Loading...
HomeMy WebLinkAboutZ486.01 - FedEx - South Yarmouth MA - FR39 (4-7-23)NORTHEAST GEOTECHNICAL, INC. DAILY FIELD REPORT PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 39 PAGE 1 OF 2 PROJECT NO: Z486.01 DATE: 4/7/2023 LOCATION: 225 White’s Path, South Yarmouth, MA CLIENT: 225 White’s Path Units 2 and 3, LLC WEATHER: Clear, 40-50°F CONTRACTOR(S): DellbrookǀJKS 1. Henry Tinoco arrived on site at 1000 hours. Left site at 1100 hours. 2. Earthwork observed: A) Per the request of Dellbrook, the undersigned visited the site today to perform field density tests (FDT) on previously placed and compacted base course fill along a previously excavated and backfilled trench within the pavement area located to the west of the building (see Site Sketch, Figure No. 1). The undersigned performed FDT nos. 1 through 3 on the base course material (see attached Figure No. 1 for approximate test locations). The base course fill material appeared to generally consist of brown, fine to coarse SAND, some fine to coarse Gravel, trace Silt. The test results indicated that an adequate degree of compaction was achieved at each test location. Refer to the Summary of Field Density Tests sheet on page 2 of this report for additional information. 3. Attachments: Figure No. 1 – Site Sketch Photo Log 4. Distribution: Greg Bilezikian – 225 White’s Path Units 2 and 3, LLC Rick Fenuccio – ClearPath Advisors, LLC Kurt Raber – Catalyst Architecture & Interiors Kate Wollman – Catalyst Architecture & Interiors Mike Schmidt – DellbrookǀJKS David Fernandes - DellbrookǀJKS Marina Denisova - DellbrookǀJKS Scott Mitchell - DellbrookǀJKS Mark Grylls – Town of Yarmouth Building Commissioner Tim Sears – Town of Yarmouth Deputy Building Commissioner ONSITE: TRAVEL: REPORT: TOTAL: 1.00 hour 1.50 hours 1.00 hour 3.50 hours Henry Tinoco FIELD REPRESENTATIVE Mark Zambernardi, P.E. REVIEWER Tel: 508-598-3510 NORTHEAST GEOTECHNICAL, INC. SUMMARY OF FIELD DENSITY TESTS PROJECT: Proposed FedEx Distribution Facility FIELD REPORT NO: 39 PAGE 2 OF 2 PROJECT NO: O486.01 DATE: 4/7/2023 FIELD DENSITY TEST NO. APPROX. ELEV. CORR. MAX. DRY DENSITY (PCF) OPTIMUM MOISTURE (%) IN PLACE DRY DENSITY (PCF) MOISTURE CONTENT (%) COMPACTION (%) REMARKS 1 T.O.B.C. 135.2 6.4 131.9 7.8 97.6 1,2,3 2 T.O.B.C. 135.2 6.4 128.4 6.8 95.0 1,2,3 3 T.O.B.C. 135.2 6.4 129.7 6.3 95.9 1,2,3 REMARKS: 1. Density test performed with the Troxler Series 3440 Moisture/Density Gauge. 2. Tested fill generally representative of fill sample FS-3. 3. Satisfactory compaction percentage achieved at test location. 4. T.O.B.C. = Top of base course fill. Henry Tinoco FIELD REPRESENTATIVE NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 39 Page 1 of 2 Photograph #1 Description of Photograph: Previously placed and compacted base course material. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 4/7/23 Photograph #2 Description of Photograph: Performing Field Density Test (FDT) no. 1. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 4/7/23 NORTHEAST GEOTECHNICAL, INC. Z486.01 Proposed FedEx Distribution Facility – 225 White’s Path, South Yarmouth, MA PHOTO LOG – FIELD REPORT NO. 39 Page 2 of 2 Photograph #3 Description of Photograph: Results of FDT no. 1 on previously placed and compacted base course material. (Item 3A) Photograph Taken By: Henry Martinez Tinoco, dated 4/7/23 1d'"' 1 n \ \ ...-.-,--- -�i''' V' '-' Co c.,SX- , .✓ I ✓ � eeoe«l'D li:'47FB QUAllll UMI \..., · rns 202sb1' I --,,noIHV 111-,ll t2(£XC86) /NV W•lll2(c»IH-4)\ IN\ Ot/T•.'2.61 \ i \ PBQPQZD CB-Z o Rlll•::J0.401 \ /NV-J5. Pl\ 'LG \ �s!t� \ '29 L.F. 12" \ 11 ltlPC s-1.,,_ (,,'' I 74 L.F. 12°1 •: L � S-I.OK , , l' ' " 1.5� L.F. 24" :. u ' ';· / ,,/ CTf<rf /1! ,r NJ' <· '2) -'\K '\1\ ,, '•) 1� s-r-; o;,, � • \ \ \\ ' _.......,sf< ' r / '-\ • \ -� -<' 7 PB9f'Q5EP P!P:f:f -0 \ ,. �-\ i• RlAf<: .J9.IO \ \ WV#!• .J5.20(C8-5� ./ o " INV /Ha J5.17(C&c-7 WV tHl.. JJ.52ii�� , . \\ ,.::,�=:,:e�l.'I wv our,, 1 JJ.-l2\ , .·., I�, � \ -:=,_ �;v \ L.F.d!ri.\ q_ i \ T• JJ.M 11!1 LF. HOPE. s­ PJ!QPQSfD --.311. IHV- 3.5.40 , :< t "' / ,, }/" ov )f, J,Y A' \/, D yp I -�NORTHEAST GE □TECHNICAL X, NOTES: 1. BASE MAP DEVELOPED FROM PLAN TITLED "SITE GRADING AND DRAINAGE PLAN", DRAWING No. C-103, DATED 6/14/2022, BY CHA. 2. AREAS OF CONSTRUCTION SHOWN ON THIS SKETCH ARE APPROXIMATE. LEGEND: • APROXIMATE LOCATION OF FIELD DENSITY TEST. X X NORTHEAST GEOTECHNICAL, INC. PROPOSED FEDEX FACILITY 225 WHITE'S PATH SOUTH YARMOUTH, MA Project No.: 2486.01 SITE SKETCH Field Report No.: 39 Date: 4/7/23 Drawn By: HMT Figure No.: 1 JACK POWERS, 10/03/2022, 1 6:24: 1 2 I FILE: C:\NORTHEAST\2022\Z486.01 SOUTH YARMOUTH\PLANS\048601 FSK 1 .DWG