HomeMy WebLinkAboutBld-22-002790 1 TOWN OF YARMOUTH Building Department BUILDING
Q (508) 398-2231 ext.1261
d4c PERMIT
0. !y PERMIT NO BLD-22-002790
` ' .**:�,«, JOB WEATHER CARD
t+.., ISSUE DATE 01/10/2022
: APPLICANT Renato Pereira PERMIT TO Alteration
AT(LOCATION) 59 ANASTASIA RD, WEST YARMOUTH, MA 02673 ZONING DISTRICT Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT 031.166 BUILDING IS TO BE: CONST TYPE V B USE GROUP R-3
REMARKS Alterations per approved plan 780 CMR MSBC, 9th Edition-Convert garage to CONTRACTOR
family room, add access to basement(508-360-7904) LICENSE
AREA(SO FT) 607,182,840. EST COST($) 10000.00 PERMIT FEE (S) 150.00
OWNER Renato Pereira
BUILDING DEPT BY
ADDRESS , 59 Anastasia Road
West Yarmouth MA 02673 PHONE 5083607904
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NO STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARn\/F
J
c
o J
0
N _
N
02-
c0
c)5, \
cil
eti g
C, V
Q v
s s
e'
o
O
P) 'LI'
b
p