Loading...
HomeMy WebLinkAboutRestoration Plan 3.28.2023GENERAL LAWRNCE ROADBVW50' BUFFERTO BVW50' BUFFERTO INLANDBANK100' BUFFERTO BVW100' BUFFERTO INLANDBANKEXISTINGMAPLESEXISTINGTUPELOWF 1WF 2WF 3WF 3WF 4WF 5WF 6WF 7WF 8WF 9WF 10WF 11WF 12WF 13WF 14WF 15RESTORATION PLANTING CALCULATORNVBS PLANTING AREA 4' O.C.1,430 S.F.INLAND BANK PLANTING AREA 4' O.C. 120 S.F.CONSERVATION WILDLIFE MIX SEE LISTTOTAL DISTURBANCE 1,550 S.F.MITIGATION PROVIDED 1,550 S.F.NATURALLYVEGETATEDBUFFER STRIP1,430 S.F.INLAND BANKPLANTINGAREA 120 S.F.1- AR1- BNSEED WITHNEW ENGLANDCONSERVATIONWILDLIFE MIXSEE NOTE 1ADD JUTEEROSIONCONTROLALONG SLOPESEE NOTE 2SEED WITHCOLONIAL SEEDHARMONY MIX1,400 S.F.SEE NOTE 3EXISTING SHRUBHONEYSUCKLE ANDBITTERSWEET TO BE REMOVEDSEE NOTE 415 - CA4 - AM3 - AM5 - CE5 - CE6 - HV6 - RI3 - RI3 - VC3 - VC3 - VC3 - VC3 - MP3 - MP3 - IG3 - IG3 - IG3 - VD5 - VL5 - VD4 - VL8 - RA38 NOBKSA ROADMASHPEE, MA 02649PHONE: 508-274-7718ELSCAPECOD.COMLOCUS MAPNOT TO SCALEPROPERTY OWNER:PROJECT LOCATION:16 GENERAL LAWRENCE ROADSOUTH YARMOUTH MA, 02664PREPARED BY:VEGETATION RESTORATION PLANNOREVISIONSBYELIZABETH SHEA16 GENERAL LAWRENCE ROADSOUTH YARMOUTH MA, 02664DRAWING TITLE:SHEET NO: 1 OF 1DATESCALE: 1:20DATE: 03/27/23DRAWN BY: TGCHECKED BY: TGNTHIS DRAWING IS A REVISION OF THESURVEYED SITE PLAN TITLED "CERTIFIEDPLOT PLAN " DATED 01/24/1977THIS PLAN IS ISSUED FOR PERMITTINGPURPOSES AND NOT INTENDED FORCONSTRUCTION DOCUMENTS.THIS DRAWING IS PROPERTY OFENVIRONMENTAL LANDSCAPESOLUTIONS LLC. ALL RIGHTS RESERVEDLOCUSRESTORATION PLANTING NOTESA TOTAL AREA OF 1,550 S.F. SHALL BE PLANTED ON SITE WITH SPECIFIED NATIVE SHRUBS. SEE "SHEA RESTORATION LIST" BELOW.NOTE 1: THE NEW ENGLAND CONSERVATION WILDLIFE MIX WILL BE SEEDED PRIOR TO RESTORATION PLANTINGS TO ESTABLISH THEUNDERSTORY PRIOR TO SHRUB PLANTINGS. THE SEED MIX WILL ALSO INCREASE THE EROSION CONTROL OF THE EXISTING EXPOSED SOILS.ELS WILL OVERSEED IN THE SPRING OF 2023, AND INSTALL TEMPORARY IRRIGATION TO GERMINATE.NOTE 2: JUTE MAT EROSION CONTROL FABRIC WILL BE INSTALLED POST SEEDING IN THE SPRING ALONG THE STEEPER PORTION OF THEPLANTING AREA. JUTE WILL BE REMOVED ONCE THE SEED AND MITIGATION PLANTINGS ARE ESTABLISHED.NOTE 3: THE LAWN AREA WILL BE OVERSEEDED WITH APPROXIMATED 1,400 S.F. OF COLONIAL SEEDS "HARMONY MIX' A MIX OF BOTHCOASTAL AND WAVY HAIRGRASS, AS WELL AS A MIX OF NATIVE FESCUE GRASSES, SEE "SHEA RESTORATION" LIST BELOW.NOTE 4: ONE EXISTING SHRUB HONEYSUCKLE AND EXISTING ORIENTAL BITTERSWEET WILL BE REMOVED BY HAND TO ENSURE THEESTABLISHMENT OF THE PROPOSED RESTORATION PLANTINGS. NO HERBICIDE TREATMENT IS PROPOSED.PROPOSED MITIGATION PLANTINGS TO BE 3 GALLON CONTAINERS FOR SHRUBS, PLANTED WITH ORGANIC COMPOST AND ORGANICFERTILIZER. ALL SIZES WILL BE LABELED ON PLANT LIST.ANY CHANGES IN PLANT SPECIES TO BE APPROVED BY CONSERVATION AGENT PRIOR TO PLANTINGS SHALL BE INSTALLED PRIOR TOCOMPLETION OF CONSTRUCTION ACTIVITIES.OWNER SHALL NOTIFY CONSERVATION AGENT FOR FINAL INSPECTION WITHIN 30 DAYS AFTER ALL PLANTINGS HAVE BEEN INSTALLED.CONSERVATION NOTESTHE LIMIT OF WORK (LOW) WAS ESTABLISHED PRIOR TO THE ENFORCEMENT ORDER WASISSUED TO THE HOMEOWNER IN EARLY 2023. THE LIMIT OF WORK WILL CONSIST OF A ROW OFCOIR LOG ALONG THE TOP OF THE LINK BANK AND WILL BE MAINTAINED THROUGHOUT THEPROJECT TIMELINE. UPON COMPLETION OF THE PROJECT THE COIR LOG WILL BE REMOVEDAND ANY DISTURBANCE DEBRIS WILL BE DISPOSED OF OFF SITE.PRIOR TO ANY WORK A WRITTEN NOTIFICATION WILL BE PROVIDED TO THE YARMOUTHCONSERVATION COMMISSION.NO EQUIPMENT, MATERIALS OR CONSTRUCTION DEBRIS WILL BE STORED OUTSIDE THE LIMIT OFWORK THROUGHOUT THE PROJECT TIMELINE.LEGENDPROPOSED NATURALLY VEGETATED BUFFER STRIP - 4' O.C.PROPOSED INLAND BANK PLANTING - 4' O.C.PROPOSED HARMONY MIX OVERSEEDING - 1,400 S.F.PROPOSED TREE MITIGATION - 2