Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH .Z6 � EWAGE PLAN REVIEW CHECKLIST Location: AM 21 LOT r Date of Subdivision Approval Street / - G�� Zone of Contribution: In Out !Village / - ��1 Commercial Residential Owner: .i 4Gi' \/o2e S Installer �# Builder: Engineer � X, � i ./ . ` Z- «2.- 7 N/A YES NO 1. Required number of copies received. ✓- 2. Date of soils exam and percolation test not older than 2 years. ✓ 3. 4 feet of naturally occurring pervious material, above water table(new construction) .. 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. `----- 6. Benchmark indicated and shown- NGVD if near wetlands. 7. Building sewer does not exit center of house. �l 8. Septic tank a minimum of 10 feet from house and deck. �.----- 9. Leaching a minimum of 20 feet from house and 10 feet from deck. k------- 10. Leaching a minimum of 100 feet from wetlands. �--- 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. I 12. System meets all other setback requirements. u 13. Uses adjustment for maximum high groundwater. l> QpA � ---="' 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. ,/ 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. L------- 17. System meets slope requirements - min. 1/8". 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. L_----"' • 19. Specified tee sizes are proper. gas baffle on outlet tee. ,_....----- ---- 20. Sewage flow under 10,000 gpd for parcel. , 21. No garbage disposal. L- 22. System adequately sized for its intended use. l 23. Minimum 6" stone or mechanically compacted below the tank and d-box. `� 24. Manhole covers within 6" of grade - septic tank and pump chamber. ./`� 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box. alarm on separate circuit. L---- 27. Septic tank and pump chamber to be Factory waterproofed. ---__-- 28. Vent provided if leaching below 3 feet or under driveway or parking. - 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31 . H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. _ 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading., 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: „ • • 4 t 11,16 bee 4 111