HomeMy WebLinkAbout SE3-1123 REQ FOR CERT OF COMPCONSERVATION
OFFICE
!e% of eot" &mw �� &A � J� % kj�A� -,7= tj j � I
• All filings must be made on Town of Yarmouth forms.
• All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
• Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
• Contact the Conservation Office if you need assistance.
S acra Cl�peicactiafa:
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
J1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzoCayarmouth.mamuss
Signed statement from an Engineer or similar professional to who prepared the
approved plan. — Include in hardcopy and digital submission.
As -Built plan —Include in hardcopy and digital submission. Refer to 310 CMR
10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if
required*.
Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel -related Conservation documents.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(a)�yarmouth.ma.us
Rev 2/2023
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
ras
ICI
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information
1. This request is being made by:
Laurie Gallagher
Name
18 Lincoln Street
2
3
Mailing Address
Dedham
City/Town
Phone Number
MA
State
This request is in reference to work regulated by a final Order of Conditions issued to:
Leonard Gallagher
Applicant
May 29, 1991
Dated
The project site is located at:
13 Sagamore Road
Street Address
29
Assessors Map/Plat Number
SE83-1123
DEP File Number
West Yarmouth
City/Town
128
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Leonard Gallagher
Property Owner (if different)
Barnstable
County
Certificate (if registered land)
5. This request is for certification that (check one):
7836
Book
DEP He Number:
SE3-1123
Provided by DEP
02026
Zip Code
307
Page
❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
® the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
construction of bulkhead and dredging; pier and platform not constructed
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information (com.)
DEP He Number:
SE3- l i zo
Provided by DEP
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-ofrice-
for-your-city-or-town. html).
wpaform8a.doc •• rev. 5/29/14 Paget oft
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
March 30, 2023
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-1123 13 Sagamore Road
d
Dear Commission Members:
tel.
(508)
3624541
fax(508)362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On May 16, 1991, the Commission issued an Order of Conditions for
construction of a wood bulkhead, dredging and to permit a platform
with ramp and floats within a man-made lagoon. Extensions were
granted, with the final expiration in 1999.
A site visit was made for the purpose of closing out the Order of
Conditions and to perform an as -built. The bulkhead was located
and found to be installed as proposed. Dredging was performed in
the 90's according to the owner's relative, but the lagoon has
since filled in. No platform or ramp with floats were installed.
This is to certify, to the best of my knowledge and belief, that
the work was performed in substantial compliance with the approved
plan and Order of Conditions, with the exceptions of the above. We
hereby request the issuance of a Certificate of Compliance at this
time.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
h
w
U
Z
Q
J
! / U
// O � � 0
��� Q =
z ~ �~ 2
b U
�� � � Q � 0 � (,� �
i `_o � WC o Q o
/J^ L _I
ono Z L.1� � � � � � _I N
O
Q � Q�R
� O O � d V J
C
� � � w ? W �' Q � LLB n'
o a � � Q � W (R � — Q
a o � � _ � W J
� � � �
v � (1i�
D Q Q� � r
� �
u�� A � � � Pb � e �
b � �Q � r
w G. w -
iJ X � .r ' �
W �7 } � � (n
� G /�/ J
V o �Q� Q.
��-----�� o � . e
QV o Cn % � ��gETTS � J
o � '�/ S�P� C3�by �O �
�J'l— a o ZQQ� y � Q
� z O W
D � �—
Q oa � �
Q �� �
_ w
a -° � F— �
v4 w
w .� �
iGj �
. -'�'—' 9 _ q .."
D � '
d O
v m e •C � Q �o
i i o
.�n.No v � .� � Q O
d°� � �X3 v ���Q
� O Q- �
� � � �a `i
g EK c7 � � � � V C J
° � N
o N o �
�`1 ��
lC;