HomeMy WebLinkAboutEngineer Plani
10,� Map 122
Mop 122 43 . Parcel 24.1
Parcel 33
/ 35
Existing \ 0,
Notes Garage/Barn
1.) Assessor's Map 122 Parcel 34
2.) Book 29134 Pg. 223 \ / Proposed �' 36 / Proposed 35
3.) Plan Book 181 Page 23 \\ 2" PVC / Garage/Barr�/ —
4.) This property is not in a L `38 6 <\ Stab EL = 37.0/ /\
Groundwater Protection District �510 TP Dg Fj \ /
5.) This property is not in the Flood Zone
x x x
N 32 \ #1 �� \ ��,\ // 36
\ \ x x x AS \ / �� 8�Q9 sj. �.O,jJ
40 -� x x x x
x x x x x x r
X
\ x x x tk <� % �G
Q
o
o
r LOCUS
o
06A
0..
Route v
-0
C
_CD
(n J
3
o
ZI
I
Yarmouth Port, MA
SITE LOCUS
/
N.T.S.
RECEIVED
APR 10 2023
HEALTH DEPT.
x x x x /
See x x See , Proposed
Note d? x x x s, Excavation OF,ygsS
ST \ #19 rD�ed x x �Notes �� D Septic Plan
x
,` � \ � h•L° - located at
R.
138 , ' G,�.\ vent �h 21 142 Route 6A
36 Ma 122 �G/STERN i
,. �, /�\ House #142 p
\ �' Parcel 35 �r Yarmouth Port, MA
�° � \ �- Bedroom � / �,.' / / 38 ,3
��`�O / \ \ TOF EL 42.0 Prepared for:
r' \\ , 0, �°� // N 74°48'1,0 1�\
Parcel A ��\°`� �� 23.04 i \ Owners: Vincent Zuccala
12,310± SF / \\ , / / / �� / / \ , / \ Vincent J. Zuccala
/ / \ �, Toryn R, Zuccalo Prepared by:
/ / oo 1130 Union Street
All Cape Septic,,clnd Survey
Manchester, NH
618 Route* 28
4 / /,, i , vDeed Reference:
/ West Yarmouth, MA 02673
� C / °
/ \ �/ / / / 508 771— 4200
/ c. °� / / Deed Book 29134
�O Page 223 ticopeseptic@gmoil.com
t` �� 9, `��/ / / House #146
�b� to \ \ \ �s� / / / j / Yarmouth Health Departmen>tDa e: 8/22/22 Scale: 1" = 20'
��' \� /2/ a�P��NOFA�gs APPROVED evised Date: 4/05/23
� C'� CA L- )�
ci, y / / < \ z STEPHEN y
S. e Date RAPHIC SCALE
NOTE:
2 LOCATION OF UTILITIES IS APPROXIMATE AND ALL P 20 0 10 20 40
UNDERGROUND AND OVERHEAD UTILITIES MUST BE �nasS
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO, /6 Z ( IN FEET )
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES
i inch = 20 ft.
AND THE LOCAL WATER DEPARTMENT.
Dwg. No. AC-483
80 1
CONSTRUCTION NOTES
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000):
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
3,) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4,) COVERS OVER THE INLET AND OUTLET TEES OF THE .SEPTIC TANK, THE DISTRIBUTION BOX, AND
THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE, LEACHING
FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED 39:0±
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM NTH A CAP, TIED WITH MAGNETIC Existin
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE,
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN 1% OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7,) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10,) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
11) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER,
14,) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER, THE DESIGNER SHALL CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS,
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY; FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
(INCLUDING EXISTING SEPTIC TANK)
EXCAVATION NOTES
1) EXCAVATE ALL MATERIAL ABOVE SOIL HORIZON C2 (SEE DEEP OBSERVATION
HOLE LOG) WHERE POSSIBLE FOR A LATERAL DISTANCE OF 5'
IN ALL DIRECTIONS BEYOND THE OUTER PERIMETER OF THE LEACHING AREA.
2) FILL MATERIAL SHALL CONSIST OF CLEAN GRANULAR SAND, FREE FROM ORGANIC
MATTER AND OTHER DELETERIOUS SUBSTANCES, WHICH MEETS THE TEXTURAL
CRITERIA PUT FORTH IN SECTION 15.255(3) OF TITLE 5.
3) SCARIFY THE BOTTOM SURFACE OF THE EXCAVATION PRIOR TO PLACEMENT
OF FILL INTO THE RETAINING STRUCTURE.
4) PLACE FILL ONLY WHEN BOTTOM SURFACE IS DRY.
EL=42.0±
41,0±
/ /. "i
RAISE MIN. 20" DI
TO WITHIN 6" OF
EL `40.0±
EXISTING
1,000 GALLON t 40'± ——'t
SEPTIC TANK
Test Hole 1 (EL=37,5±) TEST HOLE LOG
Depth
Elev.
Loyer
Soil Class
Soil Color
Other
0"-10"
36.7
A
Loamy Sand
10YR3/2
10"-48"
315
B
Loamy Sand
10YR5/4
48"-9$"
29.3
C1
Silty Loom
10YR4/4
98"-154"
24.7
C2
Medium
Sand
IOYR6/4
DATE OF TESTING: 08/11/22
SOIL EVALUATOR: MARK POLSELLI
WITNESS: JAY GARDINER YARMOUTH HEALTH AGENT
PERCOLATION RATE HOLE #1: LESS THAN < 2 MIN/INCH SEE SEIVE TEST
NO GROUNDWATER ENCOUNTERED
NO MOTTLING ENCOUNTERED
AISE MIN. 20" DIAMETER COVER
TO WITHIN 6" OF FINISH GRADE
FLOW PROFILE
NOT TO SCALE
EL=37.0±
EL= 36.0±
o.
M ;p
GEOTEXTILE
FABRIC
IFilter Fabric Inspection
Port
33.5
22' x 28' Leach Field
WITH FOUR 4" SCH 40 PERF. PVC PIPE
SET AT 0.005 SLOPE ON 6" DOUBLE
WASHED 3/4"-1 1/2" STONE
BOTTOM TEST HC
SYSTEM DESIGN CALCULATIONS
SEWAGE DESIGN FLOW REQUIRED: 4 BEDROOM DWELLING
110 GPD / BEDROOM = 440 GPD REQUIRED
SEWAGE DESIGN FLOW PROVIDED: 22' X 28' LEACHFIELD WITH FOUR SCH. 40
PERF. PVC PIPE
CAPACITY 22' X 28' = 616 SO FT
480 SF X 0.74 GPD/SF = 455 GPD
455 GPD PROVIDED > 440 GPD REQUIRED
SEPTIC TANK CAPACITY PROVIDED: EXISTING 1000 GALLON SEPTIC TANK
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
DA
34.0
.1' .
Proposed Septic Plan
Located at
142 Route 6A
Yarmouth Port, MA
Prepared for:
Vincent Zuccala
Prepared by:
All Cape Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcapeseptic@gmail.com
Date: 08/22/22
Revised Dote: 04/05/23
Vent
Port
EL 24.7
Sheet 2 of 2
Project No. AC-483