMOUTH,MA,02664,United States • Connectivity:The solar system®WILL O WILL NOT be connected to the electric grid. • At the time of installation,your local utility ®DOES ❑DOES NOT credit you for excess energy your System generates.The rules a•.1 in•to such credit are set b our.urisdiction. Security Filings(H) Provider OWILL I WILL NOT take a security interest in your real property by terms of the PPA(e.g.a lien on your home) DocuSign Envelope ID:AE3D3882-6286-41 B3-8146-AD890773E850 Provider®WILL❑WILL NOT file a fixture filing or a UCC-1 on the system(a public filing informing others that Provider owns the system,but does not out a lien on the home Repair&Maintenance(I) "System maintenance"refers to the upkeep and services required or recommended to keep your System in proper operation.System maintenance®IS❑IS NOT included for 25 years by Provider(e.g.,Installer,Maintenance Provider).You are required to perform the following system maintenance:Keep modules and panels clean and maintain level of shading in existence at time of installation See Agreement$5 "System repairs"refers to actions needed to fix your System if it is malfunctioning.System repairs®ARE❑ARE NOT provided by the Provider(e.g.Installer,Other). Please review your PPA and Limited Warranty for additional information about any warranties on the System installation and equipment.Certain exclusions ma al•I .Note that equipment warranties for hardware are not rea uired to include labor/workmanship. Roof Warranty(J) Your roof • IS■ IS NOT warranted against leaks from the System installation for 10 years. Your roof® IS ❑IS NOT warranted against leaks caused by removal of the System for a period of 1 year(s)following system removal. Any portions of your roof impacted by the System ®WILL 0 WILL NOT be substantially returned to their original condition following the removal of the S stem ordina wear and tear exce'ted . Transferring Your PPA and Selling Your Home(K) If you sell your home,you ® MAY El MAY NOT transfer the PPA to the purchaser(s)of your home. If you may transfer the PPA,the transfer will be subject to the following conditions: ®Credit check on the purchaser(s)(unless you paid in full upfront) ®Minimum FICO score requirement: 650(unless you paid in full upfront) ❑Transfer fee of$ ®Assumption of PPA by purchaser(s) ❑Other If you sell your home,you®ARE❑ARE NOT permitted to move the solar system to a new home. You ma also have the o.tions to purchase the s stem or•repa some or all of the balance as,art of a transfer. Transfer of Obligations by Provider(L) The PPA may be assigned,sold or transferred by Provider without your consent to a third-party that will be bound to all the terms of the PPA.If such a transfer occurs,you will be notified if this will change the address or phone number to use for PPA questions,payments,maintenance or service requests. Performance or Prduction Guarantee(M) In terms of your full System,Provider is providing you with a: /1 System Performance or electricity production guarantee ❑Other type of System guarantee ❑No System guarantees You ma have additional •uarantees or warranties in addition to those that cover the entire S tem. Taxes(N) You are responsible for property taxes on property you own.Consult a tax professional to understand any tax liability that may result from enterin• the PPA. Utility and Electricity Usage'Savings Assumptions(0) You ®HAVE El HAVE NOT been provided with a savings estimate based on your PPA. Provider❑IS ®IS NOT guaranteeing these savings. Provider®IS El IS NOT using savings calculations that conform to the SEIA Solar Business Code.See Box Q or www.seia.orq/code. Your Estimate was calculated based on: ❑Your estimated prior electricity use ®Your actual prior electricity use ❑Your estimated future electricity use Your Estimate assumes the following: ❑Years of electrici •roduction from our PPA: DocuSign Envelope ID:AE3D3882-628B-41 B3-8146-AD890773E850 ►1 A current estimated utility electricity rate of$0.338[cost per kilowatt-hour]during the first year of the PPA with estimated utility rate increases of 2.9%annually.Provider based these estimates on the following source(s):Installer/Customer DAn electricity rate from your PPA of_[cost per kilowatt-hour]during the first year of the PPA with estimated increases of percent annually. NOTE:It is important to understand that future utility electricity rates are estimates only.Your actual current and future utility rates and utility rate increases may vary.Historical data are not necessarily representative of future results.For further information regarding rates,you may contact your local utility or the public regulation commission.Tax and other state and federal incentives are subject to change or termination by executive, le•islative or re•ulato action,which ma im•act savin•s estimates.Please read our PPA careful) for more details. Renewable Energy Certificates(RECs)(P) Any renewable energy certificates or credits(RECs)from producing renewable solar energy with the System ® WILL❑ WILL NOT be assigned to the Provider.If Provider is assigned the RECs,you will not own the RECs to sell,use or claim them,and Provider may sell the RECs to a third •a . Cooling Off Period/Right to Cancel(0) In addition to any rights you have under state or local law,you®HAVE 0 DO NOT HAVE the right to terminate the Contract without penalty no less than three business days from the date of this transaction by notifying Provider in writing at the above address.Consult your agreement for specific terms. SETA Solar Business Code(R) Provider®DOES❑DOES NOT abide by and agree to be bound by SEIA's Solar Business Code and its complaint resolution process. For more information about the SEIA Solar Business Code and complaint resolution process,please visit www.seia.org/consumers or email SEIA at consumer• seia.or•. Additional Disclosures or Terms(S) BY SIGNING BELOW,YOU AGREE THAT YOU HAVE RECEIVED AND REVIEWED DISCLOSURES A-S ABOVE: Homeowner's Narrfe ittS'-ilrelt?EERIALD Signature: J 1`N t°`�ft,o'1`/I W Date: August 30, 2022 I 15:00 MDT -08013F994A27648F... Co-Homeowner's Name(if any): Signature: Date: Individual Completing this Form: Name:John Santo Salvo Signature: Title: Authorized Signatory Company: Sunnova Energy Corporation Date: +, DocuSign�Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 sn n Ua Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement(PPA) Balanced Billing ELECTRONIC FUNDS TRANSFER OR CREDIT CARD PAYMENT AUTHORIZATION In this Electronic Funds Transfer or Credit Card Payment Authorization("Authorization"), "I,""me,""my,""we"and"our"refer to the Homeowner(s)under the Solar Service or Solar Purchase Agreement("Agreement") signed the same date I sign this Authorization. I may choose the convenience of having my monthly payments under the Agreement made automatically from my Bank Account at my Financial Institution or through recurring charges to my Credit Card Account. This Authorization allows preauthorized payments from my designated Bank Account or Credit Card Account("Account")to Sunnova Energy Corporation or its designees("You"). By signing this Authorization, I agree to the following terms: 1. AUTHORIZATION As applicable to the type of Account that I designate, I authorize You to: (i)automatically withdraw funds from my deposit Account("Electronic Funds Transfer Payment")through an automated clearing house transfer(electronic debiting of my Account)or by bank draft(remotely created check or"RCC"); or(ii) initiate charges to my credit Account, in order to make my payments to You as required by the Agreement. If the due date falls on a Saturday, Sunday, or holiday, my payment will be deducted on the next business day following the due date, and You will credit my payment as if it had been received on the due date. If I designate a deposit Account, I agree to keep sufficient available funds in the Account on the due date so that the payment can be made in the required amount and to cover all payment to You under the Agreement. If there are insufficient funds in my deposit Account, You may initiate a second debit to my Account or attempt a second presentment of a remotely created check. You will not attempt to debit my deposit Account or present a remotely created check drawn on my Account more than twice for any single payment due. If any of this information changes, I will immediately notify Sunnova at customerservice c( sunnova.com or by calling us at 1-855-277-6379. If Sunnova incurs any fees as a result of inaccurate or out of date information, Sunnova will bill me for those charges. 2. REJECTED PAYMENTS My failure to keep sufficient funds in my deposit Account or a rejected charge to my credit Account will be an event of default under this Authorization and You will have the right to terminate this Authorization. I will be responsible for any payments that do not clear as well as any dishonored check fees, including those that may be discovered after the Agreement is apparently paid off, paid in full or otherwise. 3. BANK FEES I agree to be bound by any rules my bank requires for pre-authorized electronic funds transfers and/or credit card transactions and understand that I will be responsible for any fees my financial institution may charge for these electronic payments. 4. EARLY PAYMENT If I make a full monthly payment two business days before the scheduled transfer date, there will be no automatic payment for that month. I agree that the termination of this Authorization shall not prevent a debit or credit transaction authorized before any notice of termination and does not terminate the Agreement or my obligation to make payments as required by the Agreement. 5. RIGHTS REGARDING VARYING AMOUNTS I acknowledge and understand that You reserve the right to change these conditions at any time. Notice may be provided on or with my bill or by other methods. I have the right to receive notice of all Electronic Funds Transfer Payments that vary from a preauthorized amount, or from the previous Electronic Funds Transfer Payment amount. 6. PROCEDURES UPON PAYMENT IN FULL I understand that when my Agreement is paid off and You send notice to my Bank to cease making Electronic Funds Transfer Payments or initiating charges to my credit Account, as applicable, occasionally a bank fails to stop such payments in a timely manner. If this occurs, or if an overpayment is otherwise made, You will refund to me the amount exceeding any amount due as soon as reasonably possible upon discovery of the overpayment, and I agree that this is a reasonable procedure. If there is a balance remaining after the scheduled final due date of the Agreement, I authorize You to continue to debit and/or initiate charges to my Account in the amount of the minimum payment required under the Agreement at regular intervals until the unpaid balance is paid.Although You are authorized to continue these payments, You are under no obligation to do so. 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900 www.sunnova.com Date:8/30/2022 ©2021 Sunnova Energy International, Inc.All Rights Reserved. 1 Contract ID:SG004996973 f F DocuSign Envelope ID:AE3D3882-628E-41 B3-8146-AD890773E850 sun" \Vtar" Sun nova Home Solar Service 1 Easy PlanTM Power Purchase Agreement(PPA) Balanced Billing BY SIGNING THIS DOCUMENT, I ACKNOWLEDGE THAT I HAVE READ THE TERMS AND CONDITIONS OF THIS AUTHORIZATION ABOVE AND AGREE TO BE BOUND BY ITS TERMS. I ACKNOWLEDGE THAT I HAVE RECEIVED A COPY OF THIS AUTHORIZATION. I REPRESENT THAT ALL PERSONS WHOSE SIGNATURES ARE REQUIRED TO WITHDRAW FUNDS FROM OR INITIATE CHARGES TO THE ACCOUNT I HAVE DESIGNATED HAVE EXECUTED OR OTHERWISE AUTHORIZED THIS AUTHORIZATION. I UNDERSTAND THAT I WILL RECEIVE A SEPARATE REQUEST TO SECURELY PROVIDE MY DESIGNATED BANK OR CREDIT CARD ACCOUNT INFORMATION. Homeowner' hag ,SdTIN�`�'JEgMEERALD Signature: 90 II N -�°`' N Date: August 30, 2022 1 15:00 MDT 080DF994A27648F... Co-Homeowner's Name(if any): Signature: Date: 20 East Greenway Plaza Ste 475,Houston,TX 77046 Date:8/30/2022 281.985.9900 www.sunnova.com Contract ID:SG004996973 ©2021 Sunnova Energy International,Inc.All Rights Reserved. 2