Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM LOT /->2_ Date of Subdivision Approval Street 7 - &fa %'aJi f Zone of Contribution: In Out Village a71 (-- /Y Y Commercial Residential Owner: ilk/ ",a.Z)4(7)/(--6% Installer -n` Builder: Engineer :1T4J-(.4 ,("6- N/A YES 10 1. Required number of copies received. �� 2. Date of soils exam and percolation test not older than 2 years. I 3. 4 feet of naturally occurring pervious material, above water table(new construction) I, '� 4. Foundation 2 feet above high point of fronting road for new construction. t./ 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands, L/ 11. Leaching a minimum of 150 feet from drinking we13s/25 feet from irrigation wells, 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. I, 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. �/ 15. System not in top or subsoil or 5 foot removal. C__.-- 16. Proposed contours are suitable. 17. System meets slope requirements - ruin.. 1/8".. 1/4" preferred, 18. System meets irreak•ut requirements- peastone elevation carried out 15 feet minimum. l./ 19. Specified tee sizes are proper, gas baffle on outlet tee `-% 20. Sewage flow under 10.000 gpd for parcel. 21. No garbage disposal. t/ 22. System adequately sized for its intended use, 1.,/ 23. Minimum 6" stone or mechanically compacted below the tank and d-box. L/ 24. Manhole covers within 6" of grade - septic tank and pump chamber. l../ 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole. check valve, sanitary in d-box. alarm on_separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking, 29. Engineer to inspect and certify : A, clay removal __.---- b. wall construction schedule c: commercial system �...--- 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic, c_f 32. Title V application and fee signed by a licensed installer, 33. Foundation footing 2 feet above adjusted water table. c--...-. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: � 1 Y Y R