Loading...
HomeMy WebLinkAbout18 Bass River Approved PlanGeneral Notes: 1. The general contractor and all subcontractors shall comply with state and local building codes & any governmental agency having jurisdiction. 2. Contractor shall obtain all required permits. Owners shall pay all permit fees. 3. Verify all dimensions in field. Report any discrepancies in drawings and/or field conditions to the architect 4. Do not scale drawings. If a dimension is not shown consult architect. List of Drawings: A-1 Plot Plan & General Notes A-2 Existing Plans w/ Demo. Notes A-3 Existing Exterior Elevations A-4 First Floor Plan A-5 Basement & Roof Plans/Door & Window Sched. A-6 Kitchen, Bathrooms Part-Plans A-7 Reflected Ceiling Plans A-8 Exterior Elevations A-9 Wall Section/ Finish Schedule A-10 Foundation & Framing Plans A-1 Plot Plan & General Notes Finish Schedule ROOM FLOORWALLSCEILBASELEGEND FLOORS F-1 Existing floor to be patched & refinished Kitchen F-2 W-3 C-3 B-2 F-2 New T&G 1/4 sawn oak plank; field fin. Pantry F-2 W-3 C-3 B-2 F-3 Ceramic tile thin set Laundry F-2 W-3 C-3 B-2 F-4 Clear seal coat over new concrete floor Living Rm.F-2 W-3 C-3 B-2 F-5 composite decking Screen Porch F-5 W-5 C-2 WALLS Master Bedroom F-2 W-3 C-3 B-2 W-1 New Clapboard siding Master Bath F-3 W-3 C-3 B-2 W-2 Existing wall finish patch & repair / Prep & PAint. Common Bath F-3 W-3 C-3 B-2 W-3 New GWB w/ plaster skim coat. Hallway F-2 W-3 C-3 B-2 W-4 New GWB w/ wood wainscot to 6' ht Rear Bedroom F-2 W-3 C-3 B-2 W-5 exterior shingle siding. front bedroom F-2 W-3 C-3 B-2 Ceiling: C-1 Existing ceiling to remain undisturbed C-2 PPVC beadboard C-3 New GWB ceiling w/ skim coat plaster finish Crown CR New 4" crown Brosco #8009 BASE B-1 Existing baseboard remains B-2 1x8 w/ cap. B-3 6" PVC flat stock 5. Coordinate locations to store all building materials & equipment with the owner prior to the start of work. Cover all materials stored outside, especially wood composite products and sheathing. 6. Coordinate the dumpster location with the owner prior to installation. 7. The contract documents include these drawings and a separate set of specifications. Consult both for the conplete scope of work, especially HVAC. B A-8 Site Plan 1" = 40' NOTE: Refer to Coastal Rengineering survey for the zoning informartion & Septic system design existing one story residence B A S S R I V E R R O A D 20'-0" New paved parking area 1155 sf +/- Line of existing driveway 2 A-8Enclose existing breezeway Demolish and replace existing garage Rebuild existing bulkhead 1 A-8 Electrical meter Fence remains undisturbed Remove existing stoop Existing open front porch to be partially screened-in Area of proposed septic system. refer to Coastal Engineering drwgs. Heat pump location. 1'= 10' ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-2 Selective Demolition Notes: Existing Basement PlanExisitng First Floor Front Porch Kitchen Laundry Living rm.15'-3" Master bedroom Bedroom Garage OpenBreezeway 16'-0 3/8"22'-2 1/4"7'-2 7/8"DN-9 DN-10 DN-1 DN-11 DN-2 DN-3 DN-7DN-8 DN-6 DN-4 Hall DN-5 Existing Floor Plans & Demolition Notes Full Basement Crawl Space Crawl Space water service Oil tank Electrical Service boiler INTERIOR: DN-1 Kitchen/Laundry bathroom: - Remove all cabinets, countertops, appliances, electrical & plumbing fixtures and rough-ins. - Remove wall and ceiliing finishes, remove finish floors - Remove the interior walls around the bathroom and between the kitchen and backhall/ laundry - Remove the step into the living room. DN-2 Living Room: - Remove the large window facing the porch and the front door. -Remove the closet door & frame. - Remove the carpet and finish fllor down to the subfloor. - Remove the moulding around the firplace and the mantel shelf. DN-3 Master Bedroom: - Remove wall and ceiling finishes, remove finish floors - Remove the interior walls around the closets. - Remove the extrior wall facing the garage. Shore to remove. - Remove the interior wall between the closets & bathroom/hallway. DN-4 Common Bathroom: - Remove and plumbing & electrical fixtures . - Remove wall and ceiliing finishes, remove finish floors - Note the plan is to replace the fixtures in the same locations. Rough-ins remain unless compromised. DN-5 Hall: - Remove wall and ceiliing finishes, remove finish floors - Remove the interior walls around the closets. - Remove the wall between the hall and bathroom/ hall. - Remove the interior walls around the closet against the master. DN-6 Rear Bedroom: - Remove wall and ceiling finishes, remove finish floors - Remove the interior walls around the closets. - Remove a portion of the wall between the bedroom & hallway. See floor plan A-3 DN-7 Breezeway: - Remove the roof assembly in its entirety including all framing. - Remove the paving material between the garage and house. - Remove light fixture and assoc. wiring. DN-8 Garage: - Remove the garage structure in its entirety including roof and wall assemblies, foundation and floor slab.b DN-9 Bulkhead - Remove The bulkhead assembly entirely including wood door, and concrete walls and stairs to be replaced. DN-10 Rear Stoop: - Remove the Rear masonry stoop in its entirety. DN-11 Front Porch: - Remove all wod plank decking - Remove the trim around the columns; remoce the fascia & soffit. - Remove the finish ceiling & lighting fixtures. BASEMENT NOTES: -Remove the basement windows (6) Openings to be infilled with CMU -Remove the bulkhead interior door, to be replaced. -Excavate and remove forst wall & retaining wall for new basement area. Refer to structural drawings for notes and details. GENERAL DEMOLITION NOTES: - Protect the interior from moisture and weather when doors and windows are removed. Cover openings with plastic or rigid board. - Remove the interior GWB from all exterior walls and remove the cavity insulation, to be replaced. - Remove the existing AC system including the condenser, air handling equipment and all ductwork and registers. SALVAGE ITEMS: Carefully remove the following items to be salvaged and donated to Habitat for Humanity. Store and coordinate pick-up. -Exterior 9 lite doors (2); Exterior 2 lite door ; - Garage door w/ track & motor assembly - 6 Panel interior doors & Frames & Louvered closet doors - Surface mounted light fixtrues - Bath tub; Drop-in sink & faucet. - Microwave; Refrigerator, Dishwasher - SS kitchen sink and faucet. - Shower Sliding door assembly (plastic panel) - Vanity w/ sink and faucet. - Exterior light fixtures, wall mounted (3) Crawl Space demolish the garage and breezeway in their entirety 1/16"= 1'0" ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope Remove breezeway roof assembly in its entirety Remove roof face at master where gable extends over addition Shore remaining ridge and roof structure as required. Remove garage structureExisting Elevations w/ Demolition Notes Exterior Demolition Notes: A-3 Side Elevation-Driveway Front Elevation- Street Side Elevation-Yard Rear Elevation Roof Plan Tear down existing garage to replace in kind. Remove garage structure Remove garage structure Remove garage structure Remove the masonry landing under the breezeway roof with the slab below. Remove the bulkhead assembly in its entierty Remove the arched trim and colun trim & plank ceiling at the porch. Remove the breezeway roof assembly Remove the breezeway roof assembly Remove the arched trim and colun trim & plank ceiling at the porch. Remove the entire garage structure including foundation - Remove all exterior doors and windows. - Demolish the garage structure in its entirety including the slab and frost wall. Note the structure is to be replaced in-kind in the same footprint. - Rmove the shingle & clapboard siding around the entire house down to the wood plank sheathing. - Remove the exterior casings at all doors and windows. - NOTE: The eave assembly and rakes may remain where the material is not compomized - Remove the gutters and downspouts. Facia boards may remain - Remove the breezeway roof assembly in its entirety including all trim, shingle and framing. - Remove the bulkhead assembly including walls and stairs - Remove the basemnet window wells (6). - Remove the shrubbery around the base of the building. - Remove the porch trim, ceiling and decking. Remove the door assembly and the masonry stoop in its entirety. 1/16"= 1'0" Remove window. Cut in new window openings ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope 1/8" = 1'-0" First Floor Plan A-4 Screen Porch Living room. 12'-7 1/4"19'-3"22'-6" Front Bedroom Rear Bedroom 15'-5"Aluminum full ht. screen panels set in trimmed jamb. Refer to post details Master Bedroom 2'-3 1/2" Kitchen 5'-0 1/8" 3'x4' islandpantry Master bath Linen Common bath Frame floor platform in garage & breezeway to align with house. Finish w/ T&G wooood plank flooring 10'-5"2'-4"9'-4"12'-0" field verify 13 1 field verify 7'-9 1/4" addition 11'-0" 6'-8" field verify Existing porch posts remain. Remove existing trim including arches between posts; New PVC trim. Refer to elevations. New trim to accommodate alumin. screen panels. Remove deck plank & replace with composite decking. Frame infill at depressed landing to align new decking with remaining porch Reframe doorway to raise opening to new floor height. 2'-9"2'-9"6'-8" 4 5'-5"2'-8"2'-8"5 11'-2" Infill existing window & door openings around new kitchen. Frame new openmings as shown. Build raised floor platform at kitchen, laundry and pantry to living room ht. Refer to structural sheet A-10 Infill existing window & door openings around new kitchen. Frame new openmings as shown. 89 10 11 12 Install outdoor shower w/ valve for seasonal draining. 2'-0"7'-5" 3 Remove LR window , Frame opening for new 4 panel sliding door. Shore to install new header Frame new 4'6" finished opening into exist wall; partial infill exist. opening; patch to match wall finish and baseboard. Remove & rebuild bulkhead. w/ concrete walls & floor slab; PT open riser stair & Bilco metal door. Frame stoop & step; between walls: landing & tread composite decking 20 24 24 14 6 6 1 1 25 25 25 15'-9" 22 Granite stoop 42" x 42" over compacted base. 28 6'-5" field verify 1 A9 3 A9 Heat pump location Stone pavers over 6" crushed stone base Solid fence and gate by others 27 276'-0"verify in fielddn.2R Laundry 1 NOTE: green shaded area indicates the addition Entry8'-10"9'-6"Remove section of wall in hallway; patch to match wall, ceiling & floor. Frame stoop & step; between walls: landing & tread composite decking Remove the existing exterior door, remove hardware & patch Jamb at framed opng.9'-0"Remove the exterior door & frame Patch to match inside and out 12 13 2'-0" 21 17 6'-0"2'-0"22 dn. 2R 13 3'x6' tiled shower stall w/ glass front pitch tiled floor to center drain 5' long vanity selected by owners w/ mirror above Remove and replace all the fixtures and finishes in the common bathroom ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope Basement Plan/ Roof Plan Door & Window Schedule ROUGH OPNG.MFG.Light SILL DESIG.ITEM LOCTION W X HT.QUANT.MFG.PRODUCT NUMBER Layout HT. 1 casement window master bedrm.2'-4 3/8"x 4'-0"three Andersen 400 Series Woodwright Casement CW 14 one 2'3" 2 OMIT 3 four panel slider living room 9'10" x 6'8"one Andersen Frenchwood Gliding Patio Doors FWG10068-4 one n/a 4 exterior door kitchen 3'0" x 6'8"one Simpson Exterior French Door - Fir #7001 one n/a 5 casement window kitchen 2'-4 3/8"x 4'-0"three Andersen 400 Series Woodwright Casement CW 14 one 2'3" 6 casement window kitchen 2'4 3/8"x3'0 1/2"five Andersen 400 series casement CW13 one 3'4" 7 OMIT 8,9,10,11 casement windows LR., Rear bedrm.2'-4 3/8"x 4'-0"four Andersen 400 Series Woodwright Casement CW 14 one 2'3" 12 exterior door hallway 3'0x6'8 one Simpson Fir 2 panel door / w 1/4 panel glass #165 one n/a 17 Ext. door & sidelight entry 3'0 dr; 2'0 sidelight one pair Simpson Fir 2 panel door 'Traditional Sash' / w 3/4 panel glass one n/a 13,14 casement window master bedroom 2'-4 3/8"x 4'-0"five Andersen 400 Series Woodwright Casement CW 14 one 2'3" 15 OMIT ` 16 OMIT 20, 21 interior door master bed & bath 2'8 1/2" x 4'8 7/8"two Simpson 2 panr Flat panel door- Fir #782 n/a n/a 19 OMIT 22 closet doors master bedroom 3'0"x 6'8"two Simpson 2 panr Flat panel door- Fir #782 n/a n/a 23 Insulated metal door bsmt. bulkhead 3'0"x6'8"one Jeld-Wen Contours Collection Steel door none n/a n/a 24 pocket door laundry & Pantry 2'6" x6'8"Simpson 2 panr Flat panel door- Fir #782 n/a n/a 25 fixed window master, front bed, KIit 2'-4 7/8x2'-4 7/8"four Andersen 400 series casement CW 125 one TBD 26 OMIT 27 fixed window panel kitchen corner 2'0 1/8"x4'11 7/8"two Andersen 400 series casement- tempered.C15 one 1'3" 28 & 29 OMIT linen closet Roof PlanBasement Plan A-6 DS DSDS DS DS DS DS DS DS DS DS Crawl space area under addition w/ slab Crawl space area under existing house w/ new slab GENERAL ROOF NOTES: -Install Ice & Water shield at all eaves, valleys & ridges. -Coordinate downsout locations w/ architect prior to installation. -Re-flash existing chimney -Replace shingle assembly over the entire roof. Remove windows infill opening w/ CMU Typical (6) Remove & replace interior door; weather seal HM door frame. Remove & replace bulkhead concrete walls and floor. enlarge to reduce the slope of the stair. Build stair from PT 2x stock. Install Bilco Steel door assemly. Existing bioler and oil tank to remain to supplement heat pump system New air handler w/ ductwork distribution in crawl spaces Existing crawl space w/ new slab 23 DS DS Extend full basement into the existing crawl space. see structural sheet A-10 Crawl space area under existing house w/ new slab s/c F7 F7 F7 F7 F7 F7 F7 s ss 1/16"=1'0" DS ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-6 3/16" = 1'0" Kitchen & Bathroom Part Plans dishwasher sinkcabinet cornercabinetrefrigeratorBase Cab.Base Cab.Base Cab.Base Cab.Upper Cab range w/ hood abv. Kitchen Part-PlanA Mud set shower stall, slope to drain w/ tiled walls & ceiling & one piece curb cap. Install shower niche as per owner Master Bathroom part-plan& upper cab.B 3/16" = 1'0" Kitchen Master bath11'-0"4'-0"3'-0"2'-0"3'-0"2'-0"15'-6" 1'-0" 3'-0"2'-0"2'-0"3'-0" 1'-6"3'-0"2'-0"2'-0"3'-0"2'-0"3'-9"4'-0"3'-4"3'-9"3'-0"Base Cab. corner cabinet tray cab. corner cabinet cornercabinetBase Cab. Base Cab. 2'-0"2'-0" Drawer unit pantry 3'-0"Three- 2'4" wide upper cabinets 4'-0"VIFLocate walls gainst masonry chimney w/ req'd clearance Full ht pantry cabinet with open shelving 16" deep. (no wall behind). W/D 5'-4"Vent dryer through the exterior wall Countertop/. w/ Upper CabinetPrep & refinish existing bookshelves facing LR Laundry Mortar a one piece 1" thick Bluestone hearthstone over existing raised brick heath New casings at exist. framed opening millwork end panel at refrig. Raise floor in kitchen area to align with LR. Refer to framing plans A-10: Remove existing step. 5'-0"3'-1"6'-0"12'-0" as noted ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-7 Reflected Ceiling Plan Electrical Notes: -Install jamb switch for closet fixtures. -Vent bathroom exaust fans up through the roof. -Refer to Basement plan on sheet A-5 for: Install combo smoke/ carbon mono. detector Lighting in basement & crawl space. -Refer to plan to determine two and three way switches. -Owners to select dimmer switch. -Use timer switches on the bathroom fans. Refer to the specifications. -All electrical boxes on exterior walls or ceilings shall be gasketed and air sealed. -Provide lighting to light all areas of the attic; switch at top of pull down ladder. sSmoke Detector c s s/c Carbon Monoxide detector Combination smoke/ Carbon monoxide detector Fire Protection Legend Cable TV signal line Duplex outlet ( install in adition to code reqmts.) Dimmer Switch Electrical Legend Heat DetectorH s d LIGHT FIXTURE SCHEDULE FIX.TYPE DIMEN.MOUNTING MFG.MODEL NOTES F-1 LED downlight 4" dia.recessed Nicor DC R4 new construction; 106; 120 v; 2K; white trim; 644 lumens; 8.4 watts F-2 Room fan surf. mtd.Onwer to provide fan; contractor to install. F-3 Exhaust fan/light Onwer to provide fan; contractor to install. F-4 pendant surface Onwer to provide fan; contractor to install. F-5 Bathrm. fixture -wall mtd.Provide $150 fixture allowance per fixture F-6 Exterior wall sconce Provide $250 fixture allowance per fixture F-7 LED surface mtd.closet fixture contractor to select F-8 wall sconce surface mount Provide $250 fixture allowance per fixture F-9 under cabinet undershelf contractor choice F-10 LED downlight-exterior 4" dia.recessed Nicor DC R4 damp location. ; 106; 120 v; 2K; white trim; 644 lumens; 8.4 watts F-10 2 head flood light contractors choice At closet fixtures F7 provide jamb swithing. Provide LED lamps to downlights shown; Provide dimmers for downlight locations with 'd' designation. s s s s sssssdssdddd 1/8" = 1' F1 F1 F1 F1 F1 F1F1 F1 F1 F10 F1 F1F1 F1 F1 F1 F10 F10 F10F10F10F10slocate flood under eave F9 F9 F6 F4F4 d F4 Shaded area indicates raised coffer ceiling- see section details 3 A9 Locate home-runs for audio/visual systems to cabinet in the living room F10sssssssNOTE: Existing ceilings in bedrooms, bathroom, hallway and living room are to remain s sF1 F1 F1 F1 F1 F1 F1 F3 F5 F10 F5 F6 F6 Replace wood ceiliong with PVC Bead board sheet stock cover butt joints with 1x3 PVC flat stoclk maligned with posts PVC Bead board sheet stock ceiling 2 A9 Shaded area indicates raised coffer ceiling- see section details ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-816" = 1'-0" Exterior Elevation North (rear) Elevation South (front) Elevation East (yard) ElevationWest (side) Elevation New entry replaced garage New door in new wall at existing breezeway New PT stoop & stair w/ composite decking & skirt bd. Kitchen windows in new openings in existing wall 1x4 PVC corner boards (typ.) Remove siding to install Hardi-board cladboard w/ 4" exposure (typ.) Strip existing roof membrane; Install asphalt shingle over 30# building paper; Copper drip edge. Replace chimney flashing as needed. prep and paint brick chimney Existing windows to remain. Replace casings & refinish the wood sill New gable Replace chimney flashing as needed. Kitchen windows in new openings in existing wall Remove and replace porch trim; enclose with screen panels wooden screen door at porch enclosure Granite stoop stone set over compacted base. replaced garage Typical window Trim: 5/4 flat stcok w/ backband; 1" sill w/ horns Build cricket between between roofs; sheath crricket in Ice & Water Shield beofr roofing replaced garage new entry New vestibule w/ entry door & sidelight set back from the front; built within the existing porch windows in new openings in existing walls Remove and replace porch trim; enclose with screen panels 1 2 4 3 1x6 PVC Beveled T&G vertical plank panel w/ 1x4 & Rake Crown AZM at the top and Crosshead Pediment AZM- 6216 at the bottom at gable ends 2'-8"ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-9 2x6 wood stud 16" OC wall assembly w/ wet application Cellulose insulation in the walls 10" x 20" reinf. concrete footing w/ key slot under wall. Set over undisturbed or compacted base. Install 2x blocking between roof rafters; air seal around joints between framing members before covering w/ wall sheathing.NOTE: Exterior insulated wall sheathing extends up to the underside of the roof sheathing. Air seal before enclosing w/ fascia & soffit Aluminum drip edge under double starter course asphalt shingle. Install 24" width Ice & Water Shield across roof eaves, ridge & walls; Aluminum 'K' style gutter pitch to leaders. 1x8 PVC facia board; 3/8" PVC sheet stock soffit. PVC Barge board between to match existing trim. 1'-3" 1/2 GWB ceiling w/ skim coat plaster finish over 1x strapping; 2x6 ceiling joists 16"OC 3" 'mud' concrete slab over 2" rigid insulation over compacted soil in existing crawl space ans 3" crushed stone in addition. Typical Wall Sectcion New Asphalt shingles to match exisitng over 30# bldg. paper; over existing roof deck PT 2x sill plates fastened to foundation w/ 1/2" dia. anchor bolts 5' OC. over compress foam seal. Insulate floor of addition w/ netted cellulose between joists; and in knee wall 8" concrete foundation wall; enclose Tie new walls to existing concrete corner pier w/ rebar or wire mesh. 4'-0"9"8'-3"Align w/ existing main floor 2'-6"3" closed cell spray foam insulation over foundation & up into the rim joist. Apply fire retardant coating. Factory primed wood shingle siding exposure to match existing Double starter course of wood shingle & plywood sheathing overlap top of concrete. No water table trim; install termite guard. Air seal framing at concrete, before sheathing. 1 1/2" Zip insulated panel exterior . sheathing. Use mfg. recommended fasening. Tape all joists & air seal top and bottom. 16" = 1'-0" Exterior Elevation Building Section at Kitchen10'-0"Building Section at Side Bedrm.10'-0"1 3 1 6'-6" ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-10 1" = 16' FOUNDATION NOTES: 1. 8" 3000 psi concrete foundation walls: Top of foudation to match existing. Reinforced as follows: 1-#5 top & bott. continuous bars w/ #5 corner bars w/ 30" legs to lap w/ t&b bars. 2. 10" deep x 20" wide 3000 psi concrete footings over compacted or undisturbed soil with assumed allow. bearing value of 2 tons/sf. Bott. of footing 48" below grade. 3. Forms shall remain a FULL 24 hrs. min. after pours for wet cure concrete. 4. Tie new concrete foundation walls to exist. foundation w/ #5 16" OC x 30" long dowels set 6" into existing founda. walls w/ epoxy grout. 5. 3" thick concrete slab over compacted grade grade over 3" rigid insulation board. 6. ZONING REQUIRES THE ADDITON REPLACING THE GARAGE BE LOCATED EXACTLY OVER THE EXISTING GARAGE FOOTPRINT. ROOF FRAMING NOTES: 1. Install 2x12 roof rafters 16" OC (depth of insulation). Tie rafters to the top of wall w/ metal hurricane ties 2. 5/8" 'Zip ply" roof sheathing. 3. Strip roofing down to wood roof deck where new construction build-overs existing assemblies 4. Provide all blocking, bracing, nailers etc. as required to complete job and meet code requirements. Provide fire stopping in voids between floors and as required by code. 5. Hardware: Use Teco type connectors and hangers at joists framing, roof framing and post & beam connections. WALL & FLOOR FRAMING NOTES: 1. 2x6 wood stud exterior wall framing 16" OC double top and bottom plates; treated sill plate fastened to foundation wall w/ cast- in-place anchor bolts. 2x4 interior partitions. 2. Use double 2x10 headers at window and door openings w/ 1" Rigid insulation board between at exterior walls 3. Fasten joists to top of wall w/ metal anchor ties. 4. Use double 2x10 headers for all openings under 6'0" where load bearing. When framing new headers in existing partitions install new jack studs to support headers. 5. Strip siding down to exterior sheathing around entire building. 6. Exterior sheathing: 1 1/2 " ZIp panel with integrated rigid insulation Board. Fasten as per mfg. recmmendations. Box out window & door openings w/ 3/4" pywood around openings. at new and existing exterior walls. Foundation plan First floor framing planRoof framing plan 9'-6"17'-6"field verify9'-0" existing basement Build new floor plateform above existing dropped floor w/ 2x8 16" OC; bearing on 2x sleepers at midspan 14'-8"+/- VIFBuild new floor plateform above crawl space slab w/ 2x10 16" OC 11'-2" +/- VIF 8'-1"span Exterior landing & stair stringers use PT lumber; joists 2x8 16" OC; 2x12 stringers 11'-2"+/- VIF 2X12 16" OC roof rafters w/ 2x6 collar ties at every pair; see section detail Breezway roof: 2x10 16" OC; Over build crickets above adjacent roofs; bear on the roof sheathing w/ 2x sleepers. Existing roof structure to remain Foundation & Framing Plans Align 22'-4"field verifyNew slab in exist crawl space New slab in exist crawl space New slab in exist crawl space New slab in new crawl space 8'-1" field verify 5'-6"5'-8"Remove/ replace bulkhead walls & floor w/ poured conc. walls & 3" conc. slab 12'-3" field verify existing existing existing existingRemove the decking and expose existing deck struc. Consult w/ owner & architect to develop remdiation where structure is compromised. Existing roof structure over the kitchen remains. Install new 2x6 coloar ties 10' ht. for cathedrel ceiling refer to sections A-9 Pin new frost walls to existing foundation walls New 8" frost walls under existing garage & breezeway 48" below grade; Align top of wall with house; footings- 10" deep x 20" wide. Build new floor plateform above crawl space slab w/ 2x10 16" OC Existing crawl spaces: rake smooth the soil; remove all debris or large stones; pour 1 1/2" 'rat slab' over 1"rigid insuilation bd; seal perimeter. Install a structural ridge under the existing ridge 1-12 1/4" LVL span 15'-9" bear on solid posr Double 12 1/4" LVL structural ridge 22' span. 12" x12" x12" conc. pier to support post under the end of the structural ridge Bring solid post supporting ridge through floor framing to conc. pier below ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, Ma. Gagne Residence 5/2/22 pricing set 8/2/22 reduced scope A-10 1" = 16'0" FOUNDATION NOTES: 1. 8" 3000 psi concrete foundation walls: Top of foundation to match existing. Reinforced as follows: 1-#5 top & bott. continuous bars w/ #5 corner bars w/ 30" legs to lap w/ t&b bars. 2. 10" deep x 20" wide 3000 psi concrete footings over compacted or undisturbed soil with assumed allow. bearing value of 2 tons/sf. Bott. of footing 48" below grade. 3. Forms shall remain a FULL 24 hrs. min. after pours for wet cure concrete. 4. Tie new concrete foundation walls to exist. foundation w/ #5 16" OC x 30" long dowels set 6" into existing founda. walls w/ epoxy grout. 5. 3" thick concrete slab over compacted grade grade over 3" rigid insulation board. 6. ZONING REQUIRES THE ADDITION REPLACING THE GARAGE BE LOCATED EXACTLY OVER THE EXISTING GARAGE FOOTPRINT. ROOF FRAMING NOTES: 1. Install 2x12 roof rafters 16" OC (depth of insulation). Tie rafters to the top of wall w/ metal hurricane ties 2. 5/8" 'Zip ply" roof sheathing. 3. Strip roofing down to wood roof deck where new construction build-overs existing assemblies 4. Provide all blocking, bracing, nailers etc. as required to complete job and meet code requirements. Provide fire stopping in voids between floors and as required by code. 5. Hardware: Use Teco type connectors and hangers at joists framing, roof framing and post & beam connections. 6. Unse Simpson Strong-Tie hurricane ties #H2.5A at each roof rafter connection to the wall top plate. WALL & FLOOR FRAMING NOTES: 1. 2x6 wood stud exterior wall framing 16" OC double top and bottom plates; treated sill plate fastened to foundation wall w/ cast- in-place anchor bolts. 2x4 interior partitions. 2. Use double 2x10 headers at window and door openings w/ 1" Rigid insulation board between at exterior walls 3. Fasten joists to top of wall w/ metal anchor ties. 4. Use double 2x10 headers for all openings under 6'0" where load bearing. When framing new headers in existing partitions install new jack studs to support headers. 5. Strip siding down to exterior sheathing around entire building. 6. Exterior sheathing: 1 1/2 " ZIp panel with integrated rigid insulation Board. Fasten as per mfg. recommendations. Box out window & door openings w/ 3/4" plywood around openings. at new and existing exterior walls. 7. Use Simpson Stong-Tie strap- 71E holdown #S7HD10RJ on either side of each corner of the floor deck to connect to the concrete 8 total. Foundation plan First floor framing planRoof framing plan 9'-6"17'-6"field verify9'-0" existing basement14'-8"+/- VIFBuild new floor platform above crawl space slab w/ 2x10 16" OC 11'-2" +/- VIF 8'-1"span Exterior landing & stair stringers use PT lumber; joists 2x8 16" OC; 2x12 stringers 11'-2"+/- VIF 2X12 16" OC roof rafters w/ 2x6 collar ties at every pair; see section detail Breezeway roof: 2x10 16" OC; Over build crickets above adjacent roofs; bear on the roof sheathing w/ 2x sleepers. Existing roof structure to remain Foundation & Framing Plans Align 22'-4"field verifyNew slab in exist crawl space New slab in exist crawl space New slab on grade in new crawl space 8'-1" field verify 5'-6"5'-8"Remove/ replace bulkhead walls & floor w/ poured conc. walls & 3" conc. slab 12'-3" field verify existing existing existing existingRemove the decking and expose existing deck struc.. Consult w/ Owner & Architect to develop remediation where structure is compromised. Existing roof structure over the kitchen remains. Install new 2x6 collar ties 10' ht. for cathedral ceiling refer to sections A-9 Pin new frost walls to existing foundation walls New 8" frost walls under existing garage & breezeway 48" below grade; Align top of wall with house; footings- 10" deep x 20" wide. Build new floor platform above crawl space slab w/ 2x10 16" OC Existing crawl spaces: rake smooth the soil; remove all debris or large stones; pour 1 1/2" 'rat slab' over 1"rigid insulation bd; seal perimeter. Install a structural ridge under the existing ridge 1-12 1/4" LVL span 15'-9" bear on solid posts Double 12 1/4" LVL structural ridge 22' span. 12" x12" x12" conc. pier to support post under the end of the structural ridge Bring solid post supporting ridge through floor framing to conc. pier below 1 A9 1 A9 1A9 Pantry/laundry/landing platform 1 riser below LR 3A9 2A9 4'-7"4'-0" A9 4 Cut back roof truss framing to build cove for transom light 4' wide x 4'6"+/- deep. See section. Build platform over exist. floor structure w/ 2x6 16" OC; support on sleepers New slabon grade in new crawlspace Drop top of founda. wall between crawl spaces for access & duct runs Use Simpson Strongtie Hurricane ties to connect eact rafter to the top plate Install strap hold-downs at each corner 8 total ENTASIS PC Jay C.Walter AIA 83 Pembroke Street Newton, Massachusetts 02458 e-mail:entasis@rcn.com telephone: (617) 527-8383 SKETCH NO. SCALE: DATE: Gagne Residence Addition & Remodeling 18 Bass River Road South Yarmouth, MA Gagne Residence 8/2/22 reduced scope 8/12/22 detail clarification 10/28/22 const. contract 3/6/23 struc. ties added.