Loading...
HomeMy WebLinkAboutBLD-21-001810 bUILDING 2 TOWN OF YARMOUTH Building Department CERTIFICATE OF (508) 398-2231 ext.1261 OCCUPANCY PERMIT NO BLD-21-001810 ADDRESS:497 Route 28. West Yarmouth, Ma 02673 ZONING DISTRICT Bldg. Type: Commercial SUBDIVISION MAP BLOCK 029.233 New Construction approved plan 780 CMR MSBC 9th Edition, TOY bylaws-Building 2 multifamily 20 units. CERTIFICATE OF INSP CTION DATE: / 21</2,7 BUILDING OFFICIA . g Griff Holding Corp 497 Main Street West Yarmouth, MA 02673 PHONE • THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. CERTIFICATE OF OCCUPANCY / BUILDING INSPECTIONS APPROVALS FIRE: i. Z Cl� DATE: /2-51/4 2- OTHER DATE: ELECTRICAL,/ BOARD OF HEALTH DATE: 15-6912-7' DATE: 3 (5-a oZ INSPECTOR• INSPECTOR: 8G,K1 letiV. PLUMBING/GAS FINAL BUILDING DATE: l // Z t DATE: ' INSPECTOR: �� Z INSPECTOR: COMMUNITY DEVELOPMENT: DATE NAME TOWN OF YARMOUTH Building Department CERTIFICATE OF (508) 398-2231 ext.1261 OCCUPANCY PERMIT NO BLD-21-001809 I 0 ' ADDRESS: 497 Route 28, West Yarmouth, MA 02673 ZONING DISTRICT Bldg. Type: Commercial SUBDIVISION MAP BLOCK LOT 031.36 New Construction per approved plan-780CMR MSBC 9th Edition, TOY bylaws-Building 2 multifamily 20 units. CERTIFICATE OF INSPECTION BUILDING OFFICIAL: Griff Holding Corp 497 Main Street West Yarmouth, MA 02673 PHONE CIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR RMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JRISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF JBLIC WORKS. CERTIFICATE OF OCCUPANCY BUILDING INSPECTIONS APPROVALS FIRE: L A ,)4 DATE: 3 /25j2 Z OTHER DATE: ELECTRICAL BOARD OF HEALTH DATE: DATE: INSPECTOR: INSPECTOR: 66--Pq PLUMBING/GAS FINAL BUILDING DATE: -' ;r' z/ Z 2- DATE: INSPECTOR: INSPECTOR: COMMUNITY DEVELOPMENT: DATE NAME Envelope Leakage Test Testing Company: Technician: Name: New Ecology, Inc. Name: Cody Wero Address: 15 Court Sq#420 Credentials: HERS, PHIUS+Verifier Boston, MA 02108 Email: wero@newecology.org Phone: 617 557 1700 newecology.org Building Information: Customer Information: Project ID: Yarmouth Gardens Name: Address: 497 Rt 28 Address: West Yarmouth, MA 02673 Geo-Tag Data: Latitude: 41.649579 Longitude: -70.237812 Timestamp: 2021-09-08 09:55:21 Measured Leakage: 5,350.3 CFM50 Leakage Target: 10,404.0 CFM50 Compliance with Leakage Target: Pass Test ID: Bldg 2-Whole bldg Purpose of Test: IECC 12/15 Env. Leakage Measured ACH50: 1.57 (+/- 1.7%) Effective Leakage Area: 311.4 in2 Building Volume: 204,020.0 ft3 Enclosure Surface Area: 0.0 ft2 Coefficient(C): 460.0 (+/- 13.7%) Exponent(n): 0.627 (+/-0.038) Correlation Coefficient: 0.99819 Test Standard: ASTM E779 (single mode) Test Mode: Depressurize Test Characteristics: Pre Indoor Temp: 70 °F Post Indoor Temp: 70 °F Pre Outdoor Temp: 37 °F Post Outdoor Temp: 40 °F Altitude: 20.0 ft Time Average Period: 10 seconds Test Date and Time: 2022-02-16 13:53:27 7000 6000 • Depressurize — 5000 1.1 4000 3000 g 2000 CO 1000 4 5 6 7 8 910 20 30 40 50 60 70 Building Pressure(Pa) Envelope Leakage Test Test Readings: Target (Pa) Bldg_(Pa) Adj Bldg_(Pa). Fan (Pa) Flow(cfm) Config Baseline -5.3 -60.0 -55.0 -50.7 -143.1 5,707.1 Open Fan -54.0 -55.4 -51.1 -143.4 5,713.7 Open Fan -48.0 -54.3 -50.1 -141.9 5,684.3 Open Fan -42.0 -47.9 -43.6 -117.7 5,188.5 Open Fan -36.0 -42.1 -37.8 -93.4 4,634.7 Open Fan -30.0 -38.5 -34.2 -81.0 4,323.6 Open Fan -24.0 -29.7 -25.4 -59.4 3,716.9 Open Fan -18.0 -23.7 -19.4 -41.7 3,127.8 Open Fan Baseline -3.2 Test Equipment: Flow Device: Model 3 110V Fan Pressure Gauge: DG1000 Serial#: 6495 Calibration Date: 2020-09-25 Deviations from Standard: • None Comments: None Report by TEC Auto Test 1.8.0 (210), ©2021 The Energy Conservatory, Inc. Page 2 of 2 !ftAIA' TN Document G704 - 2017 Certificate of Substantial Completion PROJECT:(name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION: Contract For: Certificate Number: Yarmouth Gardens General New Construction 2 of 2 497 Route 28-Building 1 40 Units Multifamily W.Yarmouth,MA 02673 Date:05/18/2017 Date:02/24/2022 OWNER:(name and address) ARCHITECT:(name and address) CONTRACTOR:(name and address) Commonwealth Community Developers Winslow Architects,Inc. Delphi Construction Inc. 1588 Cambridge St 89 Massachusetts Avenue 17 Cape Drive Cambridge,MA 02138 Arlington,MA 02474 Mashpee,MA 02649 The Work identified below has been reviewed and found,to the Architect's best knowledge,information,and belief.to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated below is the date established by this Certificate. (Identify the Work,or portion thereof,that is substantially complete.) All work. Winslow Architects,Inc. d John Winslow,President 02/24/2022 ARCHITECT(Firm Name IGNATURE PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION WARRANTIES The date of Substantial Completion of the Project or portion designated above is also the date of commencement of applicable warranties required by the Contract Documents.except as stated below: (ldentii5'warranties that do not commence on the date of Substantial Completion,if any,and indicate their date of commencement.) N/A WORK TO BE COMPLETED OR CORRECTED A list of items to be completed or corrected is attached hereto,or transmitted as agreed upon by the parties.and identified as follows: (Identify the list of Work to be completed or corrected.) Refer to"220224_Bldg.2 Unit Back Punch List-WAI Update","Bldg 2 corridor-YG_WAI Update",and"220210-Exterior Punch List DCI_WAI Update" The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment,whichever occurs first.The Contractor will complete or correct the Work on the list of items attached hereto within Zero(0)days from the above date of Substantial Completion. Cost estimate of Work to be completed or corrected: $49,800.00 The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,and other items identified below shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should review insurance requirements and coverage.) The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion: Delphi Construction Inc. CONTRACTOR(Firm SIGNATURE PRINTED NAME AND TITLE DATE Name) Commonwealth Community Developers OWNER(Firm Name) SIGNATURE PRINTED NAME AND TITLE DATE AIA Document G704TM—2017.Copyright C 1963,1978,1992,2000 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA' Document is protected by U.S.Copyright Law and international Treaties.Unauthorized reproduction or distribution of this ALAI Document,or any portion of it,may result in severe civil and criminal penalties and will be prosecuted to the maximum extent possible under the law,This document was produced by AIA software at 15:12:58 ET on 09/30/2019 under Order No.4877166947 which expires on 09/29/2020,and is not for resale. User Notes: (3B9ADA6D) Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Residence at Yarmouth Gardens Date:November 5,2021, Permit No.21-001809&21-001810 Property Address:497 Route 28,West Yarmouth,MA Project: Check(x)one or both as applicable: X New construction Existing Construction Project description:2 Wood framed(type V construction)multi-family(R-2)buildings,20 residential dwellings each(40 total). I Marshall H.Puffer,MA Registration Number:53772,Expiration date:6/30/2022,am a registered design professional,and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its res.onsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or ��t�OF,pgS y , 41 electronic signature and seal: st MARSHALL 2 PUFFER irik v CIVIL " /fiAr No. 53772 Phone number:508-255-6511 Email:mpuffer@coastalengineeringcompany.com Building Official Use Only Building Official Name: Permit No.: Date: Final Construction Control Document 4.„ t To be submitted at completion of construction by a . ` � Registered Design Professional F for work per the ninth edition of the__ Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Date: 02/24/22 Permit No. 21-001810 Yarmouth Gardens Building 2 Property Address: 497 Route 28,W.Yarmouth MA 02673 Project: Check(x) one or both as applicable: New construction Existing Construction Project description: John MA Registration Number: 6023 Expiration date: o8/31/22,am a registered designprofessional,and I have I winnow g� P� S P f prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet" or ,r''sER` °;c;,t electronic signature and seal: J � tEJR ::: °Y` ■ � PJ�6�3 �� CASAT BGE. s/ Phone number: 781-648-6600 Email: john@winslowarchitects.com Building Official Use Only j Building Official Name: Permit No.: Date: Version 01 O1 2018 • Final Construction Control Document ( To be submitted at completion of construction by a s ( ft Registered Design Professional 6 for work per the ninth edition of the • 1 Massachusetts State Building Code, 780 CMR,Section 107 . Project Title: Yarmouth Gardens Bldg. 2 Date: 01/26/2022 Permit No. BLD-21-00i_809 Property Address: 497 Route 28 Bldg.2, West Yarmouth, MA 02673 Project: Check(x)one or both as applicable: [X] New Construction [ ] Existing Construction Project description: Two new construction wood-framed two-story multifamily buildings each with 20 units. Bldg. 2 contains an elevator, management offices. and a community room. The site includes 60 parking spaces, a playground, dumpster enclosure,bike parking.and a bus shelter. I, Zbigniew M. Wozny, MA Registration Number: 34029 Expiration date: June 30, 2022, am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ I Architectural [ I Structural ( X I Mechanical [ I Fire Protection ( I Electrical [ X I Other: Plumbing for the above-named project. I,or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: CHdFtitgS��, S Phone number: 781-826-4144 O Z$I)NIEW �G Email: zwozny@wbaengineers.com Z. t,,t Lcrt P O WOZNY U MECHANICAL fn No 34029 \ 11 `' • L A,. FIDAA E.BARBAR ti ,.. (1., , ` t, NCTARYFUBLIC 1� l7?r GGM,414.....4 TH OF MASSACMiSErt$ ,•1' My Came Expires Oct 11,2024 Building Official Use Only Building Official Name: Permit No.: Date: 1 I7147 Yarmouth Gardens'A(lidos HtsBUILDING 2 Final Affidavits 03-01-2022'MECH•PLUMBINGdocx Final Construction Control Document ') To be submitted at completion of construction by a Registered Design Professional • for work per the ninth edition of the Massachusetts State Building Code, 780 CMR,Section 107 Project Title: Yarmouth Gardens Bldg. 2 Date: 03/01/2022 Permit No. BLD-21-001809 Property Address: 497 Route 28 Bldg.2, West Yarmouth, MA 02673 Project: Check(x)one or both as applicable: [Xj New Construction [ j Existing Construction Project description: Two new construction wood-framed two-story multifamily buildings each with 20 units. Bldg. 2 contains an elevator, management offices, and a community room. The site includes 60 parking spaces_ a playground, dumpster enclosure, bike parking.and a bus shelter. 1, Steven P.Januskis ,MA Registration Number: 40629 Expiration date: June 30, 2022 , am a registered design Professional and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ I Architectural ( ] Structural I I Mechanical [ ] Fire Protection (X] Electrical IXI Other: Fire Alarm for the above-named project. 1,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that 1 or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: Phone number: 781-826-4144 Email: sjanuskis@wbaengineers.com OF*, O�� s ito JANUSitts ELE � � 40629 eaG4i �� 9`./STERt9 <,* 1!rtliYl/i iirii .S • s'ON FIDAA E.BAIIBAR ... \';7• CJIAMONY'fAtTH OF 14A$$AONUSEt1J • . MyCorrmExpres Oct 11,2024 N. Building Official Use Only Building Official Name: Permit No.: Date: J:\17147 Yarmouth Gardens\Affidavits\BUILDING 2 Final Affidavits O3-01-2O22\ELECTRIC.docx Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR,Section 107 .41 N. Project Title: Yarmouth Gardens Bldg.2 Date: 03/01/2022 Permit No. BLD-2 1-00 1 809 Property Address: 497 Route 28 Bldg. 2, West Yarmouth, MA 02673 Project: Check(x)one or both as applicable: [X] New Construction [ ) Existing Construction Project description: Two new construction wood-framed two-story multifamily buildings each with 20 units. Bldg. 2 contains an elevator, management offices, and a community room. The site includes 60 parking spaces, a playground, dumpster enclosure,bike parking,and a bus shelter. I, Grzegorz B.Wozny,MA Registration Number: 39170 Expiration date:June 30,2022,am a registered design professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ I Architectural I Structural ( [ Mechanical (XI Fire Protection { [ Electrical { [ Other: Describe for the above-named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that 1 or my designee: 1. Have reviewed, for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: .0N OF MAgsgcy Phone number: 781-826-4144 p= GRZEGORZ �tn Email: gwozny@wbacngineers.com WpZtsY tail v FIRE PROTECTION No.39170 ' Gt . , SStpNA.1. .. / J k ` FIDAA E. BARBAR ti 5 NOTARY PUBLIC ti "�.• 1M1PM ALTHOFAtAssAcmusEii$ `� • MY Cc m Ewes 00.1 t,2024 Building Official Use Only Building Official Name: Permit No.: Date: 1 17147 Yarmouth Gardens'Aflidavtts.BUILDING 2 Final Affidavits 03-01.2022 FIRE_PROTECTION doe. 44-: TOWN OF YARMOUTH BUILDING DEPARTMENT 4+/- ° °�° Certificate of Occupancy MATTACHEE9E PS ",4 ri F y ' ,gym In accordance with The Commonwealth of Massachusetts Building Code Permit No. NvJ - - 1 W) Location Type of Building S /> Has been inspected and occupancy is approved. Date Building Commissioner ,!`�/ This certificate must be posted in a conspicuous place. 4' °F 'q �, TOWN OF YARMOUTH BUILDING DEPARTMENT °� ° Certificate of Occupancy .11 4.1.41111 MTACHEEBE 3 ;� _ r AT 'W4%Mir In accordance with The Commonwealth of Massachusetts Building Code Permit Nor7/ /7/ ? Location W.7 / a`r ��✓' ,y��;,�,d,:1' Type of Building - • Has been inspected and occupancy is approved. Date /0 ? /Z ,�--- Building Commissioner This certificate must be posted in a conspicuous place. • • • • • °F �r4�=_ TOWN OF YARMOUTH BUILDING DEPARTMENT ?�. Certificate of Occupancy MATTACNEESE OACIA1[9 r� In accordance with The Commonwealth of Massachusetts Building Code Permit No,n1 j. ,,N - 0 \� JLocation kk-) ' Type of Building Has been inspected and occupancy is approved. Date IA,- 10-- Bui ding Commissioner This certificate must be posted in a conspicuous place. '.ur \vr y � v� <<3 ;;'(1'_. OF r44-% TOWN OF YARMOUTH BUILDING DEPAF IL °ca Certificate of Occupancy ,;1aV; is MATTACNEESE a "b9A1(9 In accordance with The Commonwealth of Massachusetts Buil, Permit No. \\ - \^ Location U c ) 9c‘. �5 Type of Building Has been inspected and occupancy is approved. Date Building Commissioner - This certificate must be posted in a conspicuous place. C)(?\t Pic 4:\ r ay - ��c�.;^� (- c `�t,�°•c •