Loading...
HomeMy WebLinkAbout50 Park Ave plan 9F2 BLOCKING PANEL, EXTERIOR Vertical load transfer = 2000 plf max. Wood I Beam blocking panel ° ° 0 ° 8d nails at To.c. F4 SQUASH BLOCKS & SINGLE RIM JOIST Vertical load transfer = 2000 plf max. along load bearing wall based on bearing stress of 390 psi. 23132" 48424 APA rated sheathing Squash blocks (2x4 minimum) T-1116" 8d nails See detail F7 for blocking requirements. C14 STRINGER TO JOIST CONNECTION Double Wood I Beam construction per detail F11(ful filler). Backer blocking size and installation per detail F13. Hangers USP (Kant —Sag ) MSH218 Minimum 12-10d nails hIy@ cement GR ordouble josts. Minimum Simpson Strong —Tie THA218 4.10d x 111? nails into stringer. For stringer, iongerthan 14' or sfdngeu regions exceeding 709, call GP. 1: F1 ATTACHMENT AT END BEARING One 10d box or sinker nail each side at bearing, typical for all wood bearings. -----1314" minimum bearing length at all floor and roof details To avoid splitting flange, start nails at least 1112" from end. Drive nails at an angle to prevent splitting of bearing plate. 1: Fl BLOCKING PAN Blodang panels installed fora minimum of 4' at each building caner and at lost 4' every 25 of wall length. Use 8d nails at 8" o.c. ELS USED FOR BRACING Single layer 2N32" 404 APA rated sheathing (plywood or OSB) rim provides 1000 pitverbl bad I rmsfer (two layers = 20M plf). Allowed only with jest depths up to 1171F unless used with 2x4 min. squash blocks as shown in detail F4. CF1 JOIST BEVEL -CUT JOIST TYPICAL DETAIL I I I DO NOT BEVE_— -_ JOIST BEYOND INSIDE FACE OF 'NALL TO BEAM CONNECTION hangers WI 40 9112" 2x6 + 518" plywoodlOSB 2x6 + 5/8" plywc(dM WI 60 9112' GPI 11718' 2x6 + 518' ptywodOSB 2x6 + 58' plywoodlOSB 2x6 + 518' plywoodlOSB h8 + 58' *woodOSB 1) Support back of web during nailing to prevent damage to web -flange connection. 2) Leave 118" gap between top of filler blocking and bottom of top flange. 3) 4) Place joists together and nail from each side with 2 rows of 10d nails at 12" o.c., clinched when possible. Stagger rows from opposite sides by F. �Iulam Beam Filler blocking 118' gap — COLUMN LOAD TRANSFERE TYPICAL DETAIL CUT SOLID BLOCKS WOOD POST 1/16" HIGHER THAN JOIST HEIGHT FOR SOLID BEARING BLOCK ALL POSTS FROM WOOD ABOVE I —JOIST TO BEARING BELOW SILL PLATE F11 DOUBLE JOIST CONSTRUCTION (Not required 9 both loaded equally from above) �OF18 BEARING STIFFENERS Tight fit Gap (W +) _ Clinch nails when possible Stiffener (plywood, OSB, 2A) each side at: - Hangers with side nailing. Hangers with sides not containing top flange of joist. Birdsmouth cuts. STIFFENER SIZE NAILS 40 &60 112"+ 112' 3-10d mum width 2 5116" CANTILEVER DETAIL BEARING WALL WOOD I —JOIST BLOCKING NAILED WOOD TO TOP PLATE WITH I —JOIST, TYP. 8d NAILS AT 6" O.C. WEB _ 3/4„ STIFFENERS, PLYWOOD TYP. EACH SIDE OR OSB WHERE CLOSURE REQUIRED PANEL BEARING WALL C§ FLOOR OPENING, FACE MOUNT HANGERS Backer block: Before installing a backer to a double joist, drive an additional3-10d nails into the web where the backer will fit, clinched when possible. Install backer tight to top flange. Use 10.10d nails, clinched when possible. Backer blocks' Joist Material Depth WI & GPI 40 & 60 g 112",117/8' 112' + 112" plywoodfOSB 6114', 8 518' *Block must be long enough to permit required nailing without splitting. TYP. (SEE MANUFACTURER'S D ETAI LS) Assemble double joist per detail F11. (Ul-depth filler) ° o Bearing stiffeners are required at hangers. (See detail F18) ° ° / / Backer blocks both sides of web,