HomeMy WebLinkAboutCOC request 2939 main street rte 6a
yarmouth port
mass 02675
4/20/2023
FROM
down cape engineering, inc
civil engineers & land surveyors
TRANSMITTAL
HEATHER CORNELL
HCORNELLCDOWNCAPE.COM
TO: TOWN OF YARMOUTH
CONSERVATION COMMISSION
METHOD OF DELIVERY:
tel.(508)3624541
fax(508)362-9880
RE: 20-098 LETTERA
179 CENTER STREET
YARMOUTHPORT
MAP 140, PARCELS 33.1 & 33.2
REQUEST FOR A CERTIFICATE
OF COMPLIANCE
IN PERSON
PLEASE FIND ENCLOSED A CERTIFICATE OF COMPLIANCE REQUEST
FOR 179 CENTER STREET INCLUDING:
• YARMOUTH CHECKLIST
• STATEMENT FROM ENGINEER
• WPA FORM 8A
• SITE PHOTOS
• PROPOSED PLANTING PLAN 440-23
• $75 FILING FEE
CC: FILE
CONSERVATION
OFFICE
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office -mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirien�o(a�_,`yarmouth.ma.us.
Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*.
Local filing fee. Refer to Fee Schedule.
and include property address in memo.
Make check payable to "Town of Yarmouth"
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno cryarmouth.ma.us
Rev 8/2022
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
April 109 2023
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Ref: 179 Center Street, Yarmouth Port (SE83-2265)
Dear Commission Members:
tel. (508) 362-4541
fax (508) 36M880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On September 4, 2020, the Commission issued an Order of Conditions for the above -
referenced site, for the construction of proposed additions to the existing dwelling.
A Certificate of Compliance request was denied on October 20, 2022 and an
enforcement order was issued for mowing within the area of wetland flags Al-A4. The
mowing has ceased and as requested an asbuilt plan has been provided which shows the
unpermitted AC/generator pad and patio area. The patio area replaced an existing paved
driveway. After consultation with the client, we are proposing to plant 4 native shrubs
within the mowed resource area and allow an additional 34' strip of lawn to re -
naturalize beyond the proposed plantings. Stones will be placed along this "no mow"
area to ensure it remains natural.
We feel that while not on the original approved plan, the unperrriitted work was
relatively minor in scope and will not adversely affect the resource areas. The proposed
plantings and enhanced natural area will provide an additional buffer to the BVW.
We respectfully request the issuance of a Certificate of Compliance.
Thank you for your consideration.
Vezy truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance Provided
SE 5
q ded by DEP
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information
1. This request is being made by:
MICHAEL & LESLIE LETTERA
Name
2001 EAST 2ND AVENUE UNIT 10C
Mailing Address
TAM PA FL 33605
City/Town State Zip Code
678-525-0168
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
MICHAEL &LESLIE LETTERA
Applicant
1-27-2021 SE83-2265
DEP File Number
3. The project site is located at:
179 CENTER STREET YARMOUTH
Street Address City/Town
140 33.1 & 33.2
Assessors Map/Plat Number Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
5.
MICHAEL &LESLIE LETTERA
Property Owner (if different)
BARNSTABLE
County
33755
Book
Certificate (if registered land)
This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
Page 1 of 2
wpaform8a.doc •• rev. 5/29/14
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-2265
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information (cont.
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www, mass gov/eea/agencies/massdep/about/contacts/find-the-massdep-regionakoffice-
for-your-city-or-town. html).
wpaform8a.doc ••rev. 5/29/14 Page 2 of 2
1
ll . -5" .:MK:m - *vA
♦ � It f: IV
•14
400 IF
'Ifr
r
IF I
ALI
For
MINE
i--
e
-
4JONIk-.
'ram. -;�' `M• 1'I+f,r IF
low
WI I
410at •zi0 *,. I ILuJL
I' p..
`.9 i 1. • f .',� rf 3- . q. IV
-
Is
x
b. r
INN
t'
IMF,
_.. `>
hj
t Y FR�e -'+ 17
1•
I•
IF
iVP
jr IF
ILL V
I Irk it
� M
IbL I, (
ILLr r
L IF IF
r:
' • aq ,IL SPA
IM
ARIa
x M 7 '�i • I
It IN
4
d-
V
CPROPOSED
LA
BORDERING VEGETATE — — EDWETLAND I(TYPO
/ LOWBUSH4PLANTIN Q
_ 12 %RCH
OPEN
FIELD
(DCE #20-098
6
\
16"CDR
20"
PROPOSED NO MOW 20'CDR
AREA. ALLOW TO
RE —NATURALIZE.
PLACE STONE
MARKERS ALONG EDGE
O MIN. 10' ON CENTER
�3
16° PR
FBI
'`Ik`� tNN
AL�-
1 R
A
�-- D-PASF. 6
�5 BY GRAVEL
UP
"SPR -
16R D E K /
PA 10 cP / ' PAVED
DRIVE
01
_ EXISTING
DWELLING I I
TOP OF I I
PATIO DECK FNDN EL. I I
1961 I
� I I
o I
Scale:1 "= 20'
0 10 20 30 40 50 FEET
OF
179 CENTER STREET
PREPARED FOR
DATE: APRIL 10, 2023
off 508-362-4541
fax 508-362-9880
downcape.com
wn cape eng1 ineering, inc.
civil engineers
land surveyors
939 Main Street ( Rte 6A)
YARMOUTHPORT MA 02675
20-098 LETTERA.DWG