Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. O Lot /7 Zone of Contribution: In Out_---'Acreage Commercial: Residential: Street: '3 Rc L T)L c c.c.> --- Village: Floor Plan: #Bedrooms: Owner: Installer: lid�,C 3 r'0 W KJ Address: Phone: Phone: Builder: Engineer: 0 . M ' ' ,j"... Address: Phone: Phone: N/A YES NO 1. Required#of copies received MK 2.Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ME --- 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: I _G� 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 1 12. System meets all other setback requirements Var.: \` 13. Uses adjustment for maximum high groundwater Var.: _ 6 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 6� 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred __18. System meets breakout requirements PVC liner: Wall: In 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal Li - 22. System adequately sized for its intended use 1 . 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate-meter for-duplexes- - �/ 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size C. 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking e/ 30. Buoyancy calculations forlank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,� 33.H-20 loading is subject to vehicular traffic,groundwater f/ 34.Title V Application and permit fee,installer signature / ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd .// 37. Check area lots for groundwater/Label groundwater in Assessor's Map 1 Plan reviewed by: a/Y-L _ _ c o:o: C\.5 .