HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. O Lot /7 Zone of Contribution: In Out_---'Acreage
Commercial: Residential:
Street: '3 Rc L T)L c c.c.> ---
Village: Floor Plan: #Bedrooms:
Owner: Installer: lid�,C 3 r'0 W KJ
Address: Phone:
Phone:
Builder: Engineer: 0 . M ' ' ,j"...
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
MK
2.Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ME ---
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: I _G�
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: \`
13. Uses adjustment for maximum high groundwater Var.: _ 6
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 6�
15. System not in top or subsoil (A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
__18. System meets breakout requirements PVC liner: Wall: In
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal Li -
22. System adequately sized for its intended use 1 .
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate-meter for-duplexes- - �/
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size C.
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking e/
30. Buoyancy calculations forlank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,�
33.H-20 loading is subject to vehicular traffic,groundwater f/
34.Title V Application and permit fee,installer signature / ✓
35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd .//
37. Check area lots for groundwater/Label groundwater in Assessor's Map 1
Plan reviewed by: a/Y-L _ _ c o:o:
C\.5 .