Loading...
HomeMy WebLinkAboutReview Checklist1 TOWN OF YARMOUTH . SEWAGE PLAN REVIEW CHECKLIST Location: AM /D/ LOT 6,32-.. Date of Subdivision Approval Street /44S v<-'74 ' ige-•( Zone of Contribution: In Out Village ( wfr).44,1-- Commercial Residential Owner: 1 a_&>/&'Ge l/Y /' Installer ie Ec a _-- Builder: 7 Engineer /-c� N/A YES NO 1. Required number of copies received. `1( 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material. above water table(new construction) , X 4. Foundation 2 feet above high point of fronting road for new construction. AZikd i'Il`Ile . 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown - NGVD if near wetlands. •x 7. Building sewer does not exit center of house. �C 8. Septic tank a minimum of 10 feet from house and deck. X 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinkinu wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. ?‹. 14. Leaching 4 -5 feet above adjusted w r bottom of test pit. J 15. System not in top or subsoil oot remova ...*__ 16. Proposed contours are suita 17. System meets slope requirements - min. 1/8". 1/4" preferred. X 18. System meets breakout requirements - peastone elevation carried out 15 feet minimum. ?� 19. Specified tee sizes are proper. gas baffle on outlet tee. -20. Sewage flow under 10,000 apd for parcel. X 21. No garbage disposal. �C 22. System adequately sized for its intended use. )C -23. Minimum 6" stone or mechanically compacted below the tank and d-box. sC 24. Manhole covers within 6" of grade - septic tank and pump chamber. X 25. Electrical permit for pump chamber. X 26. Pump system - 2" line, weep hole. check valve. sanitary in d-box. alarm on separate circuit. X 27. Septic tank andpumpchamber to be Factory waterproofed. P rP 28. Vent provided if leaching below 3 feet or under drivewayor parking. o ded arkm P t, _ P g 29. Engineer to inspect and certify . a. clay removal b. wall construction schedule c. commercial system XC 30. Engineer and Land Surveyor stamp and signature. 3( 31. H2O loading when system subject to vehicular traffic. >C' 32. Title V application and fee signed by a licensed installer. X 33. Foundation tooting 2 feet above adjusted water table. X 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. i � Plan reviewed by: i!•f A -liwcd4C i , /62 0 �,e,• /; 0 1/rbeiar • 3e