Loading...
SE83-1585 REQ CORT OF COMPCONSERVATION OFFICE • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. Stu/, ac�c L�ipeicatian: 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. V 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzo(ayarmouth.ma.us. JSigned statement from an Engineer or similar professional to who prepared the approved plan. — Include in hardcopy and digital submission. f � As -Built plan —Include in hardcopy and digital submission. Refer to 310 CMR 10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if required*. JLocal filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(a�yarmouth.ma.us Rev 2/2023 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information Important: 1 When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. tab Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. This request is being made by: Laurie M. Gallagher Name 18 Lincoln Street Mailing Address Dedham, City/Town MA State This request is in reference to work regulated by a final Order of Conditions issued to: McShane Construction Applicant 3-13-02 Dated 3. The project site is located at: 13 Sagamore Road Street Address 29 Assessors Map/Plat Number SE83-1585 DEP File Number West Yarmouth City/Town 128 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Leonard Gallagher Property Owner (if different) Barnstable County Book Certificate (if registered land) 5. This request is for certific ation that (check one): DEP File Number: SE83-1585 Provided by DEP 02026 Zip Code I ❑ of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the work regulated by the above -referenced Order ® the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) DEP He Number: SE8O-1585 Provided by DEP 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or4own. html). �vpaform8a.doc •• rev. 5/29/14 Page 2 of 2 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design I March 30 , 2023 site planning down cape engineering, inc civil engineers & land surveyors Yarmouth Conservation Commission sewage system 1146 Route 28 designs South Yarmouth, MA 02664 inspections Re: Request for Certificate of Compliance SE 83-1585 (13 Sagamore Road) permits Dear Commission Members: tel. (508) 3624541 fax(508)362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E Craig J. Ferrari, E.I.T., S.E. On 3/13/2002, the Commission issued an Order of Conditions to McShane Construction for the above -referenced site, for the raze and replace of a dwelling. According to the owner's relatives, no work commenced on this project under this Order. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE,/PLS Down Cape Engineering, Inc. cc: Laurie and Mark Gallagher encl.