HomeMy WebLinkAboutAir tightness test 51922 '' RECEIVED
.PAN 0 5 223
Building Air-Tightness Test Form BUILDING DEPARTMENT
Customer Information: Building&Test Conditions:
Name: David Palmer
Address:
Date: 5/19/2022
City:
State/Zip:
Phone:
Time: 4:15 P.M.
Email:
Building Address: (if different from above)
Street: 33 Crest Circle Floor Area (ft2): 4500
City/State: West Yarmouth, MA
Comments: Permit#: 17-004997 Issued: 3/30/2017 Standard Level Accuracy
Mechanical Ventilation: ERV Unit Model VNT5150E1000
104 CFM = Minimum Continuous-Run Flow Rate in accordance with ASHRAE62.2(2013)
Test#1 Depress: V Press: Test#2 Depress: V Press:
Pre-test Baseline Pressure: -0.2 (Pa) Pre-test Baseline Pressure: -0.3 (Pa)
Bldg Press. Flow Ring Fan Press Flow Bldg Press. Flow Ring Fan Press Flow
(Pa) Installed (Pa) (cfm) (Pa) Installed (Pa) (cfm)
-50.8 A -51.0 1318 -50.0 A -50.3 1326
-50.7 A -50.9 1309 -50.6 A -50.9 1309
-50.5 A -50.7 1330_ -50.1 A -50.4 1311
-50.4 A -50.6 1321 -50.7 A -51.0 1318
-50.2 A -50.4 1311 -50.5 A -50.8 1319
Post-test Baseline Pressure: -0.5 (Pa) Post-test Baseline Pressure: -0.6
Fan Model/SN: Minn BD 130927 (Pa)
Fan Model/SN: Minn BD 130927
Results: Results:
CFM50: 1317.8 CFM50: 1316.6
ACH50: 1.75 1.75
ACH50:
HERS Rater Name and Cert.#: Chris Picarieflo Cert.#: 6397177
HERS Rater Signature and Date:P 5/20/2022
Developed by Advanced Building Analysis,LLC