Loading...
HomeMy WebLinkAbout95 Wilfin Rd plan 5FLOOR JOIST (PER PLAN) IN SILL PLATE (PER GSN) a a No. 4 REBAR AT 24" O.C. (HORIZONTAL) fc - 3000 PSI Fy - 60 ksi No. 5 REBAR AT 481, O.C. (VERTICAL) a ALTERNATE LEGS IN FOOTING. 3.0" COVER a n (3) No. 5 REBAR CONT. 3" FROM BOTTOM OF FIG, FOUNDATION WALL FLOOR JOIST (PER PLAN) j\� " a SILL PLATE \//\\ AT 48 OORC OLT $ (PER GSN) a 4 No. 4 REBAR AT 24" O.C. a. (HORIZONTAL) fc = 3400 PSI Fy - 60 ksi No. 5 REBAR AT 48" (LC. G (VERTICAL) ALTERNATE LEGS IN FOOTING. 3.0" COVER a d a n n a a (3) No. 5 REBAR CONT.-/ 3" FROM BOTTOM OF FTG. 21 FOUNDATION WALL FOOTING SCHEDULE FOOTING ID FOOTING COMMENTS FTG-1 20" x 10" THICK CONCRETE f'c=3000 PSI (3) No. 5 REBAR (CONT.), 3" FROM BOTTOM OF FTG. COLUMN SCHEDULE COLUMN ID COLUMN -- P1 5.25" x 5.25" PARALLAM COLUMN P2 3.5" x 5.25" PARALLAM COLUMN P3 3.5" x 5.25" PARALLAM COLUMN HEADER SCHEDULE HEADERID HEADER H 1 (2) 1 Y4" x H2 (3) 2 x 10 SPF. No. 2 WITH (2) PIECES OF 2" PLYWOOD H3 (3) 2 x 10 SPF. No. 2 WITH (2) PIECES OF 4" PLYWOOD H4 (3) 2 x 6 SPF. No. 2 WITH (2) PIECES OF %" PLYWOOD H5 (2) 1 4" x 7 4" LVL BUILT-UP CORNER STUDS (PER DETAIL. I ) HDU HOLDOWN II THREADED ROD MODEL NO. "A. MIN. EMBED. MITI. REBAR LENGTH SSTB16 5/8 12 %" 50" SSTB20 5/8 16 %- 58" SSTB24 5/8 20 %" 66" SSTB28 7/8 24 %" 74' SSTB34 7/8 28 %" 82" SB100 1 24" 66" *NOTE: #t4 REBAR TO BE CENTERED ON HOLDOWN AND LOCATED 3" TO 5" DOWN FROM TOP OF FOUNDATION WALL PER SHVIPSON MANUFACTURER'S SPECIFICATIONS. T 4��) R4 REBAR{ SSTB HOLDOWN ANCHOR SS J ON TOP OR 3" TO 5" BAP 4 DIAGONAL IN CORNER SILL PLATE. NW COUPLER 41 z APPLICATION) ANCHOR BOLT d a (PER GSN) SSTB HOLDOWN ANCHOR- EDGE S' FOR 2X4 WALL 7 MIN REBAR 2.75" FOR 2X6 WALL HOLD DOWN AT 5„ MIN. VIEW �Dl EXTERIOR BUILDING CORNER ROOF SHEATHING EDGE NAILING (6" ox) 2X BLOCKING BETWEEN RAFTERS (NOTCH FOR VENTILATION IF REQUIRE REFER TO ARCHITECIUR. PLANS FOR MORE INFO.) ROOF RAFTER PER PLAN. (REFER) TO ARCHITECTURAL PLANS FOR RAFTER DIMENSIONS AND EAVE DETAILING) - H2.5A (INSTALL PRIOR T( BLOCKING AND PLYWOC DOUBLE 2X TOP PLATE SHEATHING) ALTERNATE H?e BEAM (IF SHOWN ON PLAN) A35 (INST. FACE OF BLOCKING TO TOP PLATES OF WALL AT pi RAFTER TO TOP PLATE BEAVE Y OTHER RAFTER BEAM SCHEDULE HEADERID HEADER R1 B1 (3) 1 %4" x 16" LVL - CONNECT PILES TOGETHER WITH (3) 5" TRUS LOK EWP SCREWS PER 16" O.C. (3) 1 Y4" x 7 Y4" LVL B2 (2) 1 err x 7 4" LVL 1 SHEARWALL HOLDDOWN SCHEDULE: I FOUNDATION HOLDDOWNS: ®HDU8-SDS2.5 W/ SSTB28 %" DIAMETER ANCHOR BOLT W/ CNW% COUPLER NUT BETWEEN SSTB 28 AND 7/ THREADED ROD INTO HOLDOWN. POSITION SSTB28 W/ ANCHORMATE AND ABS TO FORMWORK PRIOR TO CONCRETE POUR FOR CORRECT PLACEMENT. SHEARWALL SCHEDULE: WALL TYPE SCHEDULE: -- 3 )OF RAFTER ,R PLAN )GE NAILING 2X TOP PLATE A732. F'LYWUOD - (EDGES BLOCKED) 8d COMMON OR GALVANIZED BOX NAILS @ 6"O.C. EDGES AND 12" O.C. FIELD. 15/32" PLYWOOD - (EDGES BLOCKED) 2 8d COMMON OR GALVANIZED BOX NAILS(" 3" O.C. EDGES ,AND 12" O.C. FIELD. NOTE: FOR PLYWOOD SHEARWALL TYPES 1, 2, AND 3 LISTED ABOVE, 8d COMMON OR GALVANIZED BOX NAILS = (0.131 x 2 Y2"). GUN NAILS MATCHING THE NAIL DIAMETER AND LENGTH MAYBE USED AS A SUBSTITUTE. CONNECTION TO CONCRETE FOUNDATION SILL PLATE CONNECTION TO CONCRETE 5a" DNA. ANCHOR BOLTS AT 48" O.C. (MAX.) NOTE: ANCHOR BOLTS REFERENCED ABOVE TO BE %" DIAMETER A307 STEEL ANCHOR BOLTS WITH 3" x 3" x Y4" PLATE WASHERS WITH 7" MINIMUM EMBEDMENT INTO CONCRETE. SHEARWALL CONSTRUCTION: 1. ALL SHEARWALLS TO HAVE DOUBLE TOP PLATES AND DOUBLE 2X STUDS AT EACH END OF 'N.ALL, I,UNLESS NOTED OTHERWISE) 2. FACE NAIL DOUBLE TOP PLATES W/ 16d NAILS AT 16" O.C. USE (10) - 16d NAILS AT EACH '.SIDE OF LAP SPLICES IN TOP PLATES, 3. NAILING FOR PERFORATED SHEARWALLS TO BE CONTINUED ABOVE AND BELOW ALL CIPEN!'NGS IN SHEARWALL. 4. ATTACH DOUBLE 2X 'STUDS A.NID, BUILT-UP CORNER STUDS AT SHEARWALL ENDS WITH (2) 10d (0.148 x 3") NAILS AT 6" O.C. FOR SECOND FLOOR SHEARWALLS AND (2) 10d (0.148 x 3") NAILS AT 4" O.C. STAGGERED FOR FIRST FLOOR SHEARWALLS. 5. REFER TO HOLDDOWN SCHEDULE FOR TIE DOWNS AT SHEARWALL ENDS. THESE PROJECT DRAWINGS, INCLUDING THE NOTES AND DETAILS, ARE THE SOLE PROPERTY OF BADERA PROJECT NAME: ENGINEERING, L.L.C. ANY USE WITHOUT PRIOR WRITTEN CONSENT IS STRICTLY PROHIBITED. THE B A R RY RESIDENCE ADDRESS: O COPYRIGHT - BADERA ENGINEERING, L.L.C. 95 WILFIN ROAD, YARMOUTH, MA MA,P-BLOCK NUMBER: 034.3 I REVISION,/ISSUE I DA_= LS90 CLIP NEW 2x1O TO RIDGE (TYP AT ALL NEW RA ROOF SHEATHING (7) - HOD NAILS AT EACH END I LSTAI8STRAP AT 16" O.C. — 2 x 4 VERTICAL EACH SIDE OF RIDGE 2x6 STRAP AT RIDGE BOARD AND NEW RIDGE BEAM LSTA18 STRAP AT 16" O.C. ROOF SHEATHING (7) - IOD NAILS AT EACH END `— SEE ALTERNATE ROOF RAFTER PER PLAN ALTERNATE: ATTACH OPPOSING RAFTERS BELOW RIDGE BEAM OR RIDGE BOARD WITH 2 x 8 COLLAR TIE AS SHOWN. RIDGE STRAPS NOT REQUIRED WHEN USING A COLLAR TIE. 18 STRAP AT RIDGE BOARD sDI OR STRUCTURAL RIDGE BEAM 2x6 WALL BUILT-UP POST 4" O.C. HOJPLAN) + (PE + PLAN VIEW ELEVATION VIEW NOTES: 1. ATTACH STUDS AT BUILT-UP CORNER TOGETHER WITH (2) ROWS OF IOd (0.148"x 3.0") NAILS AT 4" O.C. STAGGERED FOR 1ST STORY SHEARWALLS. 1 BUILT-UP CORNER AT KwEA END OF SHEARWALL RIDGE STRAP RIDGE (PER PLAN) (PER DET. 14/SDI) (EACH RAFTER) 0 TIMBERLOK WOOD SCREW 2 x Io THRU VALLEY PLATE RAFTER (TYP.) (3) - INTO RAFTER (BELOW) 2 x 12 FLAT VALLEY PLATE (TYP.) EDGE NAIL ROOF SHEATHING TO VALLEY PLATE AT 4" O.C. 17 2 x 10 ROOF OVERFRAMING 9DI 4 AT VALLEY RIDGE BEAM PARALLAM (PER PLAN) POST (PER PLAN) ST2215 NAIL EXTERIOR WALL SHEATHING TO POST WITH (2) ROWS OF 10d x 2 Z" NAH S AT 6" O.C. ST2215 ST2215 HEADER (PER PLAN) IF OCCURS l LVL RIDGE BEAM IDi AT PARALLAM SUPPORT POST CONSTRUCTION SET 09-16-2022 BADERA ENGINEERING, L.L.C. P.O. BOX 251 So. ORLEANS, MA 02662 PH: (508)-776-6804 email: jasbadera@gmalLoom JAMES A. ADERA, JR. U� CIVIL cn No. 41715 NOTE: CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY CONSTRUCTION AND OR SHORING AS REQUIRED TO SUPPORT EXISTING STRUCTURE DURING INSTALLATION OF NEW CONSTRUCTION AS OUTLINED HEREIN. DRAWING SHEET NAME: CONSTRUCTION NOTES AND DETAILS PROJECT No, 2022-011 DATE: 09/09/2022 SCALE: Y4 11 = 1 1-011 SHEET NO. S 400 09-16-2022 5 OF: 6