HomeMy WebLinkAbout785 Route 28 Unit 2 trench planGENERAL NOTES: A. CONTRACTOR SHALL NOTIFY "DIG -SAFE" AS REQUIRED PRIOR TO THE START OF ANY EXCAVATION WORK. CONTRACTOR IS RESPONSIBLE FOR PROTECTING UTILITIES WITHIN THE WORK AREA DURING CONSTRUCTION. B. CONTRACTOR TO VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXISTING BUILDING SEWER, AND REPORT AND DISCREPANCIES TO THE DESIGN ENGINEER PRIOR TO THE SETTING OF ANY SEWAGE DISPOSAL SYSTEM COMPONENTS. C. CONTRACTOR SHALL DETERMINE THE LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATION. D. ALL CONSTRUCTION SHALL CONFORM TO THE STATE SANITARY REGULATIONS (310 CMR 15.00) AND ALL OTHER APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS. E. PROPERTY IS LOCATED WITHIN FLOOD ZONE AE EL=11 PER FEMA MAP PANEL 25001C0589J. SEWAGE DISPOSAL SYSTEM NOTES: 1. H-20 RATED COMPONENTS SHALL BE REQUIRED IN ANY AREAS SUBJECT TO VEHICULAR LOADING AND AS REQUIRED ON THE PLAN. 2. THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN. ANY CHANGES OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING. 3. ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA, SCH 40 PVC SHALL BE 0.01 FT/FT. 4. SOIL ABSORPTION SYSTEMS MUST BE VENTED WHEN DISTRIBUTION LINES EXCEED 50 FEET IN LENGTH, WHEN LOCATED IN AREAS SUBJECT TO VEHICULAR LOADING, AND WHEN PRESSURE DOSED. Existing Septic Components - UNIT #2 WORK AREA PLAN (See Nate#6) SCALE: 1" = 10' SAW CUT EXISTING PARKING LOT (SEE NOTE #13) �"o� \�e Guth Jea PoCk��9 \ BENCHMARK G�o� ego\1� Pa CL/CL CATCH BASIN RI ° EL = 8.2± (NAVD88) / \ PROPOSED TIMBER -� / WALL l g TP 1 . � \ � PROPOSED SEPTIC TANK/PUMP CHAMBER .yy Existing Septic 12 6 Components -UNIT f (See Note#7) 5. FINISHED GRADE SHALL BE A MAXIMUM OF 36" AND A MINIMUM OF 9" OVER THE TOP OF ALL SAW CUT EXISTING SIDEWALK - SYSTEM COMPONENTS. (SEE NOTE #12) 6. ALL SEPTIC SYSTEM COMPONENTS, FOR UNIT #2, SHALL BE PUMPED DRY REMOVED, AND AREA FILLED IN WITH CLEAN SAND. 7. CONTRACTOR SHALL PROTECT ALL EXISTING SEPTIC COMPONENTS FOR UNIT #1. CONTRACTOR SHALL EXPOSE THE EXISTING LINE FROM THE SEPTIC TANK TO LEACH PIT, PRIOR TO THE INSTALLATION OF ANY NEW SEPTIC COMPONENTS, TO CONFIRM THERE ARE NO CONFLICTS WITH THE NEWLY PROPOSED SEPTIC INSTALLATION. IF THE EXISTING LINE IS IN CONFLICT WITH THE PROPOSED SEPTIC DESIGN THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND LINE WILL BE RELOCATED AS NEEDED. EXISTING HEDGE AND TREE 8. COMPONENTS TO BE PROVIDE WITH WATERTIGHT ACCESS COVERS RAISED TO WITHIN 6" OF TO BE REMOVED GRADE WHERE REQUIRED. 9. PRIOR TO FINAL INSPECTION BY THE ENGINEER AND THE BOARD OF HEALTH ALL SYSTEM COMPONENTS MUST BE INSTALLED INCLUDING ALL ACCESS COVERS WITH RISERS. 10. SOIL REMOVAL: ALL FILL AND SUBSOIL (B LAYER) SHALL BE REMOVED FOR A DISTANCE OF 5' WORK AREA PLAN FROM THE SOIL ABSORPTION SYSTEM DOWN TO THE CLEAN SAND LAYER, LAYER C1, APPROX. SCALE: 1" = 10' 33" BELOW GRADE. AREA TO BE BACKFILLED WITH CLEAN "TITLE 5" SAND AND COMPACTED TO MINIMIZE SETTLING. CONTRACTOR TO NOTIFY TOWN AND/OR ENGINEER TO VERIFY SOIL REMOVAL AS REQUIRED. 0 10 20 30 11. PROPOSED LINER: INSTALL A 40 mil HDPE LINER FROM EL=9.4 TO EL=8.3 AS SHOWN ON PLAN AND SAS DETAIL. SCALE 1"=10' 12. EXISTING SIDEWALK TO BE SAW CUT AND REMOVED AS NEEDED FOR SEPTIC INSTALL. SIDEWALK SHALL BE REINSTALLED WITH AN 8" PROCESSED GRAVEL SUBBASE AND PAVED WITH 3" (DONE IN TWO 1.5" LIFTS) USING MASSDOT #9.5 ASPHALT JOB MIX FORMULA 13. EXISTING PARKING LOT TO BE SAW CUT AND REMOVED AS NEEDED FOR SEPTIC INSTALL. PARKING LOT SHALL BE REINSTALLED WITH AN 8" PROCESSED GRAVEL SUBBASE AND PAVED WITH 3" (DONE IN TWO 1.5" LIFTS) USING MASSDOT #12.5 ASPHALT JOB MIX FORMULA PUMP NOTES & REQUIREMENTS: 1.) ALARM SHALL BE A RED WARNING LIGHT WITH AUDIBLE ALARM LOCATED WITHIN THE BUILDING AS SHOWN ON THE PLAN. 2.) THE CORDS FOR THE FLOATS SHALL BE ONE CONTINUOUS PIECE FROM THE PUMP CHAMBER TO THE DISCONNECT PULL BOX. THE CORDS SHALL BE ENCASED IN 3" ELECTRICAL CONDUIT. 3.) ALARM AND PUMP TO BE WIRED TO DIFFERENT CIRCUITS. 4.) ALL PUMP, WIRING, ALARM, AND FLOAT INSTALLATIONS SHALL CONFORM TO MASSACHUSETTS STATE PLUMBING AND MASSACHUSETTS STATE ELECTRICAL CODES AS WELL AS TO MANUFACTURER'S SPECIFICATIONS. 5.) PUMP SHALL BE LIBERTY LE41A SERIES it PUMP (OR EQUAL) MEETING MAXIMUM REQUIREMENTS OF 34 GPM AND 10.9' OF TOTAL DYNAMIC HEAD. INSTALLER TO VERIFY PUMP WITH MANUFACTURER FOR FLOW AND TDH. 6.) 30" FROM PUMP ON FLOAT TO INLET INVERT PROVIDES 336 GALLONS OF STORAGE. PUMP DOSING CALCULATIONS: 1. DETERMINE VOLUME OF EFFLUENT TO BE PUMPED TO LEACHING FIELD: DAILY FLOW = 220 GALLONS NUMBER OF DOSES PER DAY = 10 DOSES NUMBER OF GALLONS = 220/10 = 22 GPD DRAIN BACK VOLUME: 2" FORCE MAIN = 10 GALLONS PUMPING VOLUME = DOSING VOLUME + DRAIN BACK VOLUME PUMPING VOLUME = 33 GALLONS + 10 GALLONS = 33 GALLONS (min) 3. TOTAL DYNAMIC HEAD: 10.9 FT. 4. PUMP MUST BE CAPABLE OF PUMPING AT LEAST 33 GPM AGAINST A TOTAL DYNAMIC HEAD OF 10.9 FT SCHEMATIC FLOW PROFILE: NOT TO SCALE RAISE COVER TO WITHIN 6" OF FINISH GRADE C a DROP: 2" mir ,. 3" ma) 1D" *8.0± 48-1 *SEE NOTE GAS BAFFLE "n RAISE COVER TO GRADE WITH MIN. 24"- POLYLOK HEAVY DUTY (SCREW DOWN WITH GASKET) AND A MIN 24" PLASTIC RISER FINISH GRADE=10.5± Check Valve L Gate Valve -9-1-1 ; 3/8" Bleeder - Hole I I - 7.75 3.3± PROPOSED 2000 GALLON LOW PROFILE 2 COMPARTMENT SEP11C TANK/PUMP CHAMBER (H-20) PROPOSED 2 TIMBER WALL N O 6E�ROOMS DEEP OBSERVATION HOLE LOGS NO SCALE DEEP OBSERVATION HOLE 1 EL. = 9.0± DEPTH FROM SURFACE SOIL HORIZON SOIL TEXTURE SOIL COLOR MUNSELL 0" - 20" FILL - - - - - - 20" - 33" B LOAMY SAND 10 YR 5/8 33" - 100" C1 MED-COARSE 10 YR 8/6 SAND DATE OF TESTING: 11 /2/22 PERCOLATION RATE: LESS THAN 2 MIN/INCH (PERC IN C1 LAYER IN TP#1) WITNESSED BY: KEITH E. FERNANDES, PE, DIG -IT CONSTRUCTION, LLC. JAY GARDINER, ASSISTANT HEALTH DIRECTOR, YARMOUTH HEALTH DEPARTMENT GROUNDWATER STANDING ®88" BELOW GRADE (EL=1.67) IN TP#1 USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM. PROPERTY LINE INFO: 1. PROPERTY LINES AND BUILDING LOCATIONS PER CONDO SITE PLAN DATED 7/31 /1981 ON FILE AT THE BARNSTABLE COUNTY REGISTRY OF DEEDS. EXISTING SEPTIC INFO: 1. EXISTING SEPTIC COMPONENTS FOR LOTS 2-10 PER PLAN BY BSC GROUP DATED 9/25/2014 ON FILE AT THE YARMOUTH BOARD OF HEALTH. 2. EXISTING SEPTIC COMPONENTS FOR UNIT #1 PER SEPTIC INSPECTION REPORT DATED 1-25-16 BY B&B EXCAVATION ON FILE AT THE YARMOUTH BOARD OF HEALTH. SAS TIMBER WALL LAYOUT SCALE 1 " =10' PROPOSED TIMBERS SHALL BE INSTALLED SO 2't RE 5. 't 5'5�---t it OVERLAPPED BY TIMBERS ON BUTT JOINTS ON LOWER ROW TOP ROW TIMBER WALL -. SAS - TOP OF WALL EL=10.5± / ST - TOP OF WALL EL=10.5± 8" LONG TIMBER LOCK SCREWS INSTALLED 2' ON CENTER AND WITHIN N PROPOSED GRADE 'II '( VU/ 1' OF ENDS/OVERLAPS PROPOSED 6" X 6" TIMBER WALL (3) ROWS ABOVE GRADE PROPOSED 6" X 6" TIMBER SOLDIERS TO BE INSTALLED N e 8' ON CENTER (MAX), WITHIN 2' OF CORNERS, AND OF 2.5' BELOW GRADE (MIN). SEE DETAIL FOR LOCATION. 5 PROPOSED TIMBER RETAINING WALL EXISTING GRADE (SEE DETAIL) PROPOSED FLOW BARRIER (SEE NOTE #11) N PROPOSED (1) ROW OF TIMBERS TO BE BURIED BELOW GRADE 1 TIMBER "SOLDIER" 40 MIL HDPE FLOW BARRIER (SAS TIMBER WALL ONLY) PROPOSED TIMBER "SOLDIER N.. ST TIMBER WALL LAYOUT SCALE 1" =10' PROPOSED TEE RAISE COVER TO WITHIN 6" OF FINISH GRADE 4" SCH. 40 PVC INSPECTION PORT W/ 18" PIECE OF #4 REBAR RAISE TO WITHIN 3" OF GRADE 3' (MIN) PIPE SHALL BE PERFORATED FINISH GRADE=10.5 (min) WITHIN FIELD FINISH GRADE=10.5 (min) 4 PERFORATED PIPE 5' SOIL REMOVAL (SEE NOTE #10) PROPOSED INSPECTION PORT PROPOSED VENT SAS DETAIL SCALE 1 " =20' SYSTEM DESIGN CALCULATIONS: DESIGN FLAW: EXISTING 2 BEDROOM DWELLING AT 110 GAL. PER DAY PER BEDROOM = 220 GPD 220 GPD X 200% = 440 GALLONS -USE 2000 (2) COMPARTMENT MONO SEPTIC TANK/PUMP CHAMBER (1500 GALLON SEPTIC TANK & 500 PUMP CHAMBER) SAS AREA: A 25' L. X 12' W. X 0.5' D. LEACHING FIELD CAN LEACH: Vt = [(25 X 12)] X 0.74 GPD/SF = 222 GPD A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN. INSTALL: ONE (1) - 2000 GALLON LOW PROFILE SEPTIC TANK/PUMP CHAMBER (USE ACME/SHOREY STPC202LP) ONE (1) - 25' X 12' X 0.5 LEACHING FIELD ONE (1) - LIBERTY LE41A 4/10HP PUMP WITH CONTROL PANEL, FLOATS, AND ALARM ENTIRE PROPERTY IS LOCATED WITHIN AN AE FLOOD ZONE (EL-11) PER FEMA MAP PANEL 25001C0589J KEY MAP SCALE: 1" = 30' ' Sp,S 2�0; .a'( �Zr\nMs 4' BUOYANCY CALCULATIONS: 4" Sch. 40 PVC Vent Pipe 2000 GALLON SEPTIC TANK/PUMP CHAMBER (Passive Vent) by "Sweet Air" = (13' X 7' X 0.9' 62.4 LB CF (Based Groundwater Estimated Seasonal FBI / High Groundwater EL=4.2) = 5,111 Ibs FW TANK WEIGHT + SOIL COVER LINE(S) EXITING D'BOX SHALL BE LEVEL 33,500 Ibs. (Per. Spec) (NO SPEED LEVELERS) AND SHALL 23" Proposed REMAIN LEVEL FOR 2'-0" BEFORE (9" Min - 36" Max) FW� = 33,500 Ibs > Fe = 5,111 Ibs PITCHING DOWN TO LEACHING FACILITY 4" DIA SCH 40 PERFORATED PVC PIPE LAID ®O.OQ5 FT/FT SLOPE Delivery Line 4" DIA SCH 40 PVC PIPE 9.4± �2" ' 2" HIGH GROUNDWATER LEVEL FILTER FABRIC -Pitch 2" dia. DROP CALCULATION Force Main 917 Back to the 9.00 3/4" - 1-1 /2" STOKE DOUBLE WASHED STONE DEPTH TO WATER TABLE (11/2/2022) EL=1.67 7.75 Pump Chamber 8.93 ( 25' 8.3± � APPROPRIATE INDEX WELL: MIW-29 COMPACTED BASE 8.3± WATER LEVEL RANGE ZONE: A (0-2') ( W/ 6" LAYER OF *41'± - *SEE VARIANCE REQUEST CURRENT DEPTH TO WATER LEVEL (11/2022)• 9.4 0.63' S.so .5 DB-3 CRUSHED STONE (SIDE VIEW) D-Box LEACHING FIELD WATER LEVEL ADJUSTMENT: 2.5' (H-20) _ ESTIMATED DEPTH TO WATER LEVEL EL=4.2+ 61'± 6'± LONGEST RUN 25.0' x 12' x 0.5' 2.5 - GROUNDWATER ESTIMATED SEASONAL HIGH -�-�- EL=1.7± OBSERVED GROUNDWATER IN TEST PIT #1 11/2/2022 X \ f?-\QC- �(PN� 9 C, PUMP CHAMBER FLOAT DETAIL NOT TO SCALE OUTLET INVERT EL=7.75 I I Storage Volume �---1-Alarm (30" - 337 Gallons) 6" Pump On 48" Cycle Volume (3" - 34 Gallons) Pump ON/OFF 15" Sump •4 PUMP FLOAT NOTES: 1. FLOATS SHALL BE SECURED TO THE DISCHARGE LINE, INSTALLED ON A FLOAT TREE, OR PROVIDED WITH A CABLE WEIGHT. 2. FLOATS SHALL BE INSTALLED SO THAT THEY ARE ACCESSIBLE FROM THE OUTLET MANHOLE COVER. c FLOOR PLANS: 1. FLOOR PLANS TO BE PROVIDED SEPARATELY. s C_ OVER THE COUNTER VARIANCE REQUEST LOCAL UPGRADE APPROVALS: 310 CMR 15.403 VARIANCE: 310 CMR 15.212 -1b (Depth to Groundwater) 1.) Separation from bottom of Leach Field to High Groundwater not 5' 4' held 1' variance VARIANCE: 310 CMR 15.252: - 2F 1.) Separation from Leach Field to Existing Leach Pit not 10' 9' held 1' variance DIG -IT _ ��� CONSTRUCTION, LLC ,�_. qi ��. J d PO BOX 268 SOUTH DENNIS, MA 02660 PHONE: 508-432-1635 www.digitconstructionllc.com CLIENT: 785 ROUTE 28 LLC 176 SUDBURY LANE HYANNIS, MA 02601 21 \Users\kfern\Dig It Construction Dropbox\AAEngineering\Active Jobs\7014- 785 Route 28 Yarmouth\CAD\Plans\7014- SAS. dwg