Loading...
HomeMy WebLinkAbout8 Fenway plan 2/n\ T� �nrn � env c+i+nruic� ENTRY SECTION #2 SCALE 4„=1,.-0 TYPICAL SEE L.R. SECTION 22' BEAN LOAD LL=1462# TL=5220 6x6 SYP POST DIRECT BEARING CUT STUDS INSTALL NEW (2) 1 3/4x 7 J" LVL CUT (2) FULL LENGTH STUDS MIN BEARING (2)2x. ENTEND HEADER TO INSTALL (2) IF REQUIRED. OPPOSITE END (1) 2x EXISTING OPENING FRAMING NOTE THIS WALL 1 HOUR W/ 8" TYPE X FIRECODE. KITCHEN SECTION #3 L.R. FIREPLACE FRAME SCALE 4" " =1'-0 SCALE 4"-1'-0" SECTION 2'-0" WIDER WITH FULL FOUNDATION. SEE SECTION #2 NOTES ROOF MAX LOAD: LL=4239 TL=6943 DECK 14' ((2)7'BAYS) LL=1820 TL=2888 LL=1820 TL=2888 TOTALS LL=7234 TL=11131 2.25x2.25 FT ® 2500# NEW FOOTING: NEW LVL/ EXISTING GIRT ALIGN 1) BEFORE ROOF REWORK SHORE SIDE OF NEW FOOTING & REMOVE COLUMN 2) VERIFY THICKNESS OF EXISTING ASSUME 4". NEW FOOTING DEPTH SLAB THICKNESS 3) NEW 2'6"x2'-6"x 9" (SEE #2) f OVER EXISTING SLAB CENTERED ON 4) DOWEL NEW FOOTING TO SLAB J x 8" DOWELS DRILL 3" (SLAB -1 IN EPDXY. 5) IF NEW LVL ALIGN CUT AND REI EXISTING LALLY. USE NEW TOP PLf 8x" x�' & + TYP CAP PLATE. DRII 8" x 8 x J" BASE + TYP CAP PLE (4) X" BOLTS 6) IF NEW OFFSET =<1'-0" INSTAL LALLY DIRECTLY BELOW NEW LVL S PLATES. INSTALL OLD LALLY CUT 1 LOAD TRANSFER: 1) 6x6 SYP OR FIR POST TO FROM LVL TO STAIR FLOOR DOUBLE. 2) BLOCK THRU FLOOR TO GIRT W/ STUB SYP POST. USE ABU66 BETWEEN PIECES. USE 14"xX' BEAF PLATE ON GIRT. CONNECT "STUB" GIRT W/ SIDE GUSSET PLATE 3) POST SHOULD ALIGN f6 W/ EX LALLY OR SEE ABOVE