Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
13 Brewster Rd plan 12
1 S500 SECOND FLOOR CEILING FRAMING PLAN CONTRACTOR TO REFER TO ARCHITECTURAL PLANS PREPARED BY PETER MCDONALD ARCHITECT, DATED 01-16-2022, FOR "FORSTHUBER RESIDENCE", 13 BREWSTER, ROAD, WEST YARMOUTH, MA, FOR ALL ARCHITECTURAL INFORMATION, BUILDING DIMENSIONS, ELEVATIONS, SECTIONS, WALL LOCATIONS, WINDOW AND DOOR LOCATIONS AND TYPES, FINISHES, AND ALL INFORMATION NOT SHOWN. j 4 o - 1 1.011 UE 01, 1 uTC✓ JUL 14 2022 HEALTH DEPT. CONNECT 4 x 10 DOUG FIR TIE BEAM TO ROOF RAFTER EACH SIDE OF TIE BEAM WITH (3)-5/8" A307 GRADE 'A' HEX BOLTS WITH USS-STANDARD ASTM A153 GALV. FLAT WASHERS, EACH FACE., TYP. (TIE BEAM LOCATED IN LOWER THIRD) REFER TO DRAWING SHEET S600 FOR JACK/KING STUD QUANTITIES AND LOCATIONS "PERMIT SET 01-31-2022" BADERA ENGINEERING, L.L.C. P.O. BOX 251 So. ORLEANS, MA 02662 PH_(508)-776-6804 email: jasbadera@gmail.com as c o= JAMES A. BADERA, SIR. CIVIL � }y No.41715 F. TONAL 01-31-2022 THESE PROJECT DRAWINGS, INCLUDING THE NOTES AND DETAILS, ARE THE SOLE PROPERTY OF BADERA ENGINEERING, L.L.C. ANY USE WITHOUT PRIOR WRITTEN CONSENT IS STRICTLY PROHIBITED. © COPYRIGHT - BADERA ENGINEERING, L.L.C. T� i. 0 0 0 0zLij Q Q �r U U C� w Q Lij .. r p � s Q O� Lij Om w w C) o w <C = 1-- U) z 2;11 � F- U L. U) 6 � w w O ry w o O -� �o � m w CL 0 0 LjL Q CM r— PARCEL ID: MAP 29/BLOCK 141 No. REVISION/ISSUE DATE DRAWING SHEET NAME: SECOND FLOOR CEILING FRAMING PLAN PROJECT No. 2021-029 SHEET NO. S500 DATE: 11 /22/2021 5 OF: 9 SCALE: 1/4 #1 _ 1 1_011