HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
.Z6 � EWAGE PLAN REVIEW CHECKLIST
Location: AM 21 LOT r Date of Subdivision Approval
Street / - G�� Zone of Contribution: In Out
!Village / - ��1 Commercial Residential
Owner: .i 4Gi' \/o2e S Installer �#
Builder: Engineer � X, � i ./ .
` Z- «2.- 7
N/A YES NO
1. Required number of copies received. ✓-
2. Date of soils exam and percolation test not older than 2 years. ✓
3. 4 feet of naturally occurring pervious material, above water table(new construction) ..
4. Foundation 2 feet above high point of fronting road for new construction.
5. Water availability letter from Water Department for new construction. `-----
6. Benchmark indicated and shown- NGVD if near wetlands.
7. Building sewer does not exit center of house. �l
8. Septic tank a minimum of 10 feet from house and deck. �.-----
9. Leaching a minimum of 20 feet from house and 10 feet from deck. k-------
10. Leaching a minimum of 100 feet from wetlands. �---
11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. I
12. System meets all other setback requirements. u
13. Uses adjustment for maximum high groundwater. l> QpA � ---="'
14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. ,/
15. System not in top or subsoil or 5 foot removal.
16. Proposed contours are suitable. L-------
17. System meets slope requirements - min. 1/8". 1/4" preferred.
18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. L_----"'
• 19. Specified tee sizes are proper. gas baffle on outlet tee. ,_....-----
----
20. Sewage flow under 10,000 gpd for parcel. ,
21. No garbage disposal. L-
22. System adequately sized for its intended use. l
23. Minimum 6" stone or mechanically compacted below the tank and d-box. `�
24. Manhole covers within 6" of grade - septic tank and pump chamber. ./`�
25. Electrical permit for pump chamber.
26. Pump system - 2" line, weep hole, check valve, sanitary in d-box. alarm on separate circuit. L----
27. Septic tank and pump chamber to be Factory waterproofed. ---__--
28. Vent provided if leaching below 3 feet or under driveway or parking. -
29. Engineer to inspect and certify : a. clay removal
b. wall construction schedule
c. commercial system
30. Engineer and Land Surveyor stamp and signature.
31 . H2O loading when system subject to vehicular traffic.
32. Title V application and fee signed by a licensed installer.
33. Foundation footing 2 feet above adjusted water table. _
34. Lot subdivided prior to July 31, 1986 - Nitrate Loading.,
35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'.
Plan reviewed by:
„ •
• 4
t
11,16
bee
4
111